Forwards Revised Pages 3/4 3-33,3/4 3-34,B3/4 3-1,B3/4 3-2, B3/4 3-2a,B3/4 3-4 & B3/4 3-8 to Suppl 921207 Application for Amend to License NPF-68 Re Operator Actions During Repair of Surveillance Channels,Per 930401 Talks W/Nrc
ML20035D080
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/02/1993
From: Carns N
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20035D081 List:
References
NMP2L-1375, TAC-M85168, NUDOCS 9304120116
Download: ML20035D080 (1)


Text

.

)

\\

M Y N!AGARA i

~

IluMOHAWK 1

)

N!NE MILE POINT NUCLEAR STATION /P.O. BOX 32, LYCOMING, N.Y.13093/ TELEPHONE (315) 349 2447 i

Neil S. Bazz"Carns Vice Prescent April 2,1993 Nuclear Generaton NMP2L 1375 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:

Nine Mile Point Unit 2 Docket No. 50-410 NPF-69 frac No. M85168)

Gentlemen:

Niagara Mohawk Power Corporation hereby transmits revised pages 3/4 3-33, 3/4 3-34, B3/4 3-1, B3/4 3-2, B3/4 3-2a, B3/4 3-4, B3/4 3-4a and B3/4 3-8 for the proposed Technical Specification amendment dated December 7,1992. These pages have been revised to clarify and provide bases for operator actions during surveillance and repair of instrument channels. This revision will further strengthen the prevention of " Loss of Function" for the Initiation and Actuation Instrumentation. The revision to the wording of the allowable out-of-service times does not alter the original meaning or intent of the General Electric Licensing Topical Reports or the BWROG Owners' Group clarifications. This revision has been reviewed in accordance with Section 6.5 of the Technical Specification and no changes to the No Significant Hazards Consideration are required. Also, index page xvi has been added to reflect the above changes.

This change was discussed with the Nine Mile Point Unit 2 Project Manager, Mr. J. E. Menning and Mr. C. S. Schulten on April 1,1993.

Should you have any questions or comments on this transmittal, do not hesitate to contact us.

Sincerely, M

Mr. N. S Carns Vice President - Nuclear Generation WCD/Imc Attachments xc:

Mr. T. T. Martin, Regional Administrator, Region 1 Mr. W. L. Schmidt, Senior Resident inspector Mr. R. A. Capra, Director, Project Directorate I-1, NRR Mr. J. E. Menning, Project Manager, NRR Ms. Donna Ross Division of Policy Analysis and Planning y

g7 New York State Energy Office 6f Agency Building 2, Empire State Plaza Albany, NY 12223 lll Records Management 9304120116 930402 PDR ADOCK 05000410 p