CONTAINMENT SYSTEMS 3/4.6.4 VACUUM RELIEF SUPPRESSION CHAMBER - DRYWELL VACUUM BREAKERS g
LIMITING CONDITION FOR OPERATION 3.E.4.1 All suppression chamber - drywell vacuum breakers shall be closed and' OPERABLE.
j APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
i a.
With one of the above required vacuum breakers inoperable for opening but known to be closed, restore the inoperable vacuum breaker to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
With one or more suppression chamber - drywell vacuum breakers open, close the open vacuum breaker (s) within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN.
within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
c.
With one of the position indicators of any suppression chamber -
drywell vacuum breakers inoperable, verify that all other vacuum breakers are closed within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and:
1.
Verify the vacuum breaker (s) with the inoperable position indicator to be closed by demonstrating the other indicator to be OPERABLE within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 14 days thereafter, or 2.
Verify the vacuum breaker (s) with the inoperable position indicator to be closed by conducting a test which I
demonstrates that the drywell-to-suppression chamber AP is maintained at greater than or equal to 0.5 psi for one hour without makeup within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 14 days thereafter.
Otherwise, be in at.least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d.
With one of the closed position indicators of one or more suppression chamber - drywell vacuum breakar(s) indicating open
'i and the redundant closed position indicator indicating closed after a suppression chamber - drywell vacuum breaker opening as a result of a steam release, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, cycle the applicable valve (s) to determine which of the redundant indicators is OPERABLE..
9304010193 930323 PER AcihCK OtH)D0341 P
PDR FERMI - UNIT 2 3/4 6-48 Amendrent No. 77, jf.-
j i
i
~
e CQNTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.4.1 Each suppression chamber - drywell vacuum breaker shall be:
a.
Verified closed at least once per 7 days.
b.
Demonstrated OPERABLE:
1.
During each COLD SHUTDOWN, if not performed within the previous 92 days, and within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after any discharge of' steam to the suppression enamber from the safety / relief-valves by:
a)
Cycling each vacuum breaker through at least one complete cycle of full travel.
b)
Verifying both position indicators OPERABLE by observing expected valve movement during the cycling test.
l 2.
At least once per 18 months by;
[
a)
Verifying the opening setpoint, from the closed position, to be less than or equal to 0.5 psid, and b)
Verifying both position indicators OPERABLE by performance of a CHANNEL CALIBRATION.
c)
Verify the opening gap for switch actuation to be less than or equal to 0.03 inches.
FERMI - UNIT 2 3/4 6-49 Amendment No.
.