ML20035A860

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 930316 to Discuss Edsfi & Svc Water Insps
ML20035A860
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/12/1993
From: Landis K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9303300069
Download: ML20035A860 (2)


Text

1 f.

\\

MAR 121993 i

NOTICE OF SIGNIFICANT MEETING j

i Name of Licensee:

Florida Power Corporation i

Name of Facility: Crystal River

.j Docket Numbers:

50-302 j

Date and Time of Meeting: March 16, 1993, at 9:30 a.m.

l Location of Meeting: Region II Office, Atlanta, Georgia, 30th Floor Conference Room i

Purpose of Meeting: Discussion of EDSFI and Service Water Inspections j

t NRC Attendees:

E. W. Merschoff, Director, Division of Reactor Projects (DRP), Region II A. F. Gibson, Director, Division of Reactor Safety (DRS), RII i

H. N. Berkow, Director, Project Directorate 11-'2, Office of Nuclear Reactor

.i Regulation (NRR) l M. V. Sinkule, Chief, Reactor Projects Branch 2, DRP, RII t

H. Silver, Project Manager, Crystal River, NRR K. D. Landis, Chief, Projects Section 28, DRP, RII i

R. J. Freudenberger, Resident Inspector, Crystal River A. R. Long, Project Engineer, Reactor Projects Section 28, DRP, RII Licensee Attendees

.[

P. R. Tanguay, Director, Nuclear Operations Engineering and Projects M

K. R. Wilson, Manager, Nuclear Licensing j

J. Maseda, Manager, Engineering i

D. Shook, Staff Engineer A. Friend, Licensing Engineer i

i 9303300069 930312 1

PDR-ADOCK 05000302

(

G-PDR

'(

f$'/6

^

f f

r

~

MAR 121993 Notice of Sifnificant Meeting 3

NOTE: Attendance by NRC personnel at this NRC/ Licensee meeting should be made known by 4:00 p.m., March 15, 1993, via telephone call to A. R. Long, (404) 331-4664.

i T.pproved by

[

K. D. Landis, Chief i

Reactor Projects, Section 2B l

Division of Reactor Projects Distribution:

J. M. Taylor, Executive Director for Operations T. E. Murley, Director, Office of Nuclear Reactor Regulation l

(NRR)

J. H. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research J. G. Partlow, Associate Director for Projects, NRR H. L. Thompson, Jr., Deputy Executive Director for Nuclear Materials Safety, Safeguards and Operations Support S. A. Varga, Director, Division of Reactor Projects I/II, NRR i

H. N. Berkow, Director, Project Directorate 11-2, NRR H. Silver, Project Manager, Crystal River, NRR L. R. Plisco, Regional Coordinator, EDO bcc:

S. D. Ebneter, RII E. W. Merschoff, RII

)

L. A. Reyes, RII K. D. Landis, RII

)

A. F. Gibson, RII R. P. Schin, RII J. P. Stohr, RII All NRC Attendees R. J. Maley, RII Public Document Room G. R. Jenkins, RII K. M. Clark, RII J. R. Johnson, RII M. V. Sinkule, RII H. N. Berkow, NRR A. R. Long, RII Silver, NRR i

Holmes-Ray, Crystal River 1

R RP RI; f P RII:DRP RI DP tN t ng KLa is Sinkule AGi V

03/g /93 03/\\\\ /93 034%/93 03/4/93 s

DOCUMENT NAME G:CR-MTG.ARL i

i

,.