Forwards Suppl SE Finding Licensee Commitment to Implement GIP-2,including Both SQUG Commitments & Implementation Guidance Acceptable for Resolving USI A-46,based on 930119 Response to GL 87-02 & 930303 Telcon
ML20035A288
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/19/1993
From: Hebdon F
Office of Nuclear Reactor Regulation
To: Medford M
Tennessee Valley Authority
Shared Package
ML20035A289 List:
References
GL-87-002, REF-GTECI-A-46, REF-GTECI-SC, TAC-M69430, TAC-M69431, TAC-M69432, TASK-A-46, TASK-OR NUDOCS 9303250094
Download: ML20035A288 (4)


Text

eME3g'o UNITED STATES g

.[

([s g

NUCLEAR REGULATORY COMMISSION E

WASHINGTON D.C.20555

%, V p' March 19, 1993 Occket Nos. 50-259, 50-260 and 50-296 Tennessee Valley Authority ATTN: Dr. Mark 0. Medford, Vice President Nuclear Assurance, Licensing and Fuels 3B Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801

Dear Dr. Medford:

SUBJECT:

GENERIC LETTI.R 87-02, SUPPLEMENT 1 RESPONSE - BROWNS FERRY NUCLEAR PLANT (TAC NCS. M69430, M69431, AND M69432)

By letter dated September 21, 1992, the Tennessee Valley Authority (TVA),

submitted its response to Supplement No. I to Generic Letter (GL) 87-02,

" Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46," for the Browns Ferry Nuclear Plant (BFN), Units 1, 2 and 3.

Supplement No. I was issued to all USI A-46 plants on May 22, 1992.

This supplement transmitted the NRC Supplemental Safety Evaluation Report (SSER) No. 2 on the final version of the Seismic Qualification Utility Group's (SQUG) Generic Implementation Procedure (GIP),

Revision 2, as corrected on February 14, 1992 (GIP-2).

By letter dated November 19, 1992, the NRC staff issued a safety evaluation of TVA's GL 87-02, Supplement I response. This safety evaluation concluded that certain aspects of TVA's response were unclear or unacceptable, and as such additional information was required. TVA submitted its response to the staff's request for aaoitional information by ietter dated Jetiuary 19, 1993.

In addition to reviewing the information contained in TVA's January 19, 1993 response the staff held a conference call with TVA on March 3, 1993. During this conference call, TVA clarified that, for resolution of USI A-46, it did com. nit to comply with the entire GIP-2, including both the SQUG commitments and the implementation guidance. The NRC staff has now completed its review of TVA's responses to GL 87-02, Supplement 1.

The detailed results of this review are documented in the enclosed supplemental safety evaluation.

The staff considers TVA's commitment to comply with GIP-2 is an acceptable method for resolving USI A-46 at BFN. The staff also accepts TVA's commitment to complete its USI A-46 implementation program at BFN, Units 2 and 3, by March 19, 1996.

Furthermore, the staff finds it acceptable for TVA to complete the portion of its USI A-46 program for BFN, Unit 3 that pertains to conduit (not flexible' conduit) and cable trays, including their supports, prior to Unit 3 restart in lieu of prior restart commitments. TVA's schedule i

for completing its USI A-46 implementatien program at Unit I has been previously approved by the staff.

In its letter of November 19, 1992, the staff also requested TVA to provide additional information as to how it intended to resolve concerns with flexible q

9303250074' 93o339 p p p f" p W G F W 2

yDR ADOCK 05000259 Y"

'^

l 1

PDR I

i Dr. Mark 0. Medford.j conduit at BFN Units 1, 2 and 3.

With regard to flexible conduit not attached' to electrical equipment covered by 10 CFR 50.49 (i.e., important to safety but located in a mild environnient), TVA indicated that it plans to evaluate such conduit using GIP-2, Section 8 and Appendix D.

The staff accepts TVA's planned approach. However, GIP-2, Appendix D does not prescribe a specific procedure or criteria for performing these evaluations. Therefore, TVA is requested to provide a description of the general approach, including the procedure and acceptance criteria, that it will use to evaluate the seismic i

adequacy of flexible conduit not attached to electrical equipment covered by 10 CFR 50.49.

With regard to flexible conduit attached to electrical equipment covered by 10 CFR 50.49, the staff notes that this issue is not entirely within the scope of USI A-46, and in the future, should be addressed separately from USI A-46.

4 However, since the issue was identified during the review of TVA's original response to GL 87-02, Supplement 1, the staff has included it in the enclosed supplemental safety evaluation. For Units 1 and 3, the staff considers TVA's plan to inspect and evaluate this flexible conduit prior to unit restart, l

using the interim criteria approved for Unit 2 restart, is acceptable on an interim basis to support unit restart efforts. TVA is requested to submit its long term criteria for staff review and approval, or alternatively, provide a i

justification why the interim criteria used for Unit 2 restart is adequate for long term application for Units 1, 2 and 3.

Any future submittals concerning

[

flexible conduit attached to electrical equipment covered by 10 CFR 50.49 should be made separate from the resolution of USI A-46.

All additional information requested by this letter should be submitted to the l

Nor no liter than Septembcr 20,199;.

)

a 3

This requirement affects 9 or fewer respondents and, therefore, is not subject to the Office of Management and Budget review under P.L.96-511.

Sincerely, i

Original signed by Thierry M. Ross for l

l l

Frederick J. Hebdon, Director Project Directorate 11-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Enclosure-1 Supplemental Safety Evaluation

}

cc w/ enclosure:

See next page OFC PDII-4/LA >

PDil-4/PM PDil-4/PM PDII-4/D NAME hMSaid Y TRoss:as /N JWilliah,.

FHebdoM (

y e

rm DATE 3 / 6'93 3 / f 6/93

% //9/93 3 //9/93 I

t

1 Tennessee Valley Authority Browns Ferry Nuclear Plant j

ATTN: Dr. Mark 0. Medford l

t CC.

Mr. John B. Waters, Chairman State Health Officer Tennessee Valley Authority Alabama Dept. of Public Health ET 12A 434 Monroe Street 400 West Summit Hill Drive Montgomery, Alabama 36130-1701 Knoxville, Tennessee 37902

^

Mr. J. R. Bynum, Vice President Regional Administrator Nuclear Operations U.S.N.R.C. Region 11

+

3B Lookout Place 101 Marietta Street, N.W.

1101 Market Street Suite 2900 Chattanooga, Tennessee 37402-2801 Atlanta, Georgia 30323 Mr. Charles Patterson Site Licensing Manager Seninr Resident Inspector Browns Ferry Nuclear Plant Browns Ferry Nuclear Plant Tennessee Valley Authority U.S.N.R.C.

t P.O. Box 2000 Route 12 Box 637 Decatur, Alabama 35602 Athens, Alabama 35611 Mr. O. J. Zeringue, Vice President Site Quality Manager i

Browns Ferry Nuclear Plant Browns Ferry Nuclear Plant lennessee valley Authority Tenne::se Valley Authority j

P.O. Box 2000 P. O. Box 2000 t

Decatur, Alabama 35602 Decatur, Alabama 35602 Mr. M. J. Brizynski, Manager Nuclear Licensing and Regulatory Affairs 5B Lookout Place t

Chattanooga, Tennessee 37402-2801 TVA Representative Tennessee Valley Authority 11921 Rockville Pike Suite 402 Rockville, Maryland 20852 General Counsel Tennessee Valley Authority ET 11H 400 West Summit Hill Drive Knoxville, Tennessee 37902 Chairman, Limestone County Commission l

P.O. Box 188 Athens, Alabama 35611 t

9

Distribution I

, Docket. File".

NRC & Local PDRs BFN Reading SVarga Glainas FHebdon MSanders i

TRoss i

JWilliams MMcBrearty 1.

YKim OGC i

ACRS (10)

E. Merschoff, RII P. Frederickson, RIl C. Patterson, RII t

i f

t

[

i 6

I I

.i

?

i I

l t

a f

e

.