Notice of Violation from Insp on 930112-0222.Violation Noted:From Initial Operation Until 930205,logic Sys Functional Tests Not Performed
ML20034H796
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 03/12/1992
From: Beverly Clayton
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20034H787 List:
References
50-254-93-04, 50-254-93-4, 50-265-93-04, 50-265-93-4, NUDOCS 9303220086
Download: ML20034H796 (1)


Text

..

i y-i

i

Quad Cities Units'I and 2 License Nos._DPR-29; DPR-30,,

l

?

?

~

During an NRC inspection conducted on January 12'through February ~22, 1993, a t

violation of NRC requirements was identified.

In accordance with the. General d

Statement of Policy and Procedure.for NRC Enforcement Actions," 10 CFR Part 2,

_ j l

Appendix C (1992), the following violation is listed below*

Technical Specifications 4.5.C.5 and 4.5.E.5, High Pressure Coolant Injection Subsystem (HPCI) and Reactor Core' Isolation Cooling. (RCIC) respectively, require a logic system functional test at each refueling outage. Technical Specification 1.k, Definitions, defines a logic 1

system functional test as a test of all relays.and contacts of a logic circuit from sensor to activated device, to ensure operability per design intent.

Contrary to the above, from initial operation until' February 5,1993,.

the licensee did not-perform logic system functional tests' for-the automatic suction transfer circuit for the HPCI and RCIC systems.

- This is a Severity-Level IV violation (Supplement 1).

Pursuant to the provisions of 10 CFR 2.201, Commonwealth Edison Company is hereby required to submit a written statement.of explanation'to the U.S.-.

Nuclear. Regulatory Commission,' ATTN: Document-Control Desk, Washington D.C.

3 20555 with a copy to the U.S. Nuclear Regulatory Commission,: Region III 799 Roosevelt Road, Glen Ellyn, Illinois, 60137,' and a copy to the NRC L.

j Resident Inspector at the Quad Cities Nuclear Station within 30 days of the. - -

1 date of the letter transmitting this Notice of Violation:(Notice). This reply _

l should be clearly marked as a " Reply to _a-Notice of Violation" and should.

include for each violation:

(1) the reason for the. violation or, if-contested, the basis for disputing the violation,l(2)~the corrective steps that have_been taken and the results achieved,-(3) the-corrective' steps'that will be taken to avoid further violations,'and (4) the date when full compliance will be achieved.

If an adequate reply isLnot received within the-i time specified. in this Notice, an. order or a demand for information may be issued as to why the license should not be modified, suspended,.or revoked, or--

why such other action'as may.be proper should not be'taken. Where: good cause is shown, consideration will be given to extending the response time.

q

-i 0

Dated at Glen Ellyn, Illinois Brent Clayton, Chief _

this 3 2. day of MMz/.

1992 Reactor Projects Branch-1 j

9303220086 930312 4

=PDR ADOCK 05000254 0"

PDR-.

t