Describes Discrepancy in Inservice Insp & Testing Program & Corrective Actions to Resolve Discrepancy.Leakage Walkdown of Entire Containment Penetration Cooling Sys Performed to Identify & Record Leakage
ML20034H702
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/12/1993
From: Mccarthy D
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS-93-020, NLS-93-20, NUDOCS 9303190255
Download: ML20034H702 (2)


Text

Eh

]~

~

i Ei s

t

~! w w.

if q

C9&L i

! Carolina Power & Ught Company m

N I 2 IS93

- SERIAL: NLS-93-020 l

United States Nuclear Regulatory Commission

.j ATTENTION: Document Control Desk Washington, DC 20555 Li l

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 & 50-324/ LICENSE NOS DPR-71 & DPR-62 INSERVICE INSPECTION / TESTING PROGRAM j,

y Gentlemen:

1 The purpose of this letter is to inform the NRC of a discrepancy identified in the Inservice -

Inspection and Testing Program at Carolina Power & Light Company's Brunswick Steam Electric Plant, Unit Nos.1 and 2. This letter also identities the corrective actions being taken to resolve

.j this discrepancy.

1 The current in-Service inspection (ISI) and Testing (IST) program for the Brunswick Plant is being '

conducted in accordance with the requirements of the ASME Code, Section 'XI,1980 Edition /

Winter 1981 Addendum, as described in Revision 1 of the Brunswick Plant inservice inspection

'1 Program. A copy of the program was submitted to the NRC by letter dated August 19,1987 q

(Serial: NLS-87-159).

?

The Brunswick Plant is performing an independent assessment of the Brunswick ISI/IST Program.'

1 During this assessment; it was noted that, due to an inappropriate boundary classification; the"

~

Containment Penetration Cooling System had been incorrectly classified as a non-class system i instead of the correct designation as a Class 2 system. The inappropriate bo' ndary classification -

u

-existed during the first 10-year interval, which concluded in 1986. As a. result of this inappropriate classification, CP&L did not perform the ASME Code'Section XI testing activities for Class 2-components and piping'in the Containment Penetration Cooling System during the first ten-year 7.

interval. The specific testing not conducted was a hydrostatic test of the Containment Penetration Cooling System in accordance with Section XI of the ASME Code, Paragraphs IWA-5000 and ~

j IWC-5000.

I Although the Containment Penetration Cooling System had been identified as an ASME non-classed system, alternate test activities have been performed during both ten-year intervals that provide.

adequate assurance of the quality and safety of the affected lines, including:

1.

. A local leak rate test (LLRT) has been performed during each refueling outage using :-

air at a pressure of 93 psig as the test medium.. The acceptance criteria was established at 8.0 scfh, a small fraction of the' total allowable leakage. Review of.

m the latest LLRT data for each unit has indicated leakage rates of 0.155 scfh (Unit 1;.

j November 13,1992) and 2.163 scfh (Unit 2, December 12,1992). Carolina Power

& Light Company believes that the 10 CFR 50f Appendix J leakage results are an

'i excellent indicator of system integrity. This LLRT is considered conservativeJ because the test includes the combined leakages from the Reactor Building Closed Cooling Water (RBCCW) System and the Penetration Cooling Systemi since these '

J systems are tested together.-

r f

I h

f g ca -n street.. P, o.. sox 1551. note,g% N c; 27so2 n

E PDR-ADOCK'05000324" M :

~'

1 4Po

-PDR-A, g

g

.]

=-

1..

f~4 L

Dbcument Control Desk I

' NLS-93-020 / Page 2 2.

A visual walkdown inspection to identify leakage is performed every 401.10 months on the Containment Penetration Cooling System to satisfy an initial condition for the Integrated Leak Rate Test (ILRT). This walkdown is performed to identify and record leakage within the Containment Penetration.

Cooling System and has historically been performed by either Inservice inspection or '

t Ouality Control personnel. No system leakage was identified during the last (LRT for either Unit 1 or Unit 2. Although a 10 minute hold time and the use of a VT 2 -

examiner are not specifically addressed in the ILRT procedure, the non-insulated Containment Penetration Cooling System ordinarily remains in constant service, and the personnel who have performed the system leakage walkdown have typically been VT-2 qualified.

CP&L believes that the leakage walkdown of the entire Containment Penetration Cooling System every 401 10 months, in conjunction with the local leak rate test performed every refueling outage, provides a more frequent and higher quality testing than required by the ASME Code,Section XI and Code Case N-498; therefore, based oa the alternate testing results described above, and the recent adoption of ASME Code Case N-498 (Reference NLS-92-300, dated December 22, 1992), which allows alternative testing in lieu of performing the hydrostatic test required by the ASME Code,Section XI, paragraphs IWA-5000 and IWC-5000, CPSL does not plan to perform a belated hydrostatic test on the Containment Penetration Cooling System from the first ten-year r

interval.

Please refer any questions regarding this submittal to Mr. D. B. Waters at (919) 546-3678.

Yours very truly, f

J ^

i

. D. C. McCarthy Manar,er Nuclear Licensing Section KAH/kah (nts93020.003).

f cc:

- Mr. S. D. Ebneter Mr. P. D. Milano Mr. R. L. Prevatte U

4 a