Forwards Insp Repts 50-445/92-60 & 50-446/92-60 on 921206-930130 & Notice of Violations
ML20034H185
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/11/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20034H186 List:
References
NUDOCS 9303160143
Download: ML20034H185 (7)


See also: IR 05000445/1992060

Text

UNITED STATES

pm Rf cv

gi

,%

NUCLEAR REGULATORY COMMISSION

j

REGloN IV

l

$

[

8

611 RYAN PLAZA DRIVE, SUITE 400

%

[

AR LINGToN. TE XAS 76011-8064

g

9 ***

VAR 1 1 1993

Dockets:

50-445

50-446

License:

NPF-87

Construction Permit:

CPPR-127

TU Electric

ATTN:

W. J. Cahill, Jr., Group Vice President

Nuclear Engineering and Operations,

Comanche Peak Steam Electric Station

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas

75201

SUBJECT:

NRC INSPECTION REPORT 50-445/92-60; S0-446/92-60 (NOTICE OF

VIOLATION)

This refers to the inspection conducted by Mr. D. N. Graves, and the

inspectors identified in the enclosed report, of this office on December 6,

1992, through January 30 1993.

The inspection included a review of

activities authorized for the Comanche Peak Steam Electric Station, Units 1

and 2, facility.

At the conclusion of the inspection, the findings were

discussed with you and those members of your staff identified in the enclosed

report.

Areas examined during the inspection are identified in the report.

Within

these areas the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Based on the results of this inspection, certain licensed activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

These violations are of concern because, collectively,

they indicate failures to effectively control system status, implement

corrective actions, and maintain the procedures that control the status and

operation of plant systems.

The lack of adequate system status control and

the use of inaccurate abnormal operating procedures could result in improper

or delayed operator actions.

It was also identified that a pipe support in the component cooling water

system was not grouted as required, and this was in violation of Criterion V

of Appendix B to 10 CFR Part 50. This violation is not being cited because

the criteria in paragraph VII.B.) of Appendix C to 10 CFR Part 2 of the NRC's

Rul es of Practice," were satisfied.

This violation was an isolated

occurrence and your staff took prompt and effective actions to correct the

condition.

i

9303160143 930311

PDR

ADOCK 05000445

O

PDR

TV Electric

-2-

It is our understanding, as discussed by Mr. J. Donahue, Manager, Operations,

in the exit meeting conducted on January 29, 1993, that the plant staff would

perform valve lineup verifications on all Unit 2 safety-related systems prior

to entering Mode S and field verifications of all Unit 2 and common abnormal

operating procedures prior to entering specified operating modes.

If your

understanding of these commitments differs from ours, please contact me

immediately.

In general, the transition of Unit 2 programs from the construction and

preoperational phase to operations was well controlled.

The preparation and

content of the open item closure packages provided to the NRC staff

significantly enhanced our ability to review and resolve issues in a timely

manner.

You are required to respond to this letter and should follow the instructions

specified in the onclosed Notice when preparing your response,

in your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence.

After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy

of this letter and its enclosures will be placed in the NRC's Public Document

Room.

The responses directed by this letter and the enclosed Noti e are not subject

to the clearance procedures of the Office of Management and Budget, as

required b.y the Paperwor k Reduction Act of 1980, Pub. L. No. 96.511.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

'

/

O

i

l~

l

)

A.BillBeach,D/rectdr

l

i

Division of Reactor Projects

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

"'

50-445/92-60; 50-446/92-60 w/ attachments

I

,TU Electric

-3-

cc w/ enclosures:

TV Electric

ATTN:

Roger D. Walker, Manager of

Regulatory Affairs for Nuclear

Engineering Organization

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

GDS Associates, Inc.

Suite 720

1850 Parkway Place

Marietta, Georgia 30067-8237

TU Electric

Bethesda Licensing

3 Metro Center, Suite 610

Bethesda, Maryland 20814

Jorden, Schulte, and Burchette

AlTN: William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

1025 Thomas Jefferson St., N.W.

Washington, D.C.

20007

Newman & Holtzinger, P.C.

ATTN: Jack R. Newman, Esq.

1615 L. Street, N.W.

Suite 1000

Washington, D.C.

20036

Texas Department of Licensing & Regulation

ATTH:

G. R. Bynog, Program Manager /

Chief Inspector

Boiler Division

P.O. Box 12157, Capitol Station

Austin, Texas 78711

Honorable Dale McPherson

County Judge

P.O. Box 851

Glen Rose, Texas 76043

>

,TU Electric

-4-

Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas 78756

>

Owen L. Thero, President

Quality Technology Company

P.O. Box 408

201 West 3rd

Lebo, Kansas 66856-0408

_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.TU Electric

-S-

bcc to DMB (IE01)

bcc distrib. by RIV:

J. L. Milhoan

Resident Inspector (2)

DRP

Section Chief (DRP/B)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/B)

Section Chief (DRP/~SS)

DRS

A. Bill Beach. D/ORP

_

RIV: SRI:DRP/B

RI:DRP/B

SRI:DRP/B

RI:DRP/B

INTERN:DRP/B

PE:DBWP,,

,

_

TReis /

DNGraves:ww

RMLattaf

WBJones,

GWerner

VGaddy

3/6/93b,

3/ f/9h[ 3/f/9h;/ 3/ f/93bjf 3/5'793 b

3/6/h

/

C:DRP/B

I,:f pP/C

  • QI Q8[hJ
  • SRI:DRP
  • RI:DRP
  • C:DRP/A

LAYandeM

h@hhiva

bhlardo

GPick

LMyers

WDJohnson

3/ 5'/9h/

3/ 6/93

3hi/93

3/ /93

3/ /93

3/ /93

_

  • SRI:DRS/ES
  • RI:DRS/ES
  • RI:DRS/ES
  • DRS/ES
  • RI:DRS/ES
  • C:DRS/ES

CPaulk

MRunyan

WMcNeill

RVickrey

PGoldberg

TWesterman

3/ /93

3/ /93

3/ /93

3/

/93

3/ /93

_3/

,23

+RI:DRS/PS

  • C:DRS/PS
  • RE:DRS:0S
  • C:DRS:05
  • AC

/_ /

OI/DD /m )

RWise d , DMurphyd$

ASingh

LConstable

RLantz

JPellet

3/f1/b3

3/ g/93 b

3/ /93

3/ /93

3/ /93

3/ /93

e't

D:DRPrG[

NRR/ADAfd.,

DD:DRP

RBrady pl[h tTPGwynnh

ABBeach

0

,3/6/93

3/ll/93

3/ll/93

  • previously concurred

_

_

.

.

..

i

!

MAR I i 1993

!

TU Electric

-S-

'

5

!

!

!

bcc:tolDMBf(IE01)

i

!

bcc distrib. by RIV:

1

J. L. Milhoan

Resident Inspector (2)

.

DRP

Section Chief (DRP/B)

[

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

~

DRSS-FIPS

RIV File

Project Engineer (DRP/B)

Section Chief (DRP/TSS)

l

DRS

A. Bill Beach, D/DRP-

t

!

i

!

l

RIV: SRI:DRP/B

RI:DRP/B

SRI:DRP/B

RI:DRP/B

INTERN:DRP/B

PE:DPffp;,

.

i.

DNGraves:ww

RMLatta/

WBJones,

GWerner:

VGaddy

TReis /

,

b[ 3/6/dh9'[

3/6/93b_h 3/f/9IV 3/ f/93 )/ 3/T/93bjf. 3/5'793

b

/

C:DRP/B

  • hl;fhP/C
  • dQRJhf
  • SRI:DRPd *RI:DRP
  • C:DRP/A

LAYande/l

k@fhhiva bhkardo

GPick.

LMyers

-WDJohnson

j

3/5/9h

3/ 6/93

3hi/93

3/ -/93

'3/ /93-

3/ ' 93

/

  • SRI:DRS/ES
  • RI:DRS/ES
  • RI:DRS/ES
  • DRS/ES
  • RI:DRS/ES-.
  • C:DRS/ES

CPaul k.

MRunyan

WMcNeill

RVickrey-

PGoldberg

TWesterman

3/ /93

3/ /93

3/ /93

3/ /93

3/ -/93-

'3/ /93

  • RI:DRS/PS
  • C:DRS/PS
  • RE:DRS:05
  • C:DRS:0S
  • AC

/ _. /

01/D0

k,)

w

g i

ASingh

LConstable

RLantz

JPellet

RWise_(zd;., DMurphy n,;p

n

3/ /93

3/ /93

3/ /93'

3/ /93

3/4/93

3/g/93 4b mi

-t

D:DRPrQ[

NRR/ADAP/m

DD:DRP

RBrady%l[be tTPGwynn

ABBeach[t)

0

l

3/8/93

3/ll/93

3/ll/93

I