ML20034G417
| ML20034G417 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/26/1993 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Broughton T GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20034G418 | List: |
| References | |
| NUDOCS 9303090485 | |
| Download: ML20034G417 (2) | |
See also: IR 05000289/1993002
Text
'
T;cS
.
.
.
FEB 2 61993
Docket No. 50-289
'
Mr. T. Gary Broughton
Vice President and Director, TMI-1
GPU Nuclear Corporation
Three Mile Island Nuclear Station
P. O. Box 480
Middletown, Pennsylvania 17057-0191
Dear Mr. Broughton:
SUBJECT:
REQUALIFICATION PROGRAM EVALUATION REPORT NO. 50-289/
\\
'
93-02 (OL-RQ)
From February 1 - 5, 1993, the NRC administered requalification examinations to employees
of your company who operate the Three Mile Island, Unit 1 facility. These examinations
addressed areas important to public health and safety and were conducted in accordance with
Revision 7 to NUREG-1021, Operator Licensing Examiner Standards, ES-601,
" Administration of NRC Requalification Program Evaluations." The evaluation had two
purposes, evaluating the effectiveness of the licensed operator requalification training
'
program at mainmining the competency of licensed operators, and examining the individual
operators to determine if they would satisfy the regulatory requirement of passing an NRC
administered examination prior to license renewal. Both purposes were met successfully. At
the conclusion of the examination, the results and findings of the examination were discussed
with Mr. Ross, Mr. Shalikashvili, and other members of your staff.
As evaluated by the NRC, all fifteen operators passed all portions of the examination and all
three crews, made up of these fifteen operators, passed the simulator portion of the
examination. The evaluation was conducted in accordance with the criteria established in
'
NUREG-1021, as cited above. As a result of this evaluation, your requalification program
has been assigned an overall program rating of satisfactory.
1
3
'
l
i
OFFICIAL RECORD COPY
G:TMIRQ93
h
I
~
9303090485 930226
h'#
1
{DR
ADOCK 05000289
__
,
,
,
I
FEB 2 01933
'
I
Mr. T. Gary Broughton
2
r
1
1
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and
the enclosure will be placed in the NRC Public Document Room.
Should you have any questions regarding this examination, please contact me at
215-337-5291.
'
Sincerely,
Original Signed By:
Lt.e il Deilenhauwn
Ixe H. Bettenhausen, Chief
Operations Branch
Division of Reactor Safety
Enclosure: Requalification Program Evaluation
Report No. 50-289/93-02 (OL-RQ)
w/ Attachments 1 and 2
l
Attachments:
l
1. General Public Utilities letter from to Dr. L. Bettenhausen
dated February 19, 1993
2. Simulator Facility Report
cc w/ encl.; w/o Attachments 1 and 2:
R. E. Rogan, Licensing and Nuclear Safety Director
M. J. Ross, Operations and Maintenance Director, TMI-l
,
J. Fornicola, Licensing and Regulatory Affairs Director
TMI-1 Licensing Department
E. L. Blake, Jr., Esquire
TMI-Alert (TMIA)
NRC Resident Inspector
Commonwealth of Pennsylvania
cc w/ encl. and Attachments 1 and 2:
Mark Trump, Operations Training Manager
'
O. J. Shalikashvili, Manager - Plant Training
l
Public Document Room (PDR)
Ixcal Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
OFFICIAL RECORD COPY
G:TMIRQ93
.
- -