Partially Withheld Insp Rept 50-458/93-02 on 930119-22 (Ref 10CFR50.54(p)).Violation Noted.Areas Inspected:Security Plans & Implementing Procedures,Access Control,Personnel, Testing & Maint,Lighting & Physical Barriers
ML20034F614
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/26/1993
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20034F607 List:
References
50-458-93-02, 50-458-93-2, NUDOCS 9303040052
Download: ML20034F614 (3)


See also: IR 05000458/1993002

Text

.

.

.

.

-

,.

..

,

DOCUNENT CONTAINS

SAFEGUARDS-INFORMATION-

APPENDIX B

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Inspection Report:

50-458/93-02

Operating License:

NPF-47

Licensee:

Gulf States Utilities

i

Senior Vice President

i

P.O. Box 220

i

St. Francisville, Louisiana 70775

!

Facility Name:

River Bend Station

Inspection At:

St. Francisville, Louisiana-

'

Inspection Conducted:

January 19-22, 1993

[

Inspector:

A. B. Earnest, Physical Security-Specialist

1

Facilities Inspection Programs Section

Approved:

/

M58/

I!k[

Blaine Murray, Chief, h11ities Inspection

Date

Programs Section

,

!

Inspection Summary

Areas Inspected:

Routine, announced inspection of security plans and .

.!

1mplementing procedures, access control - personnel, testing and maintenance,

lighting, physical barriers - protected area safeguards contingency plan

'

implementation review, security organization, and protection of safeguards

information.

'

Results:

A noncited violation was identified involving the failure to submit a

)

10 CFR 50.54(p) report within the 2-month time frame required

'

(Section1.1).

,

1

DOCUENT CONTAINS

ENCLOSURE CONTAINS

'

SAFEGUARDS INFORMATION

SAFEGUARDS.INFORMATION

UPON SEPARATION THIS'

9303040052 930226'

.PAGE'IS DECONTROLLED

1

PDR

ADDCK'05000458

1

G

'

PDR

l

.

.

~

.

.

-2-

DOCUNENT CONTAINS

SAFEGUARDS INFORMATION

An unresolved item was identified regarding the adequacy of compensatory

measures designed to meet the requirements of 10 CFR 73.55(g)(1) and the

Physical Security Plan (Section 1.1).

The personnel access control equipment was adequate to ensure that

personnel entering the plant were adequately searched.

The inspector

expressed a concern that security officers manning the access lanes were

distracted and did not require the inspector to pause in the metal

detectors (Section 2.1).

The test and maintenance program was effective in ensuring the continued

operability of the security systems (Section 3.1).

A good lighting system was in place that allowed assessment of the

protected area (Section 4.1).

A good protected area barrier system had been established (Section 5.1).

A violation was identified for the failure to follow a procedure during

quality assurance contingency drills (Section 6.1).

Security management was slow in implementing enhanced oversight to

identify problems in the security organization (Section 7.2).

A violation was identified involving the failure to protect safeguards

information (Section 8.1) .

Summary of Insoection Findinos:

A noncited violation was identified (Section 1.1).

Unresolved Item 458/9302-01 was identified (Section 1.1).

Violation 458/9302-02 was identified (Section 6.1).

Violation 458/9302-03 was identified (Section 8.1).

Attachment

Attachment - Persons Contacted and Exit Meeting.

DOCUMENT CONTAINS

ENCLOSURE CONTAINS

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION

UPON SEPARATION THIS

PAGE IS DECONTROLLED

. _ -

=-

---

-

.

'

'

'

.

,6;.

. a

>

.

Gulf States Utilities'

-4-

DOCUMENT CONTAINS-

T

SAFEGUARDS:INFORMATION~

- bec copy of entire report:

RIV . Security. File-=

Elaine Koup, RSGB/NRR (MS-9 D24)

J. L. Milhoan, RA

RBS Resident Inspector

Security File

G. F. Sanborn, EO-

M. Virgilo, NRR. (MS 13 E4)

_bcc copy of letter, NOV, and inspection summary only:

1DMBiIE-04' "

-

'

DRS

DRP

Lisa Shea, RM/ALF (MS 4503)'

MIS

RIV File

Section Chief, DRP/C

RIV Files

Project Engineer, DRP/C

E. Baker, NRR Project Manager (MS 13 H15)

!

.

' ,

f

RIV:FIPSF h-

C:FIPS

kW

_DD:DRSSdY

A0

h,)

h:bRP

1

ABEarnest:nh

BMurray

t'E!DChamberlain 'RWis[

$1BBeach

'

h/([/93

k/@/93'

2 /2493

.$/4/93

312f/93

)

D:DRSSk

LJCallanf-

)

1

4 /J6/93

'

'

DOCLNENT CONTAINS

ENCLOSURE CONTAINS

' SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION

-

UPON SEPARATION.THIS--

PAGE IS DECONTROLLED

i

.

u

'

U

.

-

-