Forwards Safety Insp Repts 50-334/90-11 & 50-412/90-10 on 900430-0504.No Violations Noted.Weaknesses Noted in Lab Qa/ QC Program.Complete Data from Independent Measures Taken Will Be Reported in Subsequent Insp Rept
ML20034D006
Person / Time
Site: Beaver Valley
Issue date: 05/25/1990
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
Shared Package
ML20034D007 List:
References
NUDOCS 9006050354
Download: ML20034D006 (3)


See also: IR 05000334/1990011

Text

.y

,

..

MAY 2 51990

Docket Nos. 50-334

50-412

Duquesne Light Company

ATTN: Mr. J. D. Sieber

Vice President

Nuclear Group

Post Office Box 4

Shippingport, Pennsylvania 15077

Gentlemen:

Subject:

Combined Inspection Report Nos. 50-334/90-11 and 50-412/90-10

This refers to the routine safety inspection conducted by J. J. Kottan of this

office on April 30 - May 4, 1990 of activities authorized by NRC License Nos.

DPR-66 and NPF-73 at the Beaver Valley Power Station, Units 1 and 2,

Shippingport, Pennsylvania and to the discussions of our findings held by J.

Kottan with Mr. T. Noonan and other members of your staff at the conclusion of

the inspection.

Areas examined during.this inspection are described in the NRC Region I Inspection-

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

-

interviews with personnel, and observations by the inspector.

In-addition, our Mobile Radiological Measurements Laboratory was also brought

to your site and used by the inspector to make certain independent measurements.

The basic purpose of these independent measurements is to verify your capability

for analyzing radioactive effluents, and to achieve and maintain comparable

methods of analyses between your facility and the-NRC.

The complete data from,

,

these measurements will be reported in a subsequent inspection report.

Within the scope of this inspection, no violations were observed.

However,

weaknesses were identified in your laboratory QA/QC program in that portions of

the program are.poorly documented and appear to be implemented in random manner.

t

l

l

OFFICIAL RECORD COPY

CIR BV 90-11/10 - 0001.0.0

05/25/90

1{

'

9006050354 900525

f

PDR -ADOCK 05000334

~CC

O

PDC

-,

.

6

7

'

-

.

,

W25W

'

Duquesne Light Company

2

.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

'

Sincerely,

Ori inal Signed Dy:

3

Ronald R. Bellamy

Ronald R. Bellamy, Chief

.

.

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure:

Combined NRC Region I Inspection Report Numbers 50-334/90-11 and 50-412/90-10

cc w/ enc 1:

,

J. J. Carey, Executive Vice President, Operations

J. O. Crockett, General Manager, Corporate Nuclear Services

W. S. Lacey, General Manager, Nuclear Operations

N. R. Tonet, Manager, Nuclear Engineering

T. P. Noonan, General Manager, Nuclear Operations

S. C. Fenner, QA Manager

K. D. Grada, Manager, Nuclear Safety

H. R. Caldwell, General Superintendent, Nuclear Operations

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

i

l

l

i

0FFICIAL RECORD COPY

CIR BV 90-11/10 - 0002.0.0

l

05/15/90

'

F.

-

.

.,

.

Duquesne Light Company-

3

y4y ,

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)-

R. Bellamy, DRSS

C. Cowgill, DRP

M. Conner, SALP Reports Only

K. Abraham, PA0 (20) SALP Report and (2) All Inspection Reports

J. Caldwell, NRR

P. Tam, NRR

.

J. Strosnider, DRS

j

l

l

l

l

s

i

(Chbi'

,ou

RI: h

RIhISS

Rj.0RSS

1.DRSS

RI:DRSS

McNFara/mk/slj

Furia

Kottan

Bores

Bellamy

05////90

05/k/90

05/f//90

OE/JY/90

05LN90

0FFICIAL RECORD COPY

CIR BV 90-11/10 - 0003.0.0