Forwards Safety Insp Rept 50-245/90-05 on 900221-0402. Violations Noted.Nrc Concerned Re Lack of Timely Appreciation of & Response to Significant Condition Adverse to Quality by Unit Mgt
ML20034C888
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/11/1990
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20034C889 List:
References
EA-90-084, EA-90-84, NUDOCS 9005210056
Download: ML20034C888 (4)


See also: IR 05000245/1990005

Text

. _

m,-

-

f

'I

- .

,

')%

..

MAY 111990

i

Docket No. 50-245

EA No.90-084

Northeast Nuclear Energy Company

ATTH:' Mr. E. J. Mroczka

Senior Vice President - Nuclear

~ Engineering and Operations

P.O. Box 270

!

Hartford, Connecticut

06141-0270

Gentlemen:

Subject: NRC Region I Inspection No. 50-245/90-05

This refers to the routine safety inspection conducte'd by Mr. D. Dempsey of.

this office on February 21 - April 2,1990 at Millstone Nuclear Power Station,:

.

Unit 1, Waterford, Connecticut of activities authorized by NRC License No.

' DPR-21, and to the discussions of our findings by Mr. Dempsey with Mr. J. -Stetz -

p

at the conclusion of the inspection.

0uring the inspection period,=our review indicated that since' December, 1976,.a

non-conservative main steam-line high flow setpoint had existed at-Unit 1,

t

which would have resulted in Group I main steam line isolation at.a steam flow

t

in excess of that required by technical specifications. Additionally, since at

least 1978, the emergency gas turbine generator had not been tested at' full;

load output.as' required by technical specifications.

In both' cases,. power

operation continued during these periods.in which applicable technical

i

specification limiting conditions for operation were not met'.

Both cases-

represent apparent violationr of the Commission's' regulations as detailed in-

-

the enclosed report.

,

1

In the case of the main steam line flow switches, we ~are c'oncerned .regarding

- '

the lack of timely appreciation of and response to a significant-condition-

adverse to quality by unit management,

,

q

Regarding the gas turbine-generator event, we are' concerned that the procedure

review and approval mechanisms extant at Millstone.1 apparently were insufficient

to identify the inadequacy leading to this event.

The apparent violations identified in our review of these events are discussed:

in the enclosed inspection report. The need for, and nature of, appropriate

enforcement action concerning the apparent violations will be the subject of

separate correspondence at a later time.

These matters will be discussed in

an enforcement conference with you and' members of your staff scheduled .for

j

May 24, 1990 in the Region I office, King of Prussia, Pennsylvania. You

1

1

9

0FFICIAL RECORD COPY

IR MILLI 90-05 - 0001.0.0

/

I j

9005210036 900511

"

i

PDR

ADOCK 05000245

O

PDC

..

.

..

. . . .,

4

l

.

. ..

- Northeast Nuclear Energy Company

2

_

,

should'come to the meeting prepared to discuss your. understanding of these. events,

the reasons why they occurred, and your~ planned and' completed corrective actions.

Your cooperation with us is appreciated.

Sincerely,

ORIGINAL SIGNED BY;

JAMES T. WIGGINS -

,

,,

William.F. Kane,-Director

Division of Reactor Projects

Enclosure:- NRC Region I Inspection Report No. 50-245/90-05

cc w/ enc 1:

W. D. Romberg, Vice President, Nuclear Operations

.

R. M. Kacich, Manager, Generation Facilities Licensing.

D. O. Nordquist, Director'of Quality Services

S. E.-Scace, Nuclear Station Director,' Millstone Station

J. P; Stetz, Nuclear Unit. Director, Millstone Unit 1

. Gerald Garfield, Esquire

Public Document Room (PDR)

~-

local Public' Document. Room (LPDR)

'

. Nuclear Safety Information Center.(NSIC)

a

NRC Senior Resident Inspector-

'

State of Connecticut

t

.

,

4

1

4

)

0FFICIAL RECORD COPY

IR MILL 1 90-05 - 0002.0.0

04/26/90

!

.

+

.

'

.

_ . , ,

s

>

.

. . . .

Northeast Nuclear Energy Company.

3

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA-(w/o enclosures)

DRP Section Chief

J. Shediosky, SRI, Haddam Neck ~

t

W. Raymond, SRI, Millstone

M. Boyle, PM, NRR/PDI-4

,

~ J. Partlow, NRR/ADPR

'J.-Goldberg, OGC

J. Lieberman, OE

.

D.'Holody, OE:RI

bec w/ Executive Summary only:

'

J. Wiggins, DRP

4

W.-Hodges,' DRS;

W. Johnston, DRS

J. Durr, DRS

R. Gallo, DRS.

M. Knapp, DRSS

o

R. Cooper, DRSS

R. Bellamy, DRSS

~J. Stolz, NRR/PDI-4

I

L

'

t

1

RI:DRS

RI:DRS

RI:DRS

RI:DRS'

,JI:DRS

'*Dempsey/mlb

' *Raymond

  • Haverkamp
  • Wenzinger

r~Kane

t

05/- /90

05/ /90

05/ /90

05/ /90

05/ II/90

  • SEE PREVIOUS CONCURRENCES

OFFICIAL RECORD COPY

IR MILL 1 90-05 - 0003.0.0

04/26/90

,

i

,

..

-

-

...

'.

"

Northeast Nuclear Energy Company

3

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant. CRMA (w/o enclosures)

OkP Section Chief

J. 5.Nediosky, SR3, Hadd rA Neck

W. Raymono, SRI, M11194ne

M. Boyle PM, t'RR/PD1-4

J. Partlow,14RR/ADPR

J. Goldberg, LEC

J. Lieberman, OE

D. Holody, OE:RI

bec w/ Executive Summary only:

J. Wiggins, ORP

W. Hodges, DRS

W. Johnston, DRS

J. Durr, DRS

R. Gallo, DRS

M. Knapp, DRSS

R. Cooper, DRSS

R. Bellamy, DRSS

J. Stolz, NRR/PDl-4

,

y/]figer

blind 2 2

RI:DRS

p RI:DRS

RI:DRS

S

RI:DRS

Dempsey/m1 F

Ray o d

H

amp

t

Kane

0$$7/90

/ 7 /90

05/7 /90

05/Q/90

05/ /90

0FFICIAL RECORD COPY

IR MILL 1 90-05 - 0003.0.0

04/26/90

.