Issue 56 to Abnormal Operating Procedure AOP-N, Loss of Instrument Bus
ML20034C783
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/19/1990
From:
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20034C092 List:
References
AOP-N, NUDOCS 9005100049
Download: ML20034C783 (8)


Text

. _ _

l.

AOP-N 1ssue 56

-T' d

~#

Pub llC FORT ST. VRAIN NUCLEAR CENERATIN3 STATION Page 1 of 2

$9fVlCO'

' PUsuc sanwcs consPAmy or colorado TITLE:

LOSS OF AN INSTRUMENT BUS

-l i

4 RESPONSIBLE fl k f NDuljW FOR= r n-h AUTHO Q l

BY d u. (J u EEiEw PORC 8 7 7 APR 111990 ll.,E,CTIVE DCCF NUMBER (S) hD-Q1h 6 i

IO

'l I

FT. ST. VRAIN j

NON-CONTROLLED COPY VERIFY ISSUE STATUS J

WITH SITE DOCUMENT

)

CONTROL CENTER PRIOR TO USE ~

4 Ni 9005100049 900427 PDR ADOCK 05000267 V

P PDR FORM tDl372 22 3M2

..~......%--,,.-

.m

<wc

.--y

-,,. - - - ~ - -

1

AOP-N I

.lssue 56 Page 2 of 2 (N)

LOSS OF AN INSTRUMENT BUS SYMPTOM-ACTION MATRin l

I 4

p 1

i SYMPTOMS I

8 j

8 l

I 1.1 1

1.2 8

1.3 I

I I

18nstrument Bus **nstrument Bus linstrument Bus t t

t ACTIONS IUndervoltage IUnde rvol tage IUndervoltage f

l I

I INon-interrupt. I Non-Inte r rtept. I lnterrteptable I l

8 I

Bus i l'

Bus 2 I

Bus 3 f

l I

l-06G, 2-1 1

3-06G, 2-1.

I I-06G, 2-1 I

t I

8 (El-92217) 8 (El-92218)

I (08-92219)

I 1

I i

f f

I l

l i

I I

i 8

i OPERATOR ACTIONS I

l I-

't i

i 2.1 ^~

E I

5 8

1 Termenate Derueling I XX i XX 1 XX i

l t activities.

1 I

I I

l f

8 I

i i

i 2.2 I

I I

I I Dispatch Operator to I

XX i XX 8 XX l I restore power to failed I

i i

I bus i

I I

I i

I I

I I

I 2.3 I

I I

I I Refer to TABLE N.4, 1

I

-l I

1 " Effects of Loss or I XX XX i XX XX 1 XX XX 1 I instrument Bus" for i

8 8

I I effects or loss of a 1

i i

i i particular but i

1 I

I i

i i

I I

+

~

l AOP APP N Issue 56 Public FORT ST. VRAIN NUCLEAR GENERATING STATION service

INTRODUCTION Four separate 120 Volt AC Instrument Buses supply power for the Plant Protective System (PPS) and various control systems.

Non-Interruptible Buses 1 and 2 are energized from the 125 Volt DC buses via power inverters (DC-AC). Loss of the DC bus or failure of the inverter will cause an automatic no-break switch to transfer to a dedicated instrument power transformer for backup power. The transformers are energized from 480 Volt Bus 1 for Instrument Bus 1 and 480 Volt Bus 3 for Instrument Bus 2.

Non-Interruptible Bus 3 is supplied from a dedicated set of batteries via a power inverter.

These batteries are kept charged by. a battery charger fed from 480 Volt Bus 2.

Failure of the inverter or loss of DC power will cause an automatic no-break switch to a dedicated instrument power transformer fed from 480 Volt Bus 1.

Interruptible Bus 3 is fed normally from 480 Volt Bus 3.

Failure of this source will cause an automatic switch to another transformer from 480 Volt Bus 1.

DISCUSSION OF SYMPTOMS SYMPTOMS I

1.1 Instrument Bus Undervoltage Non-Interrupt. Bus 1.

I-06G 2-1 (El 92217)

O-1.2 Instrument Bus Undervoltage Non-Interrupt. Bus 2.

1-06G, 2-1 (El 92218) l 1.3 Instrument Bus Undervoltage Interrupt. Bus 3, I-06G, 2-1 (El 92219)

These alarms indicate that an undervoltage condition exists at any one of the four A.C. instrument busses. A visual check of the four voltmeters located on I-06 will provide immediate identification of the effected bus.

DISCUSSION OF OPERATOR ACTION OPERATOR ACTION l

l 2.1 Terminate Defueling Activities.

I If power supply to non-interrupt. Bus 1 or Bus 2 is lost, l

a single channel scram will lock in due to hinderance i

logic of startup channels 1 and 2.

Loss of Interrupf..

l Bus 3 will result in loss of ability to move control rods.

O FOHMion372 22 3643

AO' APP N j

P

.l',

Issue 56--

0" A Public.

FORT ST. VRAIN NUCLEAR GENERATING STATION W Service

  • pusuc sanwes couramy or cotonAno j.

2.2 Dispatch operator to restore power to failed bus.

NON-INTERRUPTIBLE BUS 1 8

If power has been lost. to the non-interrt.ptible bus, the static transfer to the dedicated backup transformer has

. failed. The operator.should verify operability of the transformr. and switch the manual bypass switch to the alternate power source. Refer.to SOP 92-05 for transferring instructions.

- 1 NON-INTERRUPTIBLE BUS 2 If powtr has been lost to the non-interruptible bus, the static transfer to the dedicated backup transformer has failed. -The operator should verify operability of the transformer and switch the manual bypass switch to the alternate power source. Refer to S0P 92-05 for transferring instructions.

l INTERRUPTIBLE BUS 3

. I

. 1.

If normal power supply to Interruptible Bus 3 has been lost, an automatic transfer.to a backup power-supply.should take place. Dispatch an Operator to confirm this action locally.

2.

If the transfer does not take place-~ automatically due to any reason, the Operator will need to perform a manual. transfer by depressing the TEST pushbutton and moving the " RETURN SELECT" to " MAN".

Also, while maintaining the TEST' pushbutton

, l depressed, move the manual bypass switch to the j

"BYP-PREF" position. The TEST switch may. cow be i

released.

J 1

l 0

J Y

FCOM(D)372 22 3043 s

v

-m I

-w,

(

.l l

AOP APP N-1 Issue 56 Page 3 of 6 A Public FORT ST. VRAIN NUCLEAR GENERATING STATION

'.1 1 -

%F Servico*

Pusuc senvece couramy or cotonaoo l

2,3-Refer to table N.4 " Effects of 1.oss of Instrument Bus" for

,eyectsoflossofapart_icularbus.

The effects of a loss c.f particular instrument bus on critical plant equipment is listed.in Table N.4.

I

.i-h k

l-T I

t j

t l

P f

e I

' FORM (0)J12 22 + 3643 Y

- +.

.i

{-

AOP-N' Issue 56 Public FORT ST. VRAIN NUCLEAR GENERATING STATION SerVICO' PUBUC SERVICE COMPANY OF COLORADO,

.O TABLE N.4 EFFECTS OF LOSS OF INSTRUMENT BUS B

1 tFFECT OF I

EFFECT OF l

EFFECT OF l

EFFECT OF l

LOSS OF NON.1 LOSS OF NON-l LOSS OF l

LOSS OF NON-

-FUNCTION 1 INTERRUPTIBLE l INTERRUPTIBLE l INTERRUPTIBLE I INTERRUPTIBLE l

INSTRUMENT l INSTRUMENT l INSTRUMENT i

-7NSTRUMENT l

BUS 1 l

BUS 2-l BUS 3 l

BUS 3 I

l l

I CIRCUL-l LOOP 1 l

LOOP 2 i LOOP 1 & LOOP 21 NO EFFECT<

ATOR IBuffer He suplyl Buffer He Suplyl NO EFFECT l

AUXIL-Ifail open, buf-ifail open, buf-l l

IARIES Ifer He return Ifer He return-l l

lFC, thus cire. IFC, thus cire. I l

ltrips on high Itrips on high I l

l buffer /mid-lbuffer/mid-l l

lbuffer delta P.lbuffer delta P.l l

l 1

l I

l.

LOOP 2, I

LOOP 1, l

l g

i NO EFFECT l

NO EFFECT l l

W l

l 1

I l Bearing water l Bearing water l

i isupply & returntsupply & return l Flow control l Flow control lvalve on brng Ivalve on brng l l

l water F0, drain l water F0, drain l-l-

l controls all icontrols all l

l

] pneumatic, no [ pneumatic,no I l

Ifailure.

Ifailure.

l l

1 l

l l

L I

I I

I CIRCUL-l LOOP 1 l

LOOP 2 l

NO EFFECT

'l_-

-NO EFFECT i

ATOR l Controls FAI l Controls FAI l

l 4

SPEED lshutdown by bufl shutdown by bufl

.l CONTROL lfer as above.

lfer as above.

l l

1 I

i l

l l

LOOP 2 l

LOOP 1 l

l lNo effect on.

lNo effect on l

l Iwater turbine l water turbine i I

i l drives.

l drives.

l l

___I i

l 1

I I

NOTE: Abbreviations - FC = Fail Closed

~ ~ ~

F0 = Fail Open-FA = Fail "as is"

{

SD = Shutdown f

5:L coim75~3su g

Id snuntasser _ -

wew-

W lL AOP'-N

~

Issue 56?

'i age 5 of E,

Public FORT ST 'VRAIN NUCLEAR GENERATING STATION SerVICO'

'Pusuc 'ssavecs comPAmy.or'coLonApo-p

.(

i TABLE N.4 j

EFFECTS OF LOSS OF INSTRUMENT BUS

'l

)

~

l EFFECT OF l=

EFFECT OF l

EFFECT OF

-l EFFECT OF l

LOSS OF NON--l -LOSS OF NON-I

. LOSS OF.

l LOSS OF.NON.

1 FUNCTION-l INTERRUPTIBLE 1 INTERRUPTIBLE.1 INTERRUPTIBLE-1 INTERRUPTIBLE C

I INSTRUMENT 1:

INSTRUMENT ~l INSTRUMENT ~

l INSTRUMENT I

BUS I I

. BUS 2 l

BUS 3 1

BUS 3 l

I I

.I i

l- -

I l-I

.PPS ILose trip capa-flose trip capa-l-N0'EFFECT-l Single channel SYSTEM lbility from 'A'Ibility from 'B'l

_l trips.and sin-11ogic. Single l logic. Single-l Jgle channel Ichannel scram. l channel scram l lscram.

I I

l l

I I

l l

l CIRCUL-l Loss of cire.

l Loss of cire.

lResults in 1 ATOR TRIPltrip & Loop SD.l trip &-Loop SD l l single channel-l & LOOP jfrom "A" Logic lfrom "B" Logic l l trips, l SD CAPA-l capability Icapability I

{-

O' l BILITIES l l

l l

I i

1 l

1 l

lShould not re-lShould not re-l l

f isult in trip orlsult in trip orl-1 lloss of trip l loss of trip l1

-l leapability.

Icapability.

l_

l I

I i

_l 1

l l

l l

CONTROL l Lose digital l Lose analog posilose capability l NO EFFECT ROD l position indic-lition indicate lof moving CRD's l L

DRIVES lation.

l lwith hand

[

]

l l

lswitches or fluxl l

l l

l controller.

l l

I I

I I

'n l-l l

l AUX.

l Lose PCV 5201 ILose all boiler l NO EFFECT l

a BOILER l control (FO) l controls.

l l

i.

l(Can control l

l l

l manually).

l l

l l

l 1

l'

'l 1.

}

l

(

NOTE: Abbreviations - FC = Fail Closed F0 = Fail Open FA = c ll "as is" a

[L-SD = Shutdown 1

l FORM (D)372 22 3643

^'

o-1:

AOP-N Issue 56 1

Public' FORT ST. VRAIN NUCLEAR GENERATING STATION "9' SerVIC9'

- PUBUC SERVICE COMPANY OF COLORADO TABLE N.4 i+'~

. EFFECTS OF LOSS OF INSTRUMENT BUS j

l EFFECT OF l

.EFFECT OF l, EFFECT OF l

EFFECT OF1 l

LOSS-0F NON-l LOSS OF NON-l LOSS OF l

LOSS'0F NON-FUNCTION l INTERRUPTIBLE 1: INTERRUPTIBLE l.INTERRUPTIBLE l INTERRUPTIBLE I

INSTRUMENT l INSTRUMENT l INSTRUMENT l

INSTRUMENT l

BUS 1 l

BUS 2 l

BUS 3 i

BUS 3 I

l l~

l l

I l

l 1

i ALARMS.lAll switched IA11 sw Mched

.lA11 switched-l NO EFFECT lalarms function l alarms function l alarms function l lnormally. All lnormally. All-Inormally. All l

l tcularms: fed laccularms fed Iaccularms fed l

1 Irrom Bus 1 faillfrom Bus 2 faillfrom Bus 3 fail l 1(no alarm).

l(noalarm).

l(no alarm).

l l

_1 I

I l

I I

I

.i REACTOR l Lose Fan 11

' Lose Fan 1B, IC]

NO EFFECTS l

NO EFFECT

BLOG, l controls.

.:ontrols.

l l

G EXHAUST l l

l l

FANS l

l l

l I

I I

l I

I I

I COMMUNI-l Loss of tele-l Loss of public l NO EFFECT l

NO EFFECT.

CATIONS [ phone system l address system l-l l(no' bell).

l l

l 1

1 I

l NOTE: Abbreviations - FC = Fail Closed F0 = Fail 0 pen j

FA = Fail "as is" SD = Shutdown FORM (01372 22 3643 4..