Forwards Safety Evaluation Granting Util Relief Requests V-115 & V-366 from Certain Pump & Valve Inservice Testing Requirements,Per 891107 & s.Relief Request V-371 Unnecessary Since Averaging Techniques Meet IWP-4150
ML20034C580
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/01/1990
From: Berkow H
Office of Nuclear Reactor Regulation
To: Beard P
FLORIDA POWER CORP.
Shared Package
ML20034C581 List:
References
TAC-75307, TAC-76359, NUDOCS 9005040164
Download: ML20034C580 (3)


Text

_.

j p m'9,[p

' UNITED STATES

.x

.h-f LY.

' NUCLEAR REGULATORY COMMISSION

l,m y

.t.

WASHINo t0N, D. C. 20s'i5 t-

\\N..../

May 1, 1990 Docket No. 50-302

-Mr. Percy M. Beard, Jr.

Senior Vice President,

-Nuclear Operations 1

Florida Power Corporation ATTN:

Manager, Nuclear _0perations a

Licensing P.O. Box 219-NA-21 p

Crystal; River, Florida 32629.

l

Dear Mn Beard:

q

SUBJECT:

CRYSTAL RIVER. UNIT 3 - RELIEF FROM INSERVICE TESTING REQUIREMENTS (TAC NOS. 75307-_AND-76359)

By letters dated-November 7,~ 1989'and March 7; 1990,-Florida Power Corporation (FPC) requested' relief from certain; pump and valve inservice testing

. requirements, as follows:

Relief Request No.

Description of Relief Requested V-115

. Relief from ASME Code,Section XI, 1983-Edition through Summer 1983 Addenda regarding testing frequency requirements (referencing ANSI Performance Test Code 25.3, 1976) and substitution-of ASME. Code Section XI. IWV-3510,~

1986 Edition, referencing ANSI /ASME OM-1, 1981,-

for inservice testing of -safety and relief valves except for the main steamusafety. valves'.

V-366 Relief from ASME Code-Section XI, IWV-3300 requirements for observation of valve position for 4 post-accident hydrogen purge. isolation valves, and substitution of alternate ~means of determining-. valve position.

V-371 Relief from the flow accuracy requirements for the chilled water pumps of=ASME Code Section XI, l=

IWP-4150, and substitution of alternate'means of assuring' accuracy.

We have reviewed these requests and, based on our review as summarized in the-p enclosed Safety Evaluation, herewith grant two of the requested reliefs, as noted below.

For relief requests V-115 and V-366, we-have determined, in accordance with 10 CFR 50.55a(a)(3)(i), that the alternatives proposed by FPC provide acceptable levels of quality and safety.

For relief request V-371, we-have determined, based on out. understanding of the Code, that manualTaveraging techniques are-c es war g

P i

m,

.. b' r

Y t

0 P. ' M. Beard, Jr. May 1, 1990 L

permitted to meet the requirements of IWP-4150'; and therefore that relief from' Code requirements is not necessary.

l This completes our efforts'on TAC Nos. 75307 and 763S9.

Sincerely,

.i Original Signed By Herbert N. Berkow, Director:

i Project Directorate II-2 Division of Reactor-Prbjects:- I/II.

Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page DISTRIBUTION:4 IDocketaE11esi i

NRC-& Local.PDRs

-PD22 Rdg. File T. Murley/F. Miraglia J. Partlow C. Rossi S. Varga

.G.

Lainas D. Miller H. Silver l

OGC E. Jordan L

ACRS (101 G. Hill s4)

GPA/PA OC/LFMB i

i 1

l L

. Il I r7 b.....!

k.......

f.....!_1 f' ___...!.

.)...

... [.........!

__5$((I.__.

$[........

$.......... b Iit$..................

I DATE $4/ 9/90 4hP90

$37 //90

$4/ /9

$4//[/90

[

L

.v<.

/

v L

0FFICIAL RECORD COPY

/

L' Document'Name:

CR UNIT 3 1

s h

J?

.)

i

.7

!I' Mr.' Percy M. Beard, Jr.

' Florida Power Corporation Crystal-River Unit No. 3 Nuclear -

Generating Plant ec:

Mr. A. H.-.Stephens General Counsel-State' Planning and Development-'

Florida Power Corporation:

Clearinghouse MAC - A50.

Office.of Planning and Budget--

P. O. Box 14042 Executive Office of tne Governor The Capitol' Building.

St. : Petersburg, Florida 33733 Tallahassee, Florida 32301' Mr. P. F-..McKee, Director-Chairman.

Nuclear (PlantOperations Board of County Commissioners Florida Power Corporation

' Citrus County P. O. Box 219-NA-2C Crystal River, Florida 32629

_110 North Apopka-Avenue

' Inverness, Florida -32650 q

Mr. Robert B. Borsum l

Babcock & Wilcox-Mr-Rolf 'C. Widell, Director.-.

Nuclear Operations ~ Site Support Nuclear Power Generation Division'

. Florida Power Corporation 1700 Rockville Pike Suite 525

,P.O. Box 219-NA-21 j

Rockville, Maryland 20852-Crystal River, Florida 32629 Senior Resident Inspector Crystal River Unit 3 Mr. Gary.L. Boldt?

-U.S. Nuclear Regulatory Commission Vice President,. Nuclear Production 15760 West'Powerline Street Florida power Corporation ~-

'1 1

Crystal;. River, Florida.32629

.P. O. Box 219-SA-2C~

' Crystal River, Florida 32629 j

Regional Administrator, Region II U.S. Nuclear Regulatory Commission j

101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Mr.' Jacob Daniel Nash Office-of Radiation Control a

Department of Health and Rehabilitative Services 3

1317 Winewood Blvd..

1 Tallahassee, Florida 32399-0700 l

o Administrator s

De p rtment of Environmental Regulation 9

Power Plant Siting Section State of Florida 2600 Blair Stone Road

l Tallahassee, Florida 32301 3

Attorney General Department of Legal Affairs The-Capitol Tallahassee, Florida 32304 l

l q

1

-i

_