ML20034C232
| ML20034C232 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 04/26/1990 |
| From: | Feigenbaum T PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-88-17, NYN-90100, NUDOCS 9005020197 | |
| Download: ML20034C232 (3) | |
Text
. -. _
w 1
- NeMHamoshire-i Toul C. F:.4, -- -
Senior Vice President and -
Chief Operating Officer NYN-90100-April 26, 1990 United States Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control' Desk
References:
(a) Facility Operating License Vio.<NPF-86 Docket No. 50-443:
(b) PSNH Letter NYN-89012 dated February 3, 1989, ' Response to Generic Letter 88-17.
"G.S.
Thomas to USNRC
Subject:
Supplemental Response to Generic Letter 88-17 Gentlemen:
In Reference (b), New Hampshire Yankee _(NHY) described the ' programmed.
enhancements" to'be implemented in response'to'the recommendations of Generic Letter 88-17.
The enhancements described ~in: Reference-(b) consisted of hardware installation and/or modifications ~ scheduled for completion prior:
to startup following the first refueling 4 outage and progransnatic' enhance-ments scheduled for completion by May_1._1990.
The: purpose of this-letter is to inform you that certain programmatic enhancements originally scheduled for completion by May 1, 1990, have been rescheduled for-.
complet. ion at a later date as = described' below.
New Hampshire Yankee has completed a' substantial portion'of the programmatic enhancements originally scheduled for completion by May 1, 1990. Adminirtrative and operating procedures have been revised. These revisions established requirements-for RCS temperature and level' monitoring,-.
containment closure, available RCS vent paths, and work control during reduced RCS inventory conditions. A detailed analysis of Reactor Coolant System (RCS) mid-lw p operating conditions was completed on March 23, 1990.
This analysis will provide supporting.information for the remaining-programmatic enhancements.
Primarily as a result of priority given to preparing.for and supporting the Power Ascension Testing Program,,the remaining progrrmmatic enhancements originally scheduled for completion by May 1, 1990 have.been reschedulnd to be co;npleted as soon as practicable during the' remainder of.1990. The rese.heduled programmatic enhancements can be generally summarized as follows:
- Additional administrative and operating procedure' revisions as necessary~to fully address work coordination, configuration control, equipment support, minimizing the effects of RCS perturbations,.and 90050201N Nd E N PDR ADOCK 05000443 P
PDC Qf';
New Hampsnire rankee Division of Public Service Company of New Hampshire P.O.' Box 300 a Seabrook, NH 03874
- Telephone (603) 474 9521 0
t
e'
.0' m
United Stateo Nuclear Regulatory Commission April 26.-1989 Attention: _ Document Control Desk-Page two
- Arnormal Operating Procedure revisions-based upon recommendations-contained in Westinghouse Abnormal Response Guideline ARG-1, " Loss off R3R while operating at Mid-Loop Conditione",;which was delivered by-the Vestinghouse-Owners Group to New Hampshire Yankee representatives-by cover. letter dated March 26, 1990, A revision to Technical Specificatione to permit the_use of a SafetyT e
Injection Pump in connection with aLbackup supply of make-up water to the RCS. New Hampshire Yankee expects to submit a license amendment request to the NRC-by July 31,:1990,. for this and other Technical =
Specification revisions needed to complete the programmatic and hardware enhancements associated with-our response,to Generic Letter 88-17.
New Hampshire Yankee will make every effort-to complete.all rescheduled programmatic enhancements by December 31, 1990."
.New Hampshire Yankee does not expect to operate.Seabrook Station at' reduced RCS inventory conditions' prior to the first refueling outage,.
currently planned for mid-1991. If operStion-at reduced-RCS inventory is:
required prior-to the first refueling outage, NHY.will take appropriate-compensatory measures.
Should you have any questions regarding the'above, please contact Mr.
Terry L. Harpster, Director of Licensing Sarvices,'at (603)z474-9521, extension 2765.
1Very truly yours, hl Ted C. Feigenbaum l
1 t
i 3-
_______2-____
United States Nuclear Regulatory Commission-April 26, 1989.
Attentions Document Control Desk Page three cc Mr. Thomas T. Martin Regional Administrator United States Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussie., PA 19406 c
Mr. Victor'Nerses, Project Manager Project Directorate I-3 United. States-Nuclear Regulatory Commission Division of Reactor Projects Washington. DC 20555 l
Mr. Noel Dudley NRC Senior Resident Inspector P.O. Box 1149 Seabrook, NH 03874 L
3 l'