ML20034C103

From kanterella
Jump to navigation Jump to search
Forwards Insp 50-482/90-10 on 900312-16.No Violations or Deviations Noted.Open Items Re Keycard/Badges Inadvertently Removed from Protected Area & Visitors Not Properly Escorted Noted
ML20034C103
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/16/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20034C104 List:
References
NUDOCS 9005020064
Download: ML20034C103 (3)


See also: IR 05000482/1990010

Text

.

.:

,.

y

(

.:

IO

M' -

In Reply Refer To:

DOCUMENT CONTAINS .

L

Docket:

STN 50-482/90-10,

SAFEGUARDS INFORMATION

Wolf Creek Nuclear Operating Corporation

-ATTN: Bart D. Withers:

President and Chief Executive Officer

P.O. Box 411

Burlington, Kansas 66839

. Gentlemen:

This refers to the inspection conducted by Mr. A. B. Earne~st of_this' office

during.the period March 12-16, 1990,.of. activities authorized by NRC Operating

License NPF-42 for Wolf Creek Generating Station (WCGS), and to the discussion

of our findings with members of your staff at the conclusion of the-inspection.

The inspection reviewed certain areas of your physical security program.

~

Within these areas, the inspection consisted of selective examination of-

procedures. and representative records, interviews' with: personnel,-and

observations by the inspector. The inspection findings are docurrated in the-

1

enclosed inspection report..

We have also examined actions you have taken with regard to previously

1;

identified inspection findings. The status of these . items is identified in

paragraph 2 of the enclosed report.

'

Within the scope of the inspection, no violations or deviations were

identified. Your staff, however, made:two commitments to NRC staff in response

to recent events at WCGS. We have characterized these commitments as open-

items in the enclosed inspection report.because we wish.to review the

, (

,

implementation of these commitments at a later date. One.open-item in

'

paragraph 3 of the enclosed report references'the significant' number of.

I

keycard/ badges that have been inadvertently removed-from the protected area.

1

Your staff has been evaluating this problem and committed during a teleconference

on March 21, 1990, between Mr. Ml Williams and Mr. J. Johnson of your staff and

Dr. D. powers of our staff, to installing equipment within the next 6 months,

that will prevent the inadvertent removal of the keycard/ badges. A second open

item in paragraph 3 of the enclosed report referencescan incident wherein

visitors were not properly escorted. This incident was, reported to NRC.

Based

on the teleconference.on March 21, 1990, your staff committed to change the

'

procedure that outlines the escort program requirements.

Your corrective-

action in these areas will be evaluated in future inspections.

In' addition, an

unresolved item in paragraph 3 of.the enclosed report details a physical

N48

security plan change submitted under the provisions of 10 CFR 50.54(p), that,

.

581

in part, apparently reduces the effectiveness of the plan. We will review your

i

oo

reply to our letter of Apri.13,1990, on this subject prior to resolving this

R$

issue.

,

a

ENCLOSURE CONTAINS

RIV:SEPS

C:SEPS

D:DRSS

D:

N

SAFEGUARDS INFORMATION

  • ABEarnest:lta
  • DAPowers

ABBeacl#[

S

ns

8

04/02/90

04/02/90

4/g/90

$

+

/90

UPON SEPARATION THIS

88

  • Previously concurred

PAGE IS DECONTROLLED

eaa

j

DOCUMENT CONTAINS

\\

k

SAFEGUARDS INFORMATION

Q

-

.

.o

,

.

.

Wolf-Creek Nuclear

-2-

Operating Corporation

l

-

-

i

The material enclosed herewith contains Safeguards Information as defined by

'

10 CFR Part 73.21 and its disclosure-to unauthorized individuals is prohibited

by Section 147 of the Atomic Energy Act of 1954,-as. amended.

Therefore, the:

material, with the exception of the report cover page which is an inspection-

summary, will not be placed in the Public Document Room.

Should you have any questions concerning 'this inspection,- we will be pleased to

discuss them with you.

Sincerely,

f

.

3

Samuel J. Collins, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-482/90-10

g

i

cc w/ summary page only:

Wolf Creek Nuclear Operating Corp.

i

ATTH: Gary Boyer, Plant Manager

P.O. Box 411

Burlington , . Kansas 66839

l

Shaw, Pittman, Potts & Trowbridge

I

ATTN: Jay Silberg, Esq.

I

1800 M Street, NW

Washington, D.C.

20036

Public Service Commission

ATTN: Chris R. Rogers, P.E.

  1. .

Manager, Electric Department

4

P.O. Box 360

l

i

Jefferson City, Missouri 65102

i

U.S. Nuclear Regulatory Commission

ATTN:

Regional Administrator, Region III

799 Roosevelt Road

.

'

Glen Ellyn, Illinois 60137

j

Wolf Creek Nuclear Operating Corp.

i

ATTN: Otto Maynard, Manager

'

.

Regulatory Services

P.O. Box 411

i

Burlington, Kansas 66839

ENCLOSURE CONTAINS

SAFEGUARDS INFORMATION

UP0:1 S~.PIRATION THIS

PACE IS DECONTROLLED

i

.

':

  • '

. . ,

,

.

,

.-

Wolf Creek Nuclear

-3-

!

Operating Corporation

.;

U.S. Nuclear Regulatory Commission

ATTN: Resident Inspector

P.O. Box 309

!

~ Fort Calhoun, Nebraska 68023

U.S. Nuclear Regulatory Commission

ATTN: Regional Administrator, Region IV

'

611 Ryan Plaza Drive, Suite 1000-

Arlington, Texas- 76011

'

bec copy of entire; report:

,'

RIV Security File

Christy Moore, RSGB/NRR

-

R. D. Martin, RA

B. Beach, DRSS

Section Chief, SEPS

1

Resident Inspector

SEPS File

G. F. Sanborn, E0

D. M. Crutchfield, NRR

bec copy of letter.and inspection summary only w/766:

MIS

DRP

Lisa Shea, RM/ALF

'

Section Chief, DRP/D

RIV File

RSTS Operator

Project Engineer, DRP/D

'bec copy of letter and inspection summary only w/out 766:

DMB IE-04

DRS

Myron Karman, ELD, MNBB

B. DeFayette, RIII

Callaway, RIII

D. Pickett, NRR Project Manager

i

'l

ENCLOSURE CONTAINS

'

SAFEGUARDS INFORMATION

UPON SEPARATION THIS

PAGE IS DECONTROLLED