Forwards Safety Insp Rept 50-457/90-12 on 900320-0405.No Violations Noted.Cause of Event Appears to Have Originated as Result of Poor Communication Practices Between Supervisors & Operators
ML20034B729
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 04/18/1990
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20034B730 List:
References
NUDOCS 9004300261
Download: ML20034B729 (2)


See also: IR 05000457/1990012

Text

g

.

ve.o

.

,

'

'

e

,

.

,

'

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted by Messrs.

J. A. Hopkins, T. M. Tongue, and T. E. Taylor of this office from March 20

through April 5, 1990, at the Braidwood_ Station, Unit 2, authorized by NRC

Operating License No. NPF-77, and to the discussion of our findings with-

Mr. Querio and others of your staff at the conclusion of the inspection.

The special inspection was related to the inadvertent depressurization

of the reactor coolant system and rapid pressurizer cooldown event that.

occurred on March 18, 1990.

The enclosed copy of our inspection resort identifies areas examined during

the inspection. Within these areas, t1e inspection consisted of a- selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection. The cause of the event appears to have originated as,a result

of poor communication practices between supervisors and operators. This

deficiency is being corrected by licensee initiated programs which will

identify non-routine evolutions that require increased communications

between supervisors and operators.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy. of

this letter and the enclosed inspection report will be placed in the NRC.

Public Document Room.

l

hD

[

-

bkNbbN bNh7

.

l_

g

,

,

h

r

e

v

.

.

,

.

.

.

,

Commonwealth Edison Company

2 O I 8 1990

We will gladly discuss any questions you have concerning this_ inspection.

Sincerely,

moriginal stgmed by W.D. Shafer"

i

W. D. Shafer, Chief

Reactor Projects Branch 1

Enclosure:

Inspection Report

No.50-457/90012(DRP)

cc w/ enclosure:

T. J. Maiman Vice President,

PWROperatIons

P. Kovach, Nuclear

Licensing Manager

S. Hunsader, Nuclear

Licensing Administrator

R. E. Querio, Station Manager

D. J. Miller, Regulatory

Assurance Su

DCD/DCB(RIDS)pervisor

Licensing fee _ Management Branch

Resident Inspector, Rill

Braidwood

Resident Inspector, Rlll Byron

l

Resident Inspector, R!ll Zion

!

D. W. Cassel, Jr., Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, 0GC

G. Berry. 0GC

Stephen P. Sands, NRR

l

RIII

Rill

-1

RL

un/jp

Sa

Shafe

j

f q ,gan

sm

mln0

04//8/90

_q

yp