Forwards Safety Insp Rept 50-333/90-13 on 900220-0302 & Notice of Violation.Insp Covered Fire Protection Program & Related Activities.Ack Receipt of Re Findings of SSFI Conducted by NRC in May 1989
ML20034A900
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/13/1990
From: Hodges M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fernandez W
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20034A901 List:
References
NUDOCS 9004250036
Download: ML20034A900 (3)


See also: IR 05000333/1990013

Text

.

-.

.

.

-

.

i

APR 131990

Docket No. 50-333

Power Authority of the State'of New York

James A. FitzPatrick Nuclear Power Plant

ATTN: Mr. William Fernandez

Resident Manager

,

P. O. Box 41

Lycoming, New York 13093

-

Gentlemen:

.

Subject:

Region I Inspection Report No. 50-333/90-13

This letter refers to the routine safety inspection by Messrs. T. Koshy and

J. Lara at the James A. FitzPatrick Nuclear Power Plant in Scriba, New York.

The reporting period ~ covers the time from February 20 through March 2,'1990.

l

The inspection consisted of document reviews, interviews and observation of

activities as described in the NRC Region I Inspection Report' which is enclosed

with this letter. The findings were summarized and discussed with you and

members of your staff at the conclusion of the inspection.

3

This inspection covered two areas:

(1) the fire protection program and related

activities and (2) your actions taken in response to our letter, dated

August 22, 1989, which transmitted the results of the Safety System Functional

Inspection (SSFI) conducted by the NRC in May 1989. Our evaluation of these

actions is presented in the enclosed report. We acknolwledge receipt of your

'

letter, dated September 21, 1983, regarding the findings of theJSSFI, and have-

l-

noted your disagreement with several of the violations - We will respond to

l

your comments in a separate letter.

Based on the results of this inspection, it appears that one of your

'

activities was not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix:A. .The

violation in the Notice involves one example of NYPA having provided NRC

inaccurate information in a Technical Specifications change submittal. This

violation has been categorized by severity-level- in accordance with the

" General Statement of Policy and Procedure for NRC Enforcement Actions,"-

10 CFR- Part 2, Appendix C (Enforcement Policy).

You are required to respond

to this letter and in preparing your response, you should follow the

instructions in Appendix A.

i

0FFICIAL RECORD COPY

FITZ JL - 0001.0.0

[(

9004250036 900413

04/06/90

i

{DR

ADOCK0500gg3

}.g

.

' 'e

.'.

.

APR 131990

'

'

.

Power Authority State of NY

2

i

Your cooperation with us in this matter is appreciated.

7

Sincerely.

Original Signod Dy:

Marvin W. Hodges

Marvin W. Hodges, Director

'

Division of Reactor Safety

Enclosure:

NRC Regien 1 Inspection Report No. 50-333/90-13

cc w/ enc 1:

J. Phillip Bayne, President

J Brons, Executive Vice President

A. Klausmann, Senior Vice President - Appraisal and Compliance Services

R. Patch, Quality Assurance Superintendent

G. Wilverding, Manager Nuclear Safety Evaluation

G. Goldstein, Assistant General Counsel

R.-Beedle, Vice President Nuclear Support

S, Zulla, Vice President Nuclear Engineering

R, Burns, Vice President Nuclear Operations

J. Gray, Director Nuclear Licensing - BWR

,

Dept, of Public Service, State of New York

State of New; York, Department of Law

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York, SLO Designee

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

'

J. Linville, DRP

0, Limroth, DRP

M. Conner, SALP Reports Only

PA0 (17) SALP Reports Only

D. LaBarge, NRR

.

J. Dyer, EDO

<

.

CQ

gh'

RI:DRP

RI:DRS

RI:DRS.

RI:DRS

RL:DRS:

R .RA.

,

Koshy/rw

Lara

Anderson

Durr

-Hodges

M rtin

3/ /90

3/ ./90

3/ ./90

$l2 T/90

4/7/90

4/$/90

0FFICIAL RECORD COPY'

FITZ JL - 0001.1.0

04/06/90

-

'

. ' .

-

c,

'

APft 131990

Power Authority State of NY

2

i

Your cooperation with us in this matter is appreciated.

Sincerely,

'

,

Jacque P. Durr, Chief

,

Engineering Branch

Division of Reactor Safety

Enclosure:

!

NRC Region I Inspection Report No. 50-333/90-13

cc w/ enc 1:

'

J. Phillip Bayne, President

J. Brons, Executive Vice President

A. Klausmann, Senior Vice President - Appraisal and Compliance Services

R. Patch, Quality Assurance Superintendent

G. Wilverding, Manager Nuclear Safety' Evaluation

G. Goldstein Assistant General Counsel

R. Beedle, Vice President-Nuclear Support

S. Zulla, Vice President Nuclear Engineering

R. Burns, Vice President Nuclear Operations

J. Gray, Director Nuclear Licensing - BWR

Dept. of Public Service, State of New York

State of New York, Department of Law

l

Public Document Room (PDR)

Local Public Document' Room (LPDR)

Nuclear Safety Information-Center (NSIC)

,

l

NRC Resident Inspector

(

State of New York, SLO Designee

bec w/ encl:

l

Region I Docket Room (with concurrences)

L

Management Assistant, DRMA (w/o enc 1)

!

J.' Linville, DRP

1

D. Limroth, DRP

l

M. Conner, SALP Reports Only

l

PA0 (17) SALP ' Reports Only

L

D. LaBarge, NRR

l

.J. Dyer, EDO

c )4

R :DRP

RI:DRS

RI:0RS

RI:DRS

~

Koshy/rw

fgLara

Anderson

Durr

3/Al/90

3/Al/90

3/31/90

3/ /90

0FFICIAL RECORD COPY

FITZ JL -- 0001.1.0

03/19/90