ML20034A654
| ML20034A654 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 04/16/1990 |
| From: | Greger L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20034A653 | List: |
| References | |
| 50-456-90-09, 50-456-90-9, 50-457-90-09, 50-457-90-9, NUDOCS 9004240054 | |
| Download: ML20034A654 (1) | |
Text
..
Il0TICE OF VIOLATI0ft Commonwealth Edison Company Licenses flo. itPF-72; ilPF-77 Docket flos.
50-456; 50-457 As a result of the inspection conducted on March 13-23, 1990, and in accordance with 10 CFR Part 2, Appendix C - General Statement of Policy and Procedure for 11RC Enforcement Actions (1990), the following violation was identified:
Technical Specification 6.8.4,d.3 requires that a program be implemented-to ensure the capability of the post-accident. sampling equipment to obtain containment atmosphere samples under accident' conditions.
Licensee procedure, NO Directive fl0D-CY.5, " Post Accident Sampling System Surveillance Frequency," specifies that the gas partitioner of the containment atmosphere sampling system will be operated quarterly-to ensure the operability of the post accident sampling system.
Contrary to the above, the Unit 1 gas partitioner was not operated between March 1987 and February 1990, and the Unit 2 gas partitioner was operated once in 1988 and once in 1989.
This is a Severity Level IV violation (Supplement VIII).
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation:
(1) the corrective actions that have been taken and results achieved; (2) the corrective actions that will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown.
APR 101990 y
Date L. R Wer't G~reger, Chief Reactor Programs Branch 9004240054 900416
~
PDR ADOCK 05000456 O
PDC i
-