Proposed Tech Specs Changes 234a Re one-time Change Which Involves Postponing Next Snubber Visual Insp Until Scheduled mid-cycle Outage in Fourth Quarter of 1990
ML20034A546
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 04/12/1990
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20034A533 List:
References
NUDOCS 9004230453
Download: ML20034A546 (2)


Text

=

h ATTACHNENT 2 i

t i

i PEACH BOTTON ATONIC POWER STATION UNIT 3 t

e i

l k

L!

t Docket No. 50-278 License No. DPR-56 I

I TECHNICAL SPECIFICATION CHANGES 234a I~

l

.l i

I

(

e i

i

  • ~ ' '

l t

l l

l

\\

1

)

1 f

1 i

+

i '

i fgg4230gCK0500 33 90o43p AD p

g 4

L

.y.,%

,,.,'.9,-

Unit 3

~PBAPS LkMITINGCONDITIONSFOROPERATION SURVEILLANCE REQUIREMENTS l

3.11.0.

Shock Suppressors 4.11.D. Shock-Suppressors-(Snubbers) on Safety Related (Snubbers) on Safety Related-Systems Systems 3.11 D.1 During all modes of 4.11.D.1 operation all snubbers on safety-related systems shall be operable except Snubbers required to be as noted in 3.11.D.2 and 3.11.D.3 operable under the provisions ~..

3 i

below. -Snubbers on non-safety related of'3.11.D.1 shall be demonstrated-systems-are excluded from this requirement OPERABLE by performance.of--the' if their' failure or failure of the system following augmented. inservice

.on which. installed has no adverse effect.

inspection program and the:

t on a. safety-related system, requirements of Specification 4.6.G.

3.11.D.2 During operation _in the' cold 4.11.D.2 shutdown _or refueling modes, snubbers located on systems required to be' operable Snubbers required to be-~

shall be operable except as noted in operable under the provisions ~

t 3.11.D.3.

of 3.11.D.1 shall be visually-inspected.according to the 3.11.D.3 With one or more snubbers following schedule.

. inoperable under the requirements of 3.11.D.1, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, replace No.-of Snubbers

- Next. Visual' or restore the inoperable snubber to Found Inoperable

~ Inspection tne operable status and perfora an During Inspection engineering evaluation per specification Period

_ Period

  • l~

4

~

4.11.D.6.

If these requirements cannot.

be met, declare the supported system 0

18 mo.. + 25% :

inoperable and follow the applicable 1

- 12 mo. + 25%.

i Limiting Condition for Operation for 2.

6 mo. [ 25%.

that System.

3,4

,4 mo.'+ 25%

5,6,7

.2'mo. I 25%-

8 or more' 1 mo. _ 25%

I The required inspection' interval l

shall not bezlengthened more l

than one step-at a time.

The.

provisions for extending" surveillance-i frequency included _in,Section.1.0 Definitions do not apply. ' Snubbers may be categorized:in two groups,

" accessible" or-" inaccessible". based v

on their accessibility for inspection during reactor operation.

These two groups may be inspe'cted independently _according to the above schedule.

  • Those surveillances on inaccessible snubbers which must be performed l

on or before May 26, 1990 and are.

required by TS~4.11.D.2 may be delayed for a period not to exceed December 31, 1990.

~234a-