Text
_
..
g.
,
.-
.
-
.
,
pn O
Docket / License Nos.:
50-317/0PR-53
50-318/0PR-69
Baltimore Gas and Electric Company
ATTN: Mr. George C. Creel
Vice President
Nuclear Energy
Calvert Cliffs Nuclear Power Plar.t
MD Rts 2 and 4
Post Office Box 1535
{
Lusby, Maryland 20657
<
Gentlemen:
A
' l
Subject:
NRC Region I Combined Inspection Report Nos. 50-317/90-81 and
-
50-318/90-81
A special inspection of your Commitment Implementation Assessment (CIA) Project
was conducted by Mr. D. Vito of this office and other members of an NRC team on
March 5-9, 1990, at the Cahert Cliffs Nuclear Power Plant, Lusby Maryland.
Discussions of our findings were presented by Mr. Vito to you and your staff at
the conclusion of the inspection.
The specific areas of the CIA Project which were examined during this inspec-
tion are described in the NRC Region I inspection report which is enclosed.
Within these areas, the inspection consisted of the examination of procedures
and records representative of the CIA Froject, interviews with personnel, and
observations of the inspectors.
,
'4
Within the scope of this inspection, no violations were identified.
The
I"
inspectors determined that the results of the CIA Project provide reasonable
k
assurance that prior commitments of safety-significance have been adequately
iy
addressed and that there is minimal likelihood of additional issues of high
<.;
safety-significance (like the Low Temperature Overpressure Protection issue)
which remain unidentified.
No reply to this letter is required. However, you are requested to review the
conclusions noted in this inspection report and consider them accordingly in
the development of the amendment to your Performance Improvement Plan which
will address improvements to the management of regulatory commitments.
Your
cooperation with us in this matter is appreciated.
Sincerely,
ORIGINAL SIGNED BW
,
i
William F. Kane, Director
{
Division of Reactor Projects
0FFICIAL RECORD COPY CIR CC 90-81 - 0001.0.0
i
9004130123 900402
03/30/90
{DR
ADOCK 050003}7
fI l\\
l
PDL
(
p
__
__
_
=
2
d
'
,.
,
Baltirnere Gas and Electric Company
2
Enclosure: NRC Region ! Combined Inspection Report Nos. 50-317/90-81 and
50-318/90-81
cc w/ene).
W. Lippold, General Supervisor, Technical Services Engineering
T. Magette, Administrator, Nuclear Evaluation.
J. Lemons, Manager, Nuclear Outsge Management
R. Denton, Manager, Calvert Cliffs Nuclear Power Plant
J. Walter, Engineering Division, Public Service Commission of Maryland
K. Burger, Esquire, Maryland People's Counsel
P. Birnie, Maryland Safe Energy Coalition
Pub? 'c Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maryland (2)
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
W. Russell, RA
T. Martin, DRA
W. Kane, DRP
J. Wiggins, DRP
J. Linville DRP
C. Cowgill DRP
D. Limroth, DRP
K. Lathrop, DRP
K. Abraham, PA0
,
M. Miller, SLO
P. Kelley, RI - Indian Point 2
M. Banerjee, RI - Oyster Creek
<
S. Pindale, RI - Salem
J. Dyer, EDP
M. Callahan, OCA
B. Boger, NRR
R. Capra, NRR
D. Mcdonald, NRR
/
R%
% RP
&
RI:
P
I.DRP,
0
md
owgill
Linville
iggins
e
'
'39/90
3g7/90
- <-
90
3,
,,0
'
3
,0
0FFICIAL RECORD COPY CIR CC 90-81 - 0002.0.0
03/27/90
\\
..
a