Forwards Insp Repts 50-317/90-81 & 50-318/90-81 on 900305-09.No Violations Noted.Results of Commitment Implementation Assessment Project Provide Reasonable Assurance That Prior Commitments Adequately Addressed
ML20033G933
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/02/1990
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20033G934 List:
References
NUDOCS 9004130123
Download: ML20033G933 (2)


See also: IR 05000317/1990081

Text

_

..

g.

,

.-

.

-

.

,

pn O

Docket / License Nos.:

50-317/0PR-53

50-318/0PR-69

Baltimore Gas and Electric Company

ATTN: Mr. George C. Creel

Vice President

Nuclear Energy

Calvert Cliffs Nuclear Power Plar.t

MD Rts 2 and 4

Post Office Box 1535

{

Lusby, Maryland 20657

<

Gentlemen:

A

' l

Subject:

NRC Region I Combined Inspection Report Nos. 50-317/90-81 and

-

50-318/90-81

A special inspection of your Commitment Implementation Assessment (CIA) Project

was conducted by Mr. D. Vito of this office and other members of an NRC team on

March 5-9, 1990, at the Cahert Cliffs Nuclear Power Plant, Lusby Maryland.

Discussions of our findings were presented by Mr. Vito to you and your staff at

the conclusion of the inspection.

The specific areas of the CIA Project which were examined during this inspec-

tion are described in the NRC Region I inspection report which is enclosed.

Within these areas, the inspection consisted of the examination of procedures

and records representative of the CIA Froject, interviews with personnel, and

observations of the inspectors.

,

'4

Within the scope of this inspection, no violations were identified.

The

I"

inspectors determined that the results of the CIA Project provide reasonable

k

assurance that prior commitments of safety-significance have been adequately

iy

addressed and that there is minimal likelihood of additional issues of high

<.;

safety-significance (like the Low Temperature Overpressure Protection issue)

which remain unidentified.

No reply to this letter is required. However, you are requested to review the

conclusions noted in this inspection report and consider them accordingly in

the development of the amendment to your Performance Improvement Plan which

will address improvements to the management of regulatory commitments.

Your

cooperation with us in this matter is appreciated.

Sincerely,

ORIGINAL SIGNED BW

,

i

William F. Kane, Director

{

Division of Reactor Projects

0FFICIAL RECORD COPY CIR CC 90-81 - 0001.0.0

i

9004130123 900402

03/30/90

{DR

ADOCK 050003}7

fI l\\

l

PDL

(

p

__

__

_

=

2

d

'

,.

,

Baltirnere Gas and Electric Company

2

Enclosure: NRC Region ! Combined Inspection Report Nos. 50-317/90-81 and

50-318/90-81

cc w/ene).

W. Lippold, General Supervisor, Technical Services Engineering

T. Magette, Administrator, Nuclear Evaluation.

J. Lemons, Manager, Nuclear Outsge Management

R. Denton, Manager, Calvert Cliffs Nuclear Power Plant

J. Walter, Engineering Division, Public Service Commission of Maryland

K. Burger, Esquire, Maryland People's Counsel

P. Birnie, Maryland Safe Energy Coalition

Pub? 'c Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maryland (2)

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

W. Russell, RA

T. Martin, DRA

W. Kane, DRP

J. Wiggins, DRP

J. Linville DRP

C. Cowgill DRP

D. Limroth, DRP

K. Lathrop, DRP

K. Abraham, PA0

,

M. Miller, SLO

P. Kelley, RI - Indian Point 2

M. Banerjee, RI - Oyster Creek

<

S. Pindale, RI - Salem

J. Dyer, EDP

M. Callahan, OCA

B. Boger, NRR

R. Capra, NRR

D. Mcdonald, NRR

/

R%

% RP

&

RI:

P

I.DRP,

0

md

owgill

Linville

iggins

e

'

'39/90

3g7/90

<-

90

3,

,,0

'

3

,0

0FFICIAL RECORD COPY CIR CC 90-81 - 0002.0.0

03/27/90

\\

..

a