Text
.
.
,
.'
-
, .
,
APR 0 4199
Cocket No. 50-336
Northeast NJclear Energy Company
ATTN: Mr. Edward J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations
P.O. Box 270
Hartford, Connecticut
06141-0270
Gentlemen:
Subject. NRC Region I Inspection No. 50-336/90-01
This refers to the routine resident safety inspection conducted by Messrs. W.
Raymond and P. Habighorst of this office on. January 20 - March 5, 1990, at
Millstone Nuclear Power Station, Unit 2, Waterford, Connecticut of activities
authorized by NRC License No. DPR-65 and to the discussions of our findings by
Mr. Habighorst with Mr. Keenan and others of your staff at the conclusion of
the inspection.
Areas examined during this inspection are described in the NRC Region I
inspection report which is enclosed with this letter. Within these areas, the
inspection consisted of observation of activities, interviews with personnel,
measurements, and document reviews.
Based on the results of this inspection, it appeers that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation enclosed herewith as Appendix A.
The violation involved
operation of the facility outside a limiting condition for operation without
submitting a Licensee Event Report (LER). This event was previously documented
in inspection report 50-336/89-05 with the understanding that an LER was-in
preparation for submission to the NRC. No LER do:umented this event.
You are
required to respond to this letter and in preparing your response, you should
follow the instructions in Appendix A.
The response directed by this letter and the accompanying notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL-96-511.
Your cooperation with us is appreciated.
Sincerely,
i
opmtN AL SIGNED BY.
Edward C. Wenzinger, Chief
Projects Branch No. 4
Division of Reactor Projects
1
0FFICIAL RECORD COPY
IR MILL 2 90-01 - 0001.0.0
1
11/29/80
J
9004130065 900404
/
l
FDR
ADOCK 05000336
,
Q
j
i
.
.
,'
94
i
-
.
,
,
Northeast Nuclear Energy Company
2
APR 04 W
j
,
i
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report No. 50-336/90-01
,
cc w/encis:
W. D. Romberg, Vice President, Nuclear Operations
S. E. Scace, Nuclear Station Director, Millstone Station
J. S. Keenan, Nuclear Unit Director, Millstone Unit 2
R. M. Kacich, Manager, Generation Facilities Licensing
D. O. Nordquist, Director of Quality Services
'
Gerald Garfield, Esquire
Public Document Room (PDR)
i
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
'
NRC Senior Resident Inspector
State of Connecticut
bec w/ enc 15:
Region I Docket Room (with concurrences)
ManagementAssistant,DRMA(w/oenclosures)
D. Haverkamp, DRP
W. Raymond, SRI, Millstone
G. Vissing, NRR/PDIA
P. Habighorst, RI, Millstone 2
'
O. Shediosky, SRI, Haddam Neck
M. Conner, ORP (See Section 6.3, 6.4, 6.5 and 6.6)
1
p/
,
RI:DRP
R
P
R
RI.
H g orst
R
id
H
amp
Wei
er
04/ /90
04/J/90
04/S/90
04/ 7)/90
0FFICIAL RECORD COPY
IR mLL2 90-01 - 0002.0.0
11/29/80