ML20033G790
| ML20033G790 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 03/23/1990 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Eury L CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20033G791 | List: |
| References | |
| NUDOCS 9004120130 | |
| Download: ML20033G790 (3) | |
See also: IR 05000261/1989030
Text
_
3
,
'
?
...
,
.'
,
'
, - .
.
MAR 231990
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN: Mr. Lynn W. Eury
Executive Vice President
Power Supply
P. O. Box 1551
Raleigh, NC 27602
Gentlemen-
SUBJECT: NRC INSPECTION REPORT NO. 50-261/89-30
The NRC Systematic Assessment of Licensee Performance (SALP) has been completed
for your H..B. Robinson facility.
The facility was evaluated for the period -
November 1, 1988 through December 31, 1989.
The results of the evaluation are
documented in the enclosed Initial SALP Report. This report will be discussed
with you at a public meeting to be held at the Robinson Visitor's Center on
March 30, 1990, at 10:00 a.m.
The performance of your H. B. Robinson facility was evaluated in the functional
areas of plant operations, radiological controls, maintenance / surveillance,
emergency preparedness, security, engineering / technical support, and safety
assessment / quality verification.
The quantitative ratings awarded bythe SALP.
Board reflect good performance.
However, the1 narrative description of the
functional area evaluations identify many items. that' need. attention.
The
report indicates that in these areas corrective actions are being developed or.
issues are being addressed to determine root causes, but that the'NRC staff
could not determine the effectiveness of the- programs or . actions .at this
time.
Thus, the SALP ratings depend to a certain degree on effective and
l
timely implementation of _ future corrective actions,
Significant improvement in radiological controls was Lindicated, and in the
i
l
area of emergency preparedness strong performance in response to actual. events
was evident.
In addition, strengths were noted in.your emphasis on communica-
~
tions and procedure improvement.
Security has also continued to be a. strength
l
in your program.
In the maintenance / surveillance area, your' performance was
good; however, weaknesses were identified in procedure adherence. . In addition,
'
the SALP board recommended increased attention to your preventive / predictive
maintenance program.
The SALP board also noted mixed performance in the area of engineering / technical
support.
While performance was strong in design review and ongoing support of'
l
major modifications, routine plant operations did not appear to receive a
.
1
-
l
[$[1$0cb0 b
81
e
.y
32V0 '
C
s'
'.
MAR 231990
Carolina Power and Light Company
2
commensurate level of technical support.
The SALP board noted the strong
performance of the engineering and technical support organization's response to
the numerous major issues this assessment periodj however, the board recomends
increased mangement attention to ensure routine plant operations and modifica.
tiens receive appropriate attention from the technical staff.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely.
(Original signed by SDEbneter)
Stewart D. Ebneter
>
Regional Administrator
Enclosure
',
Initial SALP Report - H.-B. Robinson
cc w/ enc 1:
C. R. Dietz, Manager
i
RobinsonNuclearProjectDepartment
i
H. B. Robinson Steam Electric Plant
P. O. Box 700
,
Hartsville, SC 29550
t
R. E. Morgan. Plant General Manager
'
H. B. Robinson Steam Electric Plant
-
P. O. Box 790
Hartsville, SC 29550
,
Dayne H. Brown Director
>
Div4sion of Radiation Protection
'
,
N. C. Department of Environment,
,
health & Natural Resources
P. 0. Box 27687
l
Raleigh, NC 27611-7687
McCuen Morrell, Chaiman
Darlington County Board of Supervisors
County Courthouse
Darlington, SC 29535
Richard E. Jones, General Counsel
.
Carolina Power and Light Company
'
P. O. Box 1551
Raleigh, NC 27602
i
!
(cc w/ enc 1 continued - See'page 3)
l
!
i
. . .
o
.
,'
dAk OO l99Q
Carolina Power and Light Company
3
(cc w/ enc 1 cont'd)
H. A. Cole
Special Deputy Attorney General
State of North Carolina
P. O. Box 629
Raleigh, NC 27602
Avery Upchurch, Chairman
Triangle J Council of Governments
100 Park Drive
P. O. Box 12276
Research Triangle Park, NC 27709
Robert Gruber
Executive Director
Public Staff - NCbC
P. O. Box 29520
Raleigh, NC 27626-0520
bec w/ enc 15:
K. M. Carr, Chairman
T. M. Roberts, Connissioner
F. J. Remick, Connissioner
K. C. Rogers, Commissioner
J. R. Curtiss, Commissioner
J. M. Taylor, ED0
H. L. Thompson, Jr., EDO
R. W. Borchardt, Regional
Coordinator, EDO
T. E. Murley, NRR
S. Varga, NRR
E. Adensam, NRR
R. Lo, NRR
R. Nease, SALP Coordinator, NRR
Regional Administrators, RI R!l!
RIV, and RV
K. Clark, Rll, PA0
D. Verre111, DRP, Ri!
H. Dance, DRP, Rll
M. Glasman, DRP, Rll
K. Landis, Chief, TSS
NRC Resident inspector
DRS and DRSS Branch Chiefs,
and Section Chiefs
INP0
1MPELL
Document Control Desk
R!l:DP/
Ril:DRP
RII:DRf
R 1:D P
Ril ki
R
,R
' RJ4 p A
IV
MGlas/
I4 t.p
&
W
Y
l
man
HD6nce
DVerrelli
AGibson -JStohr
J '1hoan
0 / /90
03/t/90 03/4/90
03//{/90 03/ 6 /90 03/
90
03/lg/90
f