ML20033F866
| ML20033F866 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 03/21/1990 |
| From: | Fairtile M Office of Nuclear Reactor Regulation |
| To: | Tremblay L VERMONT YANKEE NUCLEAR POWER CORP. |
| References | |
| GL-88-20, TAC-74484, NUDOCS 9004040002 | |
| Download: ML20033F866 (3) | |
Text
i
,N E
r2 l?a March 21, 1990 I
Docket No. 50 271 Mr. L. A. Tremblay 9
Licensing Engineer Vermont Yankee Nuclear Power Corporation 580 Main Street L
Bolton, Massachusetts 01740 1398 Dear Mr. Trembley-I i
i REVIEW 0F 60. DAY RESPONSE TO GENERIC LETTER 88 20,)
SUBJECT:
INDIVIDUAL PLANT EXAMINATIONS (IPE) (TAC NO. 74484 1
Re:-
Vermont Yankee Generic Letter 88 20 requires, in part, that each operating reactor licensee and construction permit holder: (1) identify the approach and method selected' forperformingtheIPE,(2)describethemethodtobeused,and(3) identify the schedule for performing the IPE and submitting the results to the NRC.
I This information was to be submitted to the NRC within 60 days of issuance of i
Supplement 1 of the generic letter.
1 We have reviewed your letter dated October 24, 1989, submitted in response to i
the reporting requirements of the generic letter. We conclude that your IPE.
approach, methodology and schedule are acceptable. We anticipate that any possible additional analysis or reporting requirements, such as those from external events or from the Containment Performance Improvement Program,_will i
not have any adverse effect on your schedule. However, if your schedule should change, please notify the NRC of the proposed change and the reason for the change.
j c
Should you have any questions concerning the requirements of the generic letter, please contact Mr. Michael L. Boyle, NRR at (301) 492 1308 or Mr. John H. Flack, RES at (301) 492-3979.
Sincerely, Morton D. Fairtile, Project Manger 9004o40002 90c321 Project Directorate I-3 PDR ADoCK 05000271 P
pdc Division of Reactor Projects I/II Office of Nuclear Reactor Regulation g
(c: See next page i
DISTRIBUT10NhDocketFile)NRC&LocalPDRs,SVarga,BBoger,ACRS(10),: POI.3/Irf.;
EJordan, MFairtile, MRushbrook, JJohnson,Rgn.I RWessman, MBoyle, JFlack
.....t...}.
...:...g/
- PDI-gDp..:............::............::............::.........
0F0 :PDI-3
- PDI-3 NAME.:MR) if)
- MBFair le :RWessman L......:............:............:............:............:............:.........
DATEL:3 90
- 3/2P/90
- 3h.D/90 UFFICIAL RE00RD CUPY
L l
m,
~'
Mr. l.
A. Tremblay Vermont Yankee cc:
Mr. J. Gary Weigand President & Chief Executive Officer Chairman Board of Selectman Vermont Yankee Nuclear Power Corp.
PostOffIceBox116 R.D. 5, Box 169 Vernon, Vermont 05354 Ferry Road Brattleboro, Vermont 05301 Mr. Raymond N. McCandless Vermont Division of Occupational Mr. John DeVincentis, Vice President and Radiological Health Yankee Atomic Electric Company Administration Building 580 Main Street Montpelier, Vermont 05602 Bolton, Massachusetts 01740-1398 Honorable John J. Easton New England Coalition on Nuc1 car Attorney General Pollution State of Vermont Hill and Dale Farm 109 State Street c
R.D. 2, Box 223 Montpelier, Vermont 05602 Putney, Vermont 05346 Vermont Public Interest Research Group, Inc.
43 State Street Montpelier, Vermont 05602 Diane Curran, Esq.
Regional Administrator, Region I Harmon, Curran & Tousley U.S. Nuclear ~ Regulatory Commission 2001 S Street, N.W., Suite 430 l
475 Allendale Road Washington, D.C.
20009 King of Prussia, Pennsylvania 19406 James Volz, Esq.
I R. K. Gad, III-Special Assistant Attorney General l
Repes & Gray Vermont Department of Public Service One International Place 120 State Street Boston, Massachusetts 02110 Montpelier, Vermont 05602 r
Mr. W. P. Hurphy, Vice President G. Dana Bisbee, Esq.
I and Manager of Operations Office of the Attorney General l
Vermont Yenkee Nuclear Power Corporation Environmental Protection Bureau R.D. 5, Box 169 State House Annex Ferry Road 25 Capitol Street Brattleboro, Vermont 05301 Concord, New Hampshire 03301-6397 Mr. George Sterzinger, Commissioner Atomic 3afety and Licensing Board Vernont Department of Public Service U.S. Nuclear Regulatory Commission 120 State Street, 3rd Floor Washington, D.C. 20555 Montpelier, Vermont 05602 Public Service Board State of-Vermont 120 State Street Montpelier, Vermont 05602
.s h
4 2,
Mr. L. A. Tremblay Vermont Yankee cc:
Mr. Gustave A. Linenberger,Jr.
Robert M. Lazo, Chairman Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U. S. Nuclear Regulatory Comission U.S. Nuclear Pegulatory Comission Washington, D.C. 20555 Washington, D.C.
20555 Frederick J. Shon Resident inspector Administrative Judge Vermont Yankee Nuclear Power Station Atomic Safety and Licensing Board U.S. Nuclear Regulatory Comission U. S. Nuclear Regulatory Comission P.O. Box 176 Washington, D.C. 20555 Vernon, Vermont 05354 Jerry Harbour John Traficonte Esq.
Administrative Judge ChiefSafetyUnIt Atomic Safety and Licensing Board Office of the Attorney General U. S. Nuclear Regulatory Comission One Ashburton Piece, 19th Floor Wc;hington, D.C. 20555 Boston, Massachusetts 02108 Geoffrey M. Huntington, Esquire Office of the Attorney General Environmental Protection Bureau State House Annex 25 Capitol Street Concord, New Hampshire 03301-6397 Cberles Bechhoefer, Esq.
Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Weshington, D.C.
20555 Dr. James H. Carpenter Administrative Judge Atomic Safety and Licensing Board lL U.S. Nuclear Regulatory Commission Washington, D.C.
20555 i
l Adjudicatory File (2) l:
Atomic Safety and Licensing Board i
Panel Docket U.S. Nuclear Regulatory Comission Washington, D.C. 20555
{
i l
1 1
l l
l
-