| ML20033E989 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/08/1990 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20033E990 | List: |
| References | |
| NUDOCS 9003150228 | |
| Download: ML20033E989 (4) | |
See also: IR 05000445/1989200
Text
y
-.
.-
-
-
.
.
a
~Mic
A
'
'o,
UNITED STATES
t
~
[.
4(f( &
. NUCLEAR REGULATORY COMMISSION'
t
u-
f
- WASHINGTON, D. C. 20656
%,s....f
j
t
4
March 8,1990
1 {
In Reply Refer To:
,
Dockets:l 50-445/89-200-
1
50-446/89-200
..
.
Mr. W. J. Cahill, Jr.
!
Executive Vice President
j
TV. Electric
E
400 North Olive Street, Lock Box 81
!
Dallas', Texas 75201
j
i
Dear Mr. Cahill:
.
SUBJECT: .NRC INSPECTION REPORT 50-445/89-200 AND 50-446/89-200 -
..
,
COMANCHE PEAK OPERATIONAL READINESS ASSESSMENT TEAM INSPECTION
.i
The enclosed inspection report describes the findings of the NRC Operational
,
. Readiness Assessment Team (ORAT.' inspection conducted during. the periods
.
. October 16 - 27, 1989 and January 22 - February 2,1990 involving activities
authorized by NRC Construction Pentits CPPR-126 and CPPR-127 for the Comanche
Peak Steam Electric Station, Units 1 and 2.
The inspection was conducted by.
members of the NRC Office of Nuclear Reactor Regulation, Regions III and IV,
^r
and NRC consultants.
.
-In the first portion of the ORAT inspection, the NRC inspection team reviewed
3
the programmatic; readiness of your facility and determined that the plant
r
construction was:not sufficiently complete to support a determination concern-
ing operational readiness. The interim findings of the inspection team were
i
discussed with you.and other members of your staff during the exit meeting on
0ctober 27, 1989, and were documented in a letter dated November 16, 1989
~
L
'(Attachment 1 of Enclosure 3).
t
'
In the final portion of the ORAT inspection, the inspection team completed its
assessment of your readiness to safely operate the Comanche Peak Steam Electric
i
Station;
This portion of the inspection focused on implementation of the
operational programs and the performance of your staff. The conclusions of the
inspection team were discussed with you and other members.of your-staff at the
l
end.of.the inspection on February 2,1990. The inspection team identified five
concerns which required resolution before fuel loading and-operation of the-
R,
-facility above'five-percent power.
In addition, there were several concerns
l-
- which required continued management attention to ensure their satisfactory
'
i-
completion. These concerns are detailed in the Executive Summary of the
"
enclosed inspection report.
"
The" positive findings in each functional area detailed in the report and the
-
relatively few open maintenance items were the result of continued imphasis on
r
L
construction completion and operational programs. Nevertheless, the-inspection
L
- team did find that certain of your activities were in violation of NRC require-
'
L
ments, as specified in the Notice of Violation, enclosed as Appendix A.
A
l.
9003150228 900308
ADOCKODOOg5
DR
/ tf(
q
V
.
_.
o
.
!
.o
Mr. W. J. Cahill, Jr.
2-
March 8. 1990
written response to these violations is required.
in addition, certain of your
activities appeared to deviate from commitments made to the NRC, as specified
in the enclosed Notice of Deviation (Appendix B). A written responsp to the
~
l
deviation is requested.
Subject to the resolution of the five specific concerns identified in the
Executive Summary of the enclosed inspection report, the inspection team
concluded that in the seven areas reviewed (i.e., facility management,
operations, maintenance, surveillance and testing, engineering and technical
support, power ascension test program, and quality verification) your staff had
demonstrated the ability to control activities and safely operate Comanche Peak
Steam Electric Station Unit 1 in accordance with NRC requirements.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this
letter and the enclosures noted below will be placed in the NRC Public Document
P,oom.
The responses directed by the accompanying Notices are not subject to the
l
clearance procedures of the Office of Management and Budget as required by the
1
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
l
1
Originni sigrod by8
ktdstoP sK)AN&kW
A
Dennis M. Crutchfield, Associate Director
for Specitl Projects
.
'
Office of Wuclaar Reactor Regulation
i
Enclosures:
,
1.
Appendix A - Notice of Violation
2.
Appendix B - Notice of Deviation
3.
Inspection Report 50-445/89-200;
50-446/89-200
l
cc w/ enclosures: See page 3
- see previous concurrence
RIV*
RIV*
RIV*
RIV*
Rill *
RSIB:DRIS*
TOMcKernon
JEBess
PEHarmon
WDJohnson
DCKosloff DLSolorio
03/02/90
03/02/90
03/02/90
03/02/90
03/02/90 03/02/90
RSIB:DR1S*
RSIB:DRI$*
SC:RSIB:DR1S* C:RSIB:DRIS* D:DR1S*
MV C5VD
JRBall
CAVanDenburgh SCGuthrie
WDLanning
BKGrimes RFWarnic
03/02/90
03/02/90
03/05/40
03/06/90
03/06/90.03/4/90
CG
MC
03/k/90
03/$/90
l
1
-
-
.
__
r
,
f
,\\.
I
! .-
!
i
,
Mr.' W. J. Cehill, Jr.
-3-
March 8, 1990
l
I
cc w/ enclosure:
Roger D. Walker
TU Electric
,
- I
Nanager, huclear Licensing
c/o Bethesda Licensing
TU Electric
3 Metro Center, Suite 610
Skyway Tower
Bethesda, MD 20814
400 North Olive Street, Lock Box 81
Dellas, TX 75201
E. F. Ottney
l
P.O. Box 1777
' -
Juanita Ellis
Glen Rose, TX 76043
i
i
President - CASE
1426 South Folk Street
Jack R. Newman
Dalles, TX 75224
Newman & Holtzinger
)
1615 L Street, NW
Texas Radiation Control
Suite 1000
Program Director
Washington, DC 20036
Texas Department of Health
'1100 West 49th Street
George R. Bynog
Austin, TX 78756
Program Mgr./ Chief Inspector
Texas Dept. of Labor & Standards
GDS Associates. Inc.
Boiler Division
i
1850 Parkway Place, Suite 720
P.O. Box 12157 Capitol Station
l
Ferietta, GA 30067-8237
Austin, TX 78711
Honorable George Crump
William D. Johnson SP.I
tounty Judge
Comanche reak NPS
l
Glen Rost, Tens
76043
U,S. Nu';1er Rrgulatory Connission
'
P.O. t,e 1029
.
M . Billie Pi mer Garce,1.Esq.
GN nbury, TK 76048
Robinson, Robinson, et c.
1
103 East College Avenue
Appleton, WI 549H
3
Regional Aoministrator, Region IV
-
U S. Udclear Regulatory Commission
'
611 Ryan Plaza Drive, Suite 1000
Aritngton, TX 76011
William A. Burchette Esq.
CounselforTex-LaElectric
Cooperative of Texas
Heron. Burchette, Ruckert & Rathwell
1025 Thomas Jefferson St., NW
Washington, DC 20007
.
'.'
l
'
.
.
l
.
__
o
..
Mr. W. J. Cahill, Jr.
-4
March 8, 1990
s
Distribution:
OR W TTTE: 5044s/4463
-
.
g3;g gjp
-
-
-
.
{
,
.
DRIS R/F
'
'
ADSP R/T
CPPD R/T
CPPD Site Reading
BKGrimes, NRR
GClaines, NRR
WDLanning, NRR
b-
SCGuthrie, NRR
CAVanDenburgh, NRR
JGPartlw, NRR
,
DHCrutchfit1d, NRR
CIGrimes, NRR
JWilson, NRR
JElyons, NRR
MMalloy, NRR
MBFields, NRR
TRQuay,NRR
ELJordan, Aron
RI.Spess6rd,AECO
'
Jt: Moore. 000
4
.BEHayes, 01
LAShu , ARM /Lrga
'
RFWarnick
>
JSWiebe
H}llivarepre
MIS System, RIV
i
RSTS Open, tor, Rly
RPD,ElV
RIV Docket file
'i
JTGilliland, RIV
Regional Administrators
-
Regional Division Directors
Inspection Team
4
LPDR
ACRS(3)
OGC(3)
IS Distribution
l
l
.
-
$
1
. - - .
.
. .