Forwards Operational Readiness Assessment Team Insp Repts 50-445/89-200 & 50-446/89-200 on 891016-27 & 900122-0202 & Notices of Violation & Deviation
ML20033E989
Person / Time
Site: Comanche Peak  
Issue date: 03/08/1990
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20033E990 List:
References
NUDOCS 9003150228
Download: ML20033E989 (4)


See also: IR 05000445/1989200

Text

y

-.

.-

-

-

.

.

a

~Mic

A

'

'o,

UNITED STATES

t

~

[.

4(f( &

. NUCLEAR REGULATORY COMMISSION'

t

u-

f

- WASHINGTON, D. C. 20656

%,s....f

j

t

4

March 8,1990

1 {

In Reply Refer To:

,

Dockets:l 50-445/89-200-

1

50-446/89-200

..

.

Mr. W. J. Cahill, Jr.

!

Executive Vice President

j

TV. Electric

E

400 North Olive Street, Lock Box 81

!

Dallas', Texas 75201

j

i

Dear Mr. Cahill:

.

SUBJECT: .NRC INSPECTION REPORT 50-445/89-200 AND 50-446/89-200 -

..

,

COMANCHE PEAK OPERATIONAL READINESS ASSESSMENT TEAM INSPECTION

.i

The enclosed inspection report describes the findings of the NRC Operational

,

. Readiness Assessment Team (ORAT.' inspection conducted during. the periods

.

. October 16 - 27, 1989 and January 22 - February 2,1990 involving activities

authorized by NRC Construction Pentits CPPR-126 and CPPR-127 for the Comanche

Peak Steam Electric Station, Units 1 and 2.

The inspection was conducted by.

members of the NRC Office of Nuclear Reactor Regulation, Regions III and IV,

^r

and NRC consultants.

.

-In the first portion of the ORAT inspection, the NRC inspection team reviewed

3

the programmatic; readiness of your facility and determined that the plant

r

construction was:not sufficiently complete to support a determination concern-

ing operational readiness. The interim findings of the inspection team were

i

discussed with you.and other members of your staff during the exit meeting on

0ctober 27, 1989, and were documented in a letter dated November 16, 1989

~

L

'(Attachment 1 of Enclosure 3).

t

'

In the final portion of the ORAT inspection, the inspection team completed its

assessment of your readiness to safely operate the Comanche Peak Steam Electric

i

Station;

This portion of the inspection focused on implementation of the

operational programs and the performance of your staff. The conclusions of the

inspection team were discussed with you and other members.of your-staff at the

l

end.of.the inspection on February 2,1990. The inspection team identified five

concerns which required resolution before fuel loading and-operation of the-

R,

-facility above'five-percent power.

In addition, there were several concerns

l-

- which required continued management attention to ensure their satisfactory

'

i-

completion. These concerns are detailed in the Executive Summary of the

"

enclosed inspection report.

"

The" positive findings in each functional area detailed in the report and the

-

relatively few open maintenance items were the result of continued imphasis on

r

L

construction completion and operational programs. Nevertheless, the-inspection

L

- team did find that certain of your activities were in violation of NRC require-

'

L

ments, as specified in the Notice of Violation, enclosed as Appendix A.

A

l.

9003150228 900308

ADOCKODOOg5

DR

/ tf(

q

V

.

_.

o

.

!

.o

Mr. W. J. Cahill, Jr.

2-

March 8. 1990

written response to these violations is required.

in addition, certain of your

activities appeared to deviate from commitments made to the NRC, as specified

in the enclosed Notice of Deviation (Appendix B). A written responsp to the

~

l

deviation is requested.

Subject to the resolution of the five specific concerns identified in the

Executive Summary of the enclosed inspection report, the inspection team

concluded that in the seven areas reviewed (i.e., facility management,

operations, maintenance, surveillance and testing, engineering and technical

support, power ascension test program, and quality verification) your staff had

demonstrated the ability to control activities and safely operate Comanche Peak

Steam Electric Station Unit 1 in accordance with NRC requirements.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this

letter and the enclosures noted below will be placed in the NRC Public Document

P,oom.

The responses directed by the accompanying Notices are not subject to the

l

clearance procedures of the Office of Management and Budget as required by the

1

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

l

Sip:erely,

1

Originni sigrod by8

ktdstoP sK)AN&kW

A

Dennis M. Crutchfield, Associate Director

for Specitl Projects

.

'

Office of Wuclaar Reactor Regulation

i

Enclosures:

,

1.

Appendix A - Notice of Violation

2.

Appendix B - Notice of Deviation

3.

Inspection Report 50-445/89-200;

50-446/89-200

l

cc w/ enclosures: See page 3

  • see previous concurrence

RIV*

RIV*

RIV*

RIV*

Rill *

RSIB:DRIS*

TOMcKernon

JEBess

PEHarmon

WDJohnson

DCKosloff DLSolorio

03/02/90

03/02/90

03/02/90

03/02/90

03/02/90 03/02/90

RSIB:DR1S*

RSIB:DRI$*

SC:RSIB:DR1S* C:RSIB:DRIS* D:DR1S*

MV C5VD

JRBall

CAVanDenburgh SCGuthrie

WDLanning

BKGrimes RFWarnic

03/02/90

03/02/90

03/05/40

03/06/90

03/06/90.03/4/90

CG

MC

03/k/90

03/$/90

l

1

-

-

.

__

r

,

f

,\\.

I

! .-

!

i

,

Mr.' W. J. Cehill, Jr.

-3-

March 8, 1990

l

I

cc w/ enclosure:

Roger D. Walker

TU Electric

,

  • I

Nanager, huclear Licensing

c/o Bethesda Licensing

TU Electric

3 Metro Center, Suite 610

Skyway Tower

Bethesda, MD 20814

400 North Olive Street, Lock Box 81

Dellas, TX 75201

E. F. Ottney

l

P.O. Box 1777

' -

Juanita Ellis

Glen Rose, TX 76043

i

i

President - CASE

1426 South Folk Street

Jack R. Newman

Dalles, TX 75224

Newman & Holtzinger

)

1615 L Street, NW

Texas Radiation Control

Suite 1000

Program Director

Washington, DC 20036

Texas Department of Health

'1100 West 49th Street

George R. Bynog

Austin, TX 78756

Program Mgr./ Chief Inspector

Texas Dept. of Labor & Standards

GDS Associates. Inc.

Boiler Division

i

1850 Parkway Place, Suite 720

P.O. Box 12157 Capitol Station

l

Ferietta, GA 30067-8237

Austin, TX 78711

Honorable George Crump

William D. Johnson SP.I

tounty Judge

Comanche reak NPS

l

Glen Rost, Tens

76043

U,S. Nu';1er Rrgulatory Connission

'

P.O. t,e 1029

.

M . Billie Pi mer Garce,1.Esq.

GN nbury, TK 76048

Robinson, Robinson, et c.

1

103 East College Avenue

Appleton, WI 549H

3

Regional Aoministrator, Region IV

-

U S. Udclear Regulatory Commission

'

611 Ryan Plaza Drive, Suite 1000

Aritngton, TX 76011

William A. Burchette Esq.

CounselforTex-LaElectric

Cooperative of Texas

Heron. Burchette, Ruckert & Rathwell

1025 Thomas Jefferson St., NW

Washington, DC 20007

.

'.'

l

'

.

.

l

.

__

o

..

Mr. W. J. Cahill, Jr.

-4

March 8, 1990

s

Distribution:

OR W TTTE: 5044s/4463

-

.

g3;g gjp

-

-

-

.

{

,

.

DRIS R/F

'

'

ADSP R/T

CPPD R/T

CPPD Site Reading

BKGrimes, NRR

GClaines, NRR

WDLanning, NRR

b-

SCGuthrie, NRR

CAVanDenburgh, NRR

JGPartlw, NRR

,

DHCrutchfit1d, NRR

CIGrimes, NRR

JWilson, NRR

JElyons, NRR

MMalloy, NRR

MBFields, NRR

TRQuay,NRR

ELJordan, Aron

RI.Spess6rd,AECO

'

Jt: Moore. 000

4

.BEHayes, 01

LAShu , ARM /Lrga

'

RFWarnick

>

JSWiebe

H}llivarepre

MIS System, RIV

i

RSTS Open, tor, Rly

RPD,ElV

RIV Docket file

'i

JTGilliland, RIV

Regional Administrators

-

Regional Division Directors

Inspection Team

PDR

4

LPDR

ACRS(3)

OGC(3)

IS Distribution

l

l

.

-

$

1

. - - .

.

. .