.5 i
APPENDIX B I
i NOTICE OF DEVIATION TV Electric Docket: 50-445/89{200 Comanche Peak Steam Electric Station, Permit:
CPPR-126 -
Unit 1 Glen Rose, TX I
The following deviation was identified during an NRC_ inspection conducted on January 22, 1990 through February 2,1990.
The Comanche Peak Steam Electric Station (CPSES) Final Safety Analysis Report (FSAR) discusses the CPSES comitments on regulatory guides for the nuclear steam supply system and balance of plant design, construction, startup, and Regulatory Guide (ppendix 1A(N) refers to Appendix 1A(B) for compliance with operation.
FSAR A RG)1.33. Appendix 1A(B) states that the quality assurance requirements of RG 1.33 will be implemented per the provisions of ANSI N18.7-1976, and that CPSES is in compliance with RG 1.33 (revision 2).
In addition, FSAR Table 17.2-2, " Regulatory Guides end Industry Standards," states that the CPSES quality assurance program is consistent with the guidance of RG 1.33, and that CPSES comits to comply with the respective regult. tory positionsasdiscussedinFSAkAppendixIA(B).
KG 1.33 (revision 2), Appendix A, sectior. 3.5.2, indicater, that the onsite u and de systems should be controlled by written procedures and states that procedures are required for energizing, startup, shutdown, and changing nodes of these systems, p,-
Contrary to the above, as of January 31, 1990, written procedures did not exist i
for energi ing and changing the modes of operation for portions of the 118-V ac and 125-V dc distribution systems. Specifically, procedures were not provided for alignment of the low-voltage circuit breakers or for the verification of the size and type of control power fuses for safety-related equipment.
Thisisadeviationfromcommitments(445/89200-D-06).
Please provide to the U.S. Nuclear Regulatory Comission ATTN: Document Control Desk, Washington, DC 20555, with a copy to the Office of Nuclear Reactor Regulation, Comanche Peak Project Division, Inspection Programs, in writing within 30 days of the date of this Notice, the reason for the devia-tion, the corrective steps which have been taken and the results achieved, the 9003150234 900308 PDR ADOCK 05000445, G
PNU 1
corrective steps which will be taken to avoid further deviations, and the date l
when your corrective action will be completed. Where good cause is shown, consideration will be given to extending the response time.
FOR THE NUCLEAR REGULATORY COMglSSION C..L.
x.1. s y Dennis M. Crutchfield, Associate Director for Special Projects Office of Nuclear Reactor Reguistion Dated at Rockville, Maryland this 8th day of March 1990.