r 10CFR50.54(q) 4 -
gm c:rgon. a. cine a o.. c:mp:ny-
- g. s pr.oham enk n vie SC 29035 Nuclotr Operations SCE&G ASCRA14 :str(ag March 2, 1990 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Radiation' Emergency Plan Submittal Revision 26 Gentlemen:
In compliance with 10CFR50.54(q), South Carolina Electric & Gas Company (SCE&G), acting for itself and as agent for South Carolina Public Service Authority, submits one copy of Revision 26 to the Radiation Emergency Plan.
The Radiation Emergency Plan is provided in its entirety for insertion into your binder. That portion which was not revised was retyped and is included in this package.
A summary of the changes by page number is enclosed.
Please note two of the changes: Table 4-1 was revised in format and Detection Method wording. Some of the Detection Methods were expanded or changed to provide more definitive information to aid emergency response personnel in classifying emergencies.
Table 5-1 was revised because some personnel filling the Core Expertise position cannot respond to the plant in thirty (30) minutes. To properly meet the Core Expertise requirements, the Shift Engineer will assume those responsibilities until the duty Core Expertise individual arrives.
The changes in Revision 26 were reviewed in accordance with 10CFR50.54(q) and were found not to decrease the effectiveness of the Radiation Emergency Plan.
If you have any questions, please contact us at your convenience.
Very truly yours, O. S. Bradham DWF/0SB: led Attachment c:
(w/o attachments)
D. A. Nauman/0. W. Dixon, Jr./T. C. Nichols, Jr.
E. C. Roberts K. E. Nodland R. V. Tanner J. C. Snelson S. D. Ebneter (w/2 attachments)
R. L. Prevatte f
J. J. Hayes, Jr.
J. B. Knotts, Jr.
g[g General Managers NPCF C. A. Price NSRC R. B. Clary RTS (EMP900006) k (k K. E. Beale File (810.10-1) 9003090476 900302 r"-
fDR ADOCK 05000395i PNU
RADIATION EMERGENCY PLAN EP-100 REVISION 26 Page Section Change Expanded Table of Contents to cover all sections.
1 1.1.1 Change definition title from " Access Control Assembly i
Area" to "RCA Control Point".
This is the correct name of this area.
2 1.1.5 Wording change.
Clarification only.
2 1.1.8 Defined Exclusion Area as one mile radius.
3 1.1.14 Wording change.
Clarification only.
3
-l.1.16 Defined Offsite as area outside one mile from Reactor Building.
4 1.1.18 Defined Onsite as area inside one mile from Reactor Building.
5 1.1.25 Added " dependent upon its intended function".
6 2.0 Wording change.
Clarification only.
8 2.4.1 Typo 12 Moved heading.
14 Moved heading 16 Moved heading 17 Moved heading j
21 Removed Management Duty Supervisor.
26 Changed "may" to "shall".
i 27-45 Changed some Detection Methods to provide more definitive 1
information for classifying emergencies.
47 5.1 Organizational change.
52 5.2.6 Organizational change.
54 5.2.9.1 Changed " continuous monit.oring" to "as directed".
1 57 5.3.4 Organizational change.
63 5.5.1 Combined initial and follow-up messages.
64 5.5.2 Wording change.
Clarification only.
65 5.5.2 Wording change.
Clarification only.
66 5.5.3 Wording change.
Clarification only.
66 5.5.4 Wording change.
Clarification only.
67 5.5.4 Wording change.
Clarification only.
67 5.5.5 Wording change.
Clarification only.
68 5.5.5 Wording change.
Clarification only.
69 5.5.6 Wording change.
Clarification only, j
i _
Page Section Change 70 5.6.3 Wording change.
Clarification only.
71 5.7 Wording-change.
Clarification only.
72 Change 30 minute Radiochemist to on-shift.
Change Core Expertise 30-minute response to "**May be provided by shift personnel assigned other functions".
Removed "(***)
Not required in modes 5 and 6" for Shift Engineers.
Change " Manager, Corporate Health Physics and Environmental Program" to " Associate Manager, Health Physics. (See explanation at end of list) 75 Add " Number
" to top of form.
79 Organizational change.
80 Organizational change.
81 Organizational change.
90 6.4.2.b (same as page 1 section 1.1.1) 92 6.5.2 Wording change.
102 7.1.1 Removed " Unit 1".
106 7.5.1.3 Changed to " General Telephone Company".
106 7.5.1.4 Wording change.
Classification only.
121 7.7 Removed "re " from recirculated.
122 7.8 Wording change.
131 Changed to better quality map.
132 Changed to better quality map.
133 Changed to better quality map.
134 8.1.1 Changed " scheduled safety meetings" to " scheduled training sessions".
135 8.1.1.b Added "to personnel responsible for the radiological protection program".
136 8.1.1.d Added section describing local physician training.
137 8.1.1.e Organizational change.
139 8.1.1.j Changed to " Emergency Services Personnel".
140 8.1.2 Organizational change.
141 Added " Communications Drills".
142 Wording change.
Clarification only.
144 Organizational change.
147 Removed " Shift Supervisor".
He receives detailed training in the Licensed Operator Training program.
148 Changed " Appropriate Supervisor, Operators, Health Physics Personnel to " Designated Operators".
Removed 3 year certification.
149 Changed " invited to" to "provided".
Added " commensurate with their responsibilities".
e 3
Page Section Change 150 9.0 Wording change.
Clarification only.
151 Wording change.
Clarification only.
152 Wording change.
Clarification only.
153 Organizational changes.
13A.A-1 Added EPP-001.1, EPP-001.2, EPP-001.3, and EPP-001.4 Explanation for chances on pace 72 Personnel currently filling the Core Expertise position do not live within a distance of the plant to allow a 30-minute response time.
The Shift Engineer function is manned on a continuous basis and will provide coverage for the Core Expertise responsibilities until the duty Core Expertise individual arrives (normally 45 minutes from the time of being summoned).
The Shift Engineers receive training on mitigating core damage and monitoring of critical functions status during their continuing training programs and are qualified to perform the function of Core Expertise.
The initial offsite dose assessment should be performed by a member of the TSC staff-responsible for radiological protection and having monitoring personnel on hand to perform out-of-plant measurements.
Therefore, the Associate Manager, Health Physics is assigned this function.
Summary This revision has been reviewed in accordance with 10CFR50.54(q) and found not to decrease the effectiveness of the Radiation Emergency Plan.