Text
-
e.,,
i d
4 q
- . m.
f,j 3
Ik MAY 2 61989 s.
Docket Nos. 50-293 -
J
.1 Mr. Steven J iSweeney j
Chairman.-Board of Directors-j u
and Chief Executive Officer
.-i
-Boston-Edison Company k
' 25 Braintree Hill Park-j
- Braintree, Massachusetts 02184 1
Dear'Mr.-Sweeney:
1
- On May 17 and 38,.1989,'NRC' senior managers met to review the performance of.
1 operating nuclear power plants. licensed by the NRC. These meetings are con-ducted biannually to focus NRC. resources co those plants.and issues of greatest-safety significance The NRC notes that Pilgrim, which was previously cate-1
_.porizedasrequirinhsubstantial-. improvement,hasbeensuccessfullyrestarted-j and_ operational performance.to date has been generally satisfactory. With.
this improvement, Pilgrim is~now categorized as requiring-close monitoring.
y Plants in this-category continue to receive increased NRC attention from both
' headquarters and the regional office.
t A summary of NRC discussions held relating to Pilgrim is provided below:
4
- The licensee was authorized on December 30, 1988, to start Up the plant and-
' operate up to 5% power.; Testing through 5% power was completed on:
2
~'
February 16, 1989.. Equipment problems, which delayed testing, were handled s
1 well. Operations up to 5%' power-were performed safely and.in a conservative manner.- On March 3 1989,-the licensee'was authorized to operate at power
-levelsupto25Lfullpower.
4 1
Hardware failures and personnel errors during operation in the 5-25% range were discussed. The Reactor Core Isolation Cooling overpressure event of had multipic' personnel performance,causes and was the subject April 12,1989, of an Augmented Inspection Team review.--Concern was expressed., based upon the April 12, 1989 event, that some plant employees had not followed establish'ed administrative procedures.
It was noted that the licensee took strong corrective action as a result. The May-3, 1989 automatic.
- reactor shutdown was caused by inappropriately controlled troubleshooting g
.on'a feedwater regulating valve and was complicated by a partial Contain-j
+
ment Isolation System activation resulting from voltage transients which J
occurred after the. trip. These events occurred after the licensee had reduced its augmented management oversight on-shift. Licensee response, l
root cause analysis, and followup to the events were exceptionally good and demonstrated management's ability to perform indepth analysis of Nonetheless, the staff is concerned that these events may problems.
indicate that oversight of operations activities by the licensee should be augmented until sustained improved performance is realized.
~
S A
.-[#/O-XA-O. '03 g 2J w
1
y J '] '
l 4
~
k Mr. Sweeney-
-2 l
An NRC Comission meeting open to the public has been scheduled for June 1 1989, to review the results of the latest meeting of.NRC managers. Mr. William
. Russell, the Region 1 Administrator, has discussed the basis for our conclusions with regard'to the Pilgrim facility with members of your. staff.
If you have any questions regarding this matter, do not hesitate to call me.
-t Sincerely.
Original signed by
. Victor Stello, Jr.
e Victor Stello, Jr.
i Executive Director-for Operations; cc: ' See next page DISTRIBUTION Docket File i
-.V. Stello, EDO
).
J. Taylor, DEDR H. Thompson, DEDS-J. Blaha,'A0/0ED0
-T. Martin, ODEDR-T. Murley,.NRR J..Partlow, NRR
'D;-Mcdonald, NRR q
D
.EDO r/f DEDR r/f.
'GPA/CA GPA/PA Document:
LTR 1
.DF C-
- DDEDR
- EDO G.....:.D D E D R p ::.D E D R N AME :HBCla ton:em : T 0 Martin
- JM Taylor
- Y Stello DATE :5/26/89
- 5/26/89
- 5/26/89
- 5/26/89
- , =
- - [;.
' Mr. ' Sweene'y -
t cc:-
Mr. K. L. Highfill Mr. Ralph G.' Bird Senior Vice President ~- Nuclear' Station Director Boston Edison Company Pilgrim Nuclear Power Station Pilgrim Nuclear Power S*tation RFD #1 Rocky Hill Road Plymouth, Massachusetts 02360 RFDf1, Rocky Hill Road Plymouth Massachusetts 02360 Mr. Richard N. Swanson, Manager Resident Inspector's Office
. U. S. Nuclear Regulatory Commission Nuclear Engineering Department Boston Edison Company c
Post Office Box 867 25 Braintree Hill Park
. 02184 i
~
Plymouth, Massachusetts 02360 Braintree, Massachusetts
- Chairman, Board of Selectmen.
Ms. Elaine D. Robinson 11 Lincoln Street Nuclear Information Manager Plymouth', Massachusetts 02360 Pilgrim Nuclear Power Station Office of the Commissioner RFD fl Rocky Hill Road Massachusetts. Department-of Plymouth, Massachusetts- 02360 1
Environmental Quality Engineering Charles V. Barry One Winter Street.
Secretary of Public Safety -
Boston, Massachusetts. 02108 Executive Office of Public Safety-Office of the Attorney General One Ashburton Place Boston, Massachusetts 02108 One Ashburton Place
-20th Floor Boston, Massachusetts 02108 q
Mr. Robert.M. Hallisey. Director Radiation Control' Program-
-Massachusetts Department of Public Health l
150-Tremont Street, 2nd Floor l
Boston, Massachusetts 02111-Regional Administrator, Region I U. S.. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. James D. Keyes 4
l Regulatory Affairs and Programs Group L
. Leader
. Boston Edison Company 25 Braintree Hill Park Braintree, Massachusetts 02184 t
L 2
.