Mississippi Power and Light Company
1
$
I
D
7
M ua,EC 7 IO8Ao
ATTN:
Mr. N. L. Stampley
Vice President of Production
N1Qn:wr
P. O. Box 1640
g
Jackson, MS 39205
Gentlemen:
/g ; A
Subject: Report Nos. 50-416/81-48 and 50-417/81-21
This refers to the special safety inspection conducted by Mr. W. H. Miller, Jr. ,
of this of fice on October 20-23, 1981, of activities authorized by NRC Construc-
tion Permit Nos. CPPR-118 and CPPR-119 for the Grand Gulf facility and to the
discussion of our findings held with Mr. H. Morgan, Construction Superintendent,
at the conclusion of the inspection.
Areas examined during the inspection and out findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations', a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this of fice
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such infor-
,
mation.
If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so
that a ,ew due data may be established. Consistent with section 2.790(b)(1),
such application must be accompanied by an af fidavit executed by the owner o# the
information which identifies the document or part thereof sought to be withhrId,
and a full statement of the reasons on the basis of 'vhich it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
hoffffjS
.
ey
1~G'ol 9'
.
_
.
.
.
Mississippi Power and Light Company
2
10 CFR 2.790(b)(4). - The information sought to be withheld shall be incorporated
-as far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we wil? be glad to discuss
them with you.
Sincerely,
M
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
l,
Enclosure:
Inspection Report Nos. .50-416/81-48
and 50-417/81-21
4
cc w/ encl:
D. C. Gibbs, Vice President
Middle South Energy, Inc.
C. K. McCoy, Plant Manager
bec w/ encl:
NRC Resident Inspector
e
Document Management Branch
State of Mississippi
RII
RII
RII
RII
RII
RI
/A)/
OW
WHMiller:ht
T onion
IEMurphy
/*
ski
PTaylor
wis
1$/y/81
1$/g/81
1)/y/81
P1
1
16/4 /81
1l/g/81
i
!
- - - -
- - -
.
.
.
.
.
.
. -
-
- - - . .
.