Forwards IE Insp Repts 50-369/81-23 & 50-370/81-11 on 810715-0915 & Notice of Violation
ML20033D195
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 10/23/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20033D190 List:
References
NUDOCS 8112070354
Download: ML20033D195 (2)


See also: IR 05000369/1981023

Text

-

y. ' ,

'

.

0CT2 3193g

Duke Power Company

ATTH: Mr. W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

Subject:

Report Nos.g-3kand 50-370/81-11

This refers to the routine safety inspection conducted by Ms. M. J. G ahr of

this office on July 15 - September 15, 1981, of activities authorized by NRC

Operating License No. NPF-9 and Construction Permit No. CPPR-84 for the

McGuire Nuclear facility. Our preliminary findings were discussed with

Mr. ft. D. itcIntosh, Plant Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observatiuns by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

-

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

'

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from dis-

~ losure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this office

c

byctelephone within ten days from the date of this letter of your intention to

fine a request for withholding; and (b) submit within twenty-five days from the

date of this letter a written application to this office to withhold'such infor-

ma tion.

If.your receipt of this letter has been delayed such that less than

seven days are available for your review, please notify this office promptly

so that a new due date may be established.

Consistent with section 2.790(b)(1)

such application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part thereof sought to be wi'

held, and a full statement of the reasons on the basis of which it is claimed

that the information should be withheld from public disclosure. This section

further requires the statement to address with specificity the considerations

listed in 10 CFR 2.790(b)f4).

The infonnation sought to be withheld shall be

incorporated as far. as possible into a separate part of the affidavit.

If we do

not hear from you in this. regard within the specified periods noted above, the

report will~ be placed in the Public Document Room.-

8112070354 811293

PDR ADOCK OS000M9

0

PDR

-.

_

.

.

'.

.

.

,.

Duke Power Company

2

0CT 2 31981

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/s/

Paul J. Kellogg, Chief

-

Reactor Projects Branch 2,

,

!

Division of Resident and

Reactor Project Inspection

,

Enclosure:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-369/81-23

!

and 50-380/81-11

l

cc w/ encl:

!

11. D. ficIntosh, Plant Manager

J. T. tioore, Project Manager

bcc w/ encl:

NRC Resident Inspector

Document 11anagement Branch

State of North Carolina

!

I

!

.

RII .

RI'-

RII

.

RII-

Alg[t

'

-

F$)

  • dt

.

nt

is

lPKe ogg

10//)/81:

10/J.3/81--

10/Ja/81

10/g81

.

.

.

.