y. ' ,
'
.
0CT2 3193g
Duke Power Company
ATTH: Mr. W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
Subject:
Report Nos.g-3kand 50-370/81-11
This refers to the routine safety inspection conducted by Ms. M. J. G ahr of
this office on July 15 - September 15, 1981, of activities authorized by NRC
Operating License No. NPF-9 and Construction Permit No. CPPR-84 for the
McGuire Nuclear facility. Our preliminary findings were discussed with
Mr. ft. D. itcIntosh, Plant Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observatiuns by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
-
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
'
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis-
~ losure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this office
c
byctelephone within ten days from the date of this letter of your intention to
fine a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold'such infor-
ma tion.
If.your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly
so that a new due date may be established.
Consistent with section 2.790(b)(1)
such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part thereof sought to be wi'
held, and a full statement of the reasons on the basis of which it is claimed
that the information should be withheld from public disclosure. This section
further requires the statement to address with specificity the considerations
listed in 10 CFR 2.790(b)f4).
The infonnation sought to be withheld shall be
incorporated as far. as possible into a separate part of the affidavit.
If we do
not hear from you in this. regard within the specified periods noted above, the
report will~ be placed in the Public Document Room.-
8112070354 811293
PDR ADOCK OS000M9
0
-.
_
.
.
'.
.
.
,.
Duke Power Company
2
0CT 2 31981
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/s/
Paul J. Kellogg, Chief
-
Reactor Projects Branch 2,
,
!
Division of Resident and
Reactor Project Inspection
,
Enclosure:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-369/81-23
!
and 50-380/81-11
l
cc w/ encl:
!
11. D. ficIntosh, Plant Manager
J. T. tioore, Project Manager
bcc w/ encl:
NRC Resident Inspector
Document 11anagement Branch
State of North Carolina
!
I
!
.
RII .
RI'-
RII
.
RII-
Alg[t
'
-
F$)
- dt
.
nt
is
lPKe ogg
10//)/81:
10/J.3/81--
10/Ja/81
10/g81
.
.
.
.