ML20033C369
| ML20033C369 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 11/10/1981 |
| From: | Ippolito T Office of Nuclear Reactor Regulation |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 8112030050 | |
| Download: ML20033C369 (4) | |
Text
e r
/
NOVEMBER ' 0 1!Bf Docket Hos. 50-325
' ' ' O, /,%
50-324
\\
9
7^?Q
,4:
s C,
8~
f y
1
\\'
/
~q Mr. J. A..lones Senior Executive Vice President 7,
9 Carolina Power & Light Company LA
>Q p/
9 336 Fayetteville Street Raleigh, North Carolina 27602 o)
Dear Mr. Jones;
}
SUBJECT:
APPENDIX B TECHNICAL SPECIFICATIONS - NOBLE GAS RELEASES RE: BRUNSWICK STEAM ELECTRIC PLANT UNIT N05.1 AND 2 Your letter dated October 30, 1981 provided an assessment of noble gas releases from your facility with respect to the average annual release rate limit cited in Appendix B Technical Specifications. _You project that noble gas releases could reach 100% of-the existing. limit within 8-10 weeks; and 170% of the existing limit by June.1982; Neverth41ess, you have balculated and assert that the maximum air dose due to gama radiation in the sector with the most restrictive atmospheric dispersion factors for the period ending June 1982 will not exceed the appropriate numerical design objective of 10 CFR 50, Appendix I, as given in Section 2,5 of Appendix B Technical Specifications. You further project that no Appendix B Tebhnical Specification limits for other effluents will be exceeded.
As you know, the release rate limits in question were revised in 1979 to limit the annual gaseous release to the Appendix I numerical design objectives.
This was done to provide reasonable assurances of meeting design objectives during the interim period until the Augmented Offgas Systems (A0Gs) became operational. At the time the release rate limits were revised, the facility's airborne release history indicated that the revised limits could be met without an operable A0G. License conditions have subsequently been added to the facility operating licenses requiring installation of operable A0Gs by May 1983 for Unit No.1 and December 1983 for Unit No. 2.
f A revision to the methodology used for monitoring annual noble gas releases i
from the facility may be appropriate. Such a revision would reflect current methodology and would consider accumulated facility meteorological and effluent historical data. The revised methodology would still be based upon Appendix i j
design objectives. Upon receipt of the information requested in the enclosure to this letter we will develop and forward to you model technical specifications 0112030050 811110 l
PDR ADOCK 05000324 l
P pg i
omcap sun-s )
one>
NHC Tonu 313 pupnCM em OFFIClAL RECORD COPY-usa m,-
1 e
w.7
-:ct V,
Mr. J. A. Jones that reflect the revised methodology and that inclue definitive action statements.
OMB clearance is not required for this request since it is being transmitted to nine or fewer addresses.
Sincerely.
Tnm/,3 nTermyyr 0
Thomas A. Ippolito, Chief Operating Reactors Branch #2 Division of Licensing Enclosure As stated cc: See next page DISTRIBUTION:
Docket File NRC PDR Local pDR ORB #2 Rdg.
D. Eisenhut J. Heltemes, AE00 T. Ippolito S. Norris J. Van Vliet OELD I&E (3)
WEKieger WPGamill r
1 I
l 4
i r4
(. A6... [y......R..A.. l.b.....
a \\ /.
ORB #2w).
ORB #2 0
w nes>
Van VI t
Nctris
./..t en Ip i
.Pr.o.mi.n...... E.Cc.w4. f.....
suanear )
...u g.z.8.1.......w..G8.1..... uuaa1.......u.z&.za..9/.la... 3)..
.,s >
sc ronu aia ow) ecu we OFFiClAL RECORD COPY usam mi-mm
~.
p*
Mr.-J. A. Jones
- cc:
Richard E. Jones, Esquire :
Carolina Power & Light Company 336 Fayetteville Street Raleigh, North Carolina ~27602 George F. Trowbridge, Esquire Shaw, Pittman, Potts & Trowbridge 1800 M Street, N. W.
4
- Washington, D. C.
20036 Resident Inspector U. S.. Nuclear Reguia. tory Convaission P. O. Box 1D57 Southport, North Carolina 28461 Southport -- Brunswick County Library 109 W. Moore Street Southport, North Carolina 28461
~
Mr. Charles R'. Dietz
' Plant Manager '
P. O. Box.458 Southport, North Carolina 28461 4
e 4
e e
9 O
y I
e 6
e 4
V
. 2h3 ny :
'~
~
.[-
~
- REQUEST FOR INFORMATI0 REGARDING APPENDIX B TECHNICAL SPECIFICATIONS
~..
NOBLE GAS RELEASES BSEP UNIT NOS. 1 AND 2
.-l.
P[ ovide the projected release rate of each noble gas by month for ths.
. next two.(2) years.
y--
0 I
I e
t 9
0 e
6+[-
+
e M
6 e
9 s
9 e
e
+
,me p
--w 4--
v
-g9 7,
,+3
-