ML20033A949
| ML20033A949 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 11/12/1981 |
| From: | Kiper K Office of Nuclear Reactor Regulation |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8111300200 | |
| Download: ML20033A949 (5) | |
Text
,
,a..
As E
f t
i N0y 12 3g1 Docket No.: STN 50-454 and STN 50-455 MEMORANDutt FOR:
B. J. Youngblood, Chief. Licensing Branch No. 1, DL FROM:
K. L.~ Kiper, Project Manager, Licensing Branch No.1, DL
SUBJECT:
FORTHCOMING MEETING WITH COMMONWEALTH EDISON COMPANY -
BYRON DATE AND TIME:
November 17 - 19, 1981 8:30 - 5:00 LOCATION:
Byron Station Byron, Illinois PURPOSE:
To conduct a review of the Byron control room by a team from Human Factors Engineering Branch.
(Seeattachedagenda).
PARTICIPANTS:
NkC Staff D. Eckenrode, et al Commonwealth Edison Company R. Squires. T. Tram, et al Original Signed WE Kenneth L. Kiper Kenneth L. Kiper, Project Manager Licensing Branch No. 1 Division of Licensing Attachmmt:
As stated cc: See next page O
DL:
11 Y 1/
omes >
Jb.
..DL :
L......DL:
11 1
/j.
.. f.
SURNAME > KKipery1..... WL
.lL1Y b load e-,..wp.at.......1haiB1..... w%..........
NRc rORM 318 0480) NRCM Cao OFFiClAL RECORD COPY uso m i i.- m co
t l
x, MEETING NOTICE DISTRIBUTION
-Docket-FH e-J. Stolz NRC PDR S. Hanauer Local PDR P. Collins TIC ggy 12 g D. Vassallo NSIC D. Ziemann aaf/ro; TERA T. Murley s--
Branch File P. Schroeder
'7 b(,_,N7 g %
E. Case K. Kniel S
r J
1.J D. Eisenhut D. Skovholt NOV1g)ggg,g l
R. Purple G. Knighton g7 umgsp" b_i T. Novak M. Ernst S. Varga R. Baer T. Ippolito E. Adensam 9
/g R. A. Clark A. Thadani N. Hughes ACRS (16)
(o
/
N J. Youngolood Attorney, OELD R. Tedesco OIE (3)
A. Schwencer OSD (7)
F. Miraglia
' Project Manager. KKiDer -
J. R. Miller Licensing Assistant MJ Rushbrook G. Lainas Receptionist D. Crutchfield W. Russell J. LeDoux, I&E J. 01shinki R. Vollmer I&E Headquarters I&E Region I R. Bosnak F. Schauer I&E Region II R. E. Jackson I&E Region III G. Lear I&E Region IV W Johnston I&E Region V S. Pawlicki V. Benaroya NRC
Participants:
Z. Rosztoczy W. Hadss DEckenrode, WKane D. Muller R. Ballard W. Regan V Moe r' R. Mattson P. Check
.F.
Co,ngel
- 0. Parr bec: Applicant & Service List F. Rosa W. Butler W. Kreger
^
R. W. Houston.
W. Gammill L. Rubenstein T.'Speis M. Srinivasan B. Grimes S. Schwartz F. Pagano S. Ramos J. Kramer
Mr. Louis 0. DelGeorge Director of Nuclear Licensing Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690 ccs:
Mr. William Kortier U. S. Nuclear Regulatory Commission Atomic Power Distribution Resident Inspectors Office Westinghouse Electric Corporation 4448 German Church Road P. O. Box 355 Byron, Illinois 61010 Pittsburgh, Pennsylvania 15230 Ms. Diane Chavez Paul M. Murphy, Esq. _
602 Oak Street Isham, Lincoln & Beale Rockford, Illinois 61104 One First National Plaza 42nd Floor
~
Chicago, Illinois 60603 Mrs. Phillip B. Johnson 1907 Stratford Lane Rockford, Illinois 61107 Ms. Bridget Little Rorem Appleseed Coordinator 117 North Linden Street Essex, Illinois 60935 Dr. Bruce von Zellin Department of Biological Sciences Northern lllinois University DeKalb, Illinois 61107 Mr. Edward R. Crass-Nucleae Safeguards and Licensing Division Sargent & Lundy Engineers 55 East Monroe Street Chicago, Illinois 60603 huclear Regulatory Commission Region III.
Office of Inspection and Enforcement 799 Roosevelt Road Glen Ellyn, Illinois 60137 Myron Cherry, Esq.
Cherry, Flynn and Kanter 1 IBM Plaza Suite 4501 Chicago, Illinois 60611
j '.
4 Enclosure Human Factors Engineering Branch Site Visit to Byron Station Contro'l Room Visit Agenda and Assistance Required 11/17/81 0830 - Entrance Briefing (conference room)
NRC to Plant Manager, CECO personnel, consultants and other personnel specified by Plant Manager Introductions of Personnel Explanation of Review / Audit Process (What, How, Schedule) 0930 - Brief tour of control room to understand general layout of systems 1000 - Begin Review in Control Room
- Need three qualified CR Operators (Preferrably one Shift Supervisor and two operators)
- Need engineering personnel to answer technical questions about CR
- Need HFE personnel to discuss specific HF features
- Need permission (passes) to use photographic equipment in CR and to take equipment (four cameras and accessories) in and out of plant.
- First day review subjects will be Control Displays, workspace, Remote Shutdown Panel.
11.18/81 0830 - Continue Review in Control Room (same needs as day one)
- Second day review subjects will be Annunciators, Labels and L6 cation Aids, Process Computer 11/19/81 0830 - Continue Review in Control Room
- (same needs as day one)
- Third day review subjects will be Panel Layout, Control / Display Intergation 1500
- Meeting with Management and Technical Personnel (Conference Room)
- Discuss Findings
- Discuss solutions (at least to PDA findings)
- List Items which could not be reviewed
- Discuss schedule of events following visit
- Other
t
. Other needs during visit:
- Small office or conference room to accomodate six people for the three days (perferrably near CR)
- Use of copy machine Phone numbers (CR, office) where NRC personnel can be reached by home office Control room lighting (temporary) sufficient to photograph in all area with ASA 400 film Mockups and overlays of all design modifications already committed.
I l
s
,-,