Text
-
4 DUKE POWER COMPANY '
PowEn Bun.orno 42a Socin Cnuncu SinEzr, CnARI.OTTE, N. C. eaa.sa WIL LI AM_ O. PA R M ER..J R.
%Ct. Pats.otNT TELEPMoNr:AmtA 704 ses. p ooveno.
' November 23, 1981 273-4o83.
t Mr. Harold Denton, Director W
90 [fg d
Office of Nuclear Reactor-Regulation 25 U. S. Nuclear. Regulatory. Commission Q'
[j bd g //[,y86. &
E Washington, D. C.
20555 i
~~ -
2.
~
Attention:
Ms. E. G. Adensam, Chief u,,)g 8/
j i ~
Licensing Branch No. 4 7,
Re: McGuire Nuclear Station iM g' D, s
Docket Nos.' 50-369, 50-370
. Control of Heavy Loads, NUREG-0612 1
Dear Mr. Denton:
Please find attached a revision to the October 8, 1981 submittal of marked General Arrangement drawings of the Auxiliary and Reactor Buildings which identified all overhead handling systems. The additional'information re-quested by.NUREG-0612 is not available at this time. Current plans call for the remaining information to be made available for submittal by January 15, 1G 2.'.
Very-truly yours,.
c X-du.!
O.
)
William O. Parker, Jr.
RWO:ls Attachment cc: w/o attachment Ms. M. J. Graham Mr. James P. O'Reilly, Director.
NRC Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Station Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 13 o 3 0
.s llT I
Agul.,ne b 0 bawyl Y*
$ bsb ltE6 F:I4 81112702ii 811123 ~
Pm CD PDR ADOCK 05000369 P
. pop
..o 4
. DUKE POWER COMPANY NCGUIRE NUCLEAR STATION UNITS 1 & 2 AUXILIARY BUILDING For the cranes listed below, there is sdfficient physical separation from any load impact point and any safety-related component to permit a' determination by inspection that a heavy load drop could not result in damage to any' system or-component required for plant shutdown or decay heat removal. A load drop from the remaining cranes
- could result in damage to any system or component.
required for plant shutdown or dcay heat removal. No interfering floors are
~
taken -into account. accept for the 1/4 ton cranes. No load from the 1/4 ton cranes will-penetrate the adjacent floor except in the case of covered hatches where the load drop zone will be projected to the nearest floor where no covered hatches exist.
A008 A051 A106 A012 A055 A109 A015 A089 A130 A038 A092 A133 A040 A093 A134 A041 A094 A135 A045 A097 A048 A099 Reference drawing MC-1040-17-02 and -03 for the Hoist and Crane Schedule;inationAuxiliary Building. Cranes A140 through A148 are in the Hot Machine Shop, Decontam Area, and the Contaminated Materials Handling Area. These cranes are not included in this response.
L f
I l
<1
wrqs MSGUIRE NUCLEAR S TATlON l
DUKE POWER CO.
N"l T. B.
R. B.
UNIT 2
' UNIT
~
AUXILIARY SERVICE BLDG.
BLDG.
NtT I)
T. B.
UNIT I NOTE:
ONLY THE AUXILIARY AND REACTOR BUILDINGS WILL BE EXAMINED FOR A RESPONSE TO NUREG0612.
t
~
s-w GENERAL ARRANGEMENT JWGS. KEY P _Ah ME GUIRE NUCLE AR STATION Alf LOAD DROP ZONES l
MECHANICAL EQUIPMENT REQUIRED FOR PLANT SHUTDOWN OR DECAY HEAT REMOVAL I-- --
ELECTRICAL EQUIPME NT REQUIRED FOR PLANT l
SHUTDOWN OR DECAY HEAT REMOVAL i
4 l
1 I
l
.-