Advises That Review of 800215 Integrated Leak Rate Test (ILRT) Rept Is Complete.Ilrt Schedule Presented in Acceptable.Requests That Appropriate Actions Be Taken to Assure Success of ILRT W/Containment in as-is Condition
ML20033A657
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 10/22/1981
From: Clark R
Office of Nuclear Reactor Regulation
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 8111250705
Download: ML20033A657 (2)


Text

,

e b

~

DISTRIBUTION:

OCT 2 21g.

GEcket FiTe7 NRC PDR L PDR NSIC DocketNo.50-31[

TERA ORBf3 Rdg 8' I 'C. A DEisenhut v

0 ELD (T

h NLUL h

Mr. A. E. Lundvall, Jr.

I&E-3 6

Vice President - Supply ACRS-10 U

4 "NOV02;ggg,,,,

Baltimore Gas & Electric Company JHeltemes P. O. Box 1475 PMKreutzer-3 W'"=*="wo.,

Baltimore, Maryland 21203..

RAClark

)

Dear Mr. Lundvall:

?

DJaffe 4

d b

Gray File 4

gg JShapaker W

We have completed our review of the Integrated Leak Rate Test (ILRT) report for Calvert Cliffs Unit 2 dated February 15, 1980. We agree with the conclusions presented in your report that although the ILRT for the Unit 2 containment in the "as is" condition proved unsu::cessful, the subsequent remedial actions appeared to result in a successful ILRT.

Section II.A.6.(a) of Appendix J to 10 CFR Part 50, states "If any periodic Type A test fails to meet the applicable acceptance criteria in III.A.S.(b),

the test schedule applicable to subsequent Type A tests will be reviewed and approved by the Connission." In response to this requirement, on September 9, 1981, BG&E submitted a schedule for Unit 2 ILRT #2 (Fall 1932 outage) and ILRT #3 (Fall 1985 outage). This schedule is consistent with the requirements of Calvert Cliffs Unit 2 Technical Specification 4.6.1.2a.

Since the failure of the Unit 2 ILRT #1 was not the result of serious containment degradation, we concur that the ILRT schedule presented in your letter of September 9, 1981 is appropriate. With regard to future ILRT's, including ILRT #2 and #3, we request that BG&E take appropriate actions to assure success of the ILRT's with the containment in the "as is" condition.

Sincerely.

Original signed by Robert A. Clark Robert A. Clark, Chief Operating Reactors Branch #3 l

Division of Licensing cc: See next page 9111250705 811022 PDR ADOCK 05000318 P

ppg ORBf 3gd,h,,,

,\\,},y'>

D OR 3 : D ',,,

OR CSB omes)

...u.ie.r,,,

D J,.

.n..,

JSh agak,(,r,,

RAClark_,

SURNAM Q one> 10//[/.81...

.10/.{.Y81......10/.fl.8,1,

,10fp,81 me ronu ne oo-sa nncu ona OFFICIAL RECORD COPY usa m e - m m

- y.

Baltimore Gas and Electr{c Company cc:-

James A. Biddison, Jr.

Ms. Mary Harrison, President General Counsel Calvert County Board of County Commissioners Baltimore Gas and Electric Company Prince Frederick, MD 20768 P. O. Box 1475 4

Baltimore, MD' 21203 U. S. Environmental Protection Agency Region III Office George F. Trowbridge, Esquire Attn: 'EIS Coordinator Shaw,'Pittman, Potts and Trowbridge

'Curtis Building (Sixth Floor)

[

1800 M Street, N. W.

Sixth and Walnut Streets Washington, D. C.

20036 Philadelphia, PA 19106 i

Mr. R. C. L. Olson, Principal Engineer Mr. Ralph E. Architzel Nuclear Licensing Analysis Unit Resident Reactor Inspector.

j Baltimore Gas and Electric Company,

NRC Inspection and Enforcement Room 922 - G&E Building P. O. Bos 437 i

P. O. Box 1475 Lusby, MD 20657 Baltimore, MD 21203 Mr. Charles B. Brinkman Mr. Leon B. Russell Manager - Washington Nuclear Operations Plant Superintendent Combustion Engineering, Inc.

Calvert Cliffs Nuclear Power Plant 4853 Cordell Avenue, Suite A-1 Maryland Routes 2 & 4 Bethesda, MD 20014 Lusby, MD 20657 Mr. J. A. Tierman, Manager Bechtel Power Corporation Nuclear Power Department Attn: Mr. J.' C. Judd Calvert Cliffs Nuclear Power Plant Chief Nuclear Engineer Maryland Routes 2 & 4 15740 Shady Grove Road Lusby, MD 20657 Gaithersburg, MD 20760 Mr. W. J. Lippold, Supervisor Combustion Engineering, Inc.

Nuclear Fuel Management Attn: Mr. P. W. Kruse, Manager Baltimore Gas and Electric Company Engineering Services Calvert Cliffs Nuclear Power Plant P. O. Box 500 P. O. Box 1475 Windsor, CT 06095 Baltimore, Maryland 21203 Public Document Room Mr. R. E. Denton, General Supervisor i.

Calvert County Library Training & Technical Services Prince Frederick, MD 20678 Calvert Cliffs Nuclear Power Plant Maryland Routes 2 & 4 Director, Department of State Planning Lusby, MD 20657 i

301 West Preston Street Baltimore, MD 21201

/

Mr. R. M. Douglass, Manager Quality Assurance Department Administrator, Power Plant Siting Prcgram Fort Sma11wcod Road Complex Energy and Coastal Zone Administration P. O. Box 1475 Department of Natural Resources Baltimore, MD 21203 Tawes State Office Building Annapolis, MD 21204 Mr. T. L. Syndor, General Supervisor.

Operations Quality Assurance Calvert Cliffs Nuclear Power Plant Maryland Routes 2 & 4 Lusby, MD 20657

-