Forwards IE Insp Rept 50-271/81-14 on 810706-07.No Noncompliance Noted
ML20033A573
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/11/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20033A574 List:
References
NUDOCS 8111250588
Download: ML20033A573 (2)


See also: IR 05000271/1981014

Text

7

ENCLOSURES TRANSMITTED HEREWITH

, , , .

~

1-

CONTAIN 10 CFR 2.790 INFORMATION

'

- -

.

.

l

1 1 SEP 1981

'

Docket'No. 50-271

l

r-

co

!

Vermont Yankee h'uclear Power Corporation

ATTN: Mr.-Robert L. Smith

/

g\\

.

Licensing Engineer

S

f

d

~

(

1671 Worcester Road

2 g

9

Framingham, Massachusetts 01701

d 198lw ~i -

'

~

f " Q

~f

.

Gentiemen:

\\ %

Subject:

Inspection 50-271/81-14

8

'b

.*

This refers to the special safeguards inspection conducted by Mr. R. J. Bailey

of this office on July 6-7,.1981, at the Vermont Yankee Nuclear Power Plant,

'Vernon, Vermont of' activities authorized by NRC License-No. DPR-28 and to the

discussions of our findings held 'by Mr. Bailey with Mr. Murphy at tLe conclusion

of the inspection, and to a subsequent telephone discussion betweet Mr. Penniman

.

of .the Vermont Yankee staff and Mr. Bailey on July 9,1981.

Areas examined during this inspection are described'in the Office of Inspection

and Enforcement Inspection Report which is enclosed with~this letter. Within

these areas, the inspection consisted of selective examinations of_ procedures

and representative records, interviews with personnel, and' observations by the

inspector.

!

Our inspector also verified the steps you have taken to correct the items of-

noncompliance brought to your attention in-the enclosure to our letter dated

January _14, 1981. We have no further questions regarding your action at this

time.

t

Within the scope of this inspection, no items of noncompliance were observed.

.

i

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

'

Title 10, Code of Federal Regulations, documentation of findings of your centrol

and accounting procedures for safeguarding special nuclear materials and your

'

facility security measures for physical protection are deemed to be commercial

or financial information within the meaning of 10 CFR 9.5(a)(4) and shall be

subject to disclosure only in accordance with the provisions of 10 CFR 9.12;

therefore, the enclosed inspection report will not be placed in the Public

Doc ment Room and till receive limited distribution

)

OYbER

I

(\\

l

ILEY:hh

l

8/11/81

4

l

Q g

,

l

OFFICIAL

ORD

OPY I

d

l

l

t

l

ENCLOSURES TRANSMITTED HEREWITH

b

R

CONTAIN 10 CFR 2.790 INFORMATION

g

L

_

. . - . .

_

_ - -

,

A

ENCLOSURES TRANSMITTED HEREWITH 1

CONTAIN 10 CFR 2.790 INFORMATION

.

  • '

..

-

.

Vermont ^ Yankee Nuclear Power Corporation. 2

1 1 SEP 1981

~

No reply.to this letter ~is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

hb

M.'64MO

' Q1 don J. Brunner, Acting Director :

. F-Division of Resident and Project

Inspection

~

Enclosure: Office of Inspection and' Enforcement Inspection

,

Report Number 50-271/81-14 (contains 2.7.90(d) Information)

cc (w/ copy of report cover sheet only):

Mr. Warren P. Murphy, Plant Superintendent

Mr.

W.- F. Conway, President and Chief Operating Officer.

Mr. F. W. Jackson, Manager of Operations

Mr.- L.'H. Heider, Vice President

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center-(NSIC)

NRC Resident Inspector (w/ copy of en:losure)

State'of New Hampshire.

State of Vermont

bcc:

Region I Docket Room (with concurrences)

Chief,.0perational Support Section (w/o enc 1)

ENCLObdkbR NbT