J Submitted:
)
SP Number 29.023.04 Approved:
Revision ' F (Plant 11anager)
. Effective Date
- - ~
' LEVEL-RESTORATION f
1 EMERGENCY PROCEDURE j
0 '!.
r' LS $ ci L3 1
1.0 PURPOSE
[ _
The purpoce of this procedure is to restore RPV water level to above top of active fuel.
2.0 ENTRY CONDITIONS Enter this procedure from SP 29.023.01 (Level Control) or SP 29.023.02 (Cooldown) when RPV uater level cannot be maintained above top of active fuel (TAF = +6" as 4
read on fuel zone instrunentation L1-007).
1 3.0 OPERATOR ACTIONS 3.1 Lineup for injection and start pumps in at least two of the following normal injection subsystens:
.3.1.1 CS A 3.1.1 Ref. SP 23.203.01 (Core Spray. System) 2.1.2 CS B 3.1.2 Ref. SP 23.203.01' (Core Spray System) r l
3.1.3 LPCI A 3.1.3 Ref. SP 23.204 01 (Low Pressure Coolant Injection) 3.1.4 LPCI B 3.1.4 Ref. SP 23.204.01 l
(Low Pressure Coolant Injection) 3.1.5 Condensate 3.1.5 Ref. SP 23.103.01 (Condensate Systen) l l
3.2
,11 less than two nornal l.
Injection subsystems (Paragraph 3.1)- can be lined up, l
THEf! line up as many of the following alternate injection
.subsystens as possible BUT bl 7,5-$5
- DO t:OT inject:
{ki uc'-
p
,,p>
{2 125 0
2 SP'29.023.04 Rev..F E
'PDR
/ /
.Page 1 of 12 I
~
4
~3.2.1-Reactor BuildingLService' 3.2.1 Ref. SP 23.122 01 Water System through' (Service Water) service water /recirc loop ultimate cooling water crosstie valves IP41-MOV-033A, MOV-0333, MOV-033C, and HOV-033D.
3.2.2 ECCS connections from the 3.2.2 Ref. SP 23.195.91:
Condensate Transfer System (Condensate Storage and Transfer) 3.2.3 SLC (test tank or boron 3.2.3 Ref. SP 23.123 91' tank)
(Standby Liquid f
Control) 3.3
))[ at any time water level cannot be determined THEN proceed as follows.
3.3.1 Jg[ no system SE nottal irjection subsystem is lined'up for injection with at least one pump running THEN start pumps in alternate injection subsystems which are lined up for injection.
3.3.2 If,ao system SE normal injection subsystem 2E alternate injection subsystem is lined up for injection with'at least one pump running THEN proceed to section 37E76 Core Cooling without injection SP 29.023.04 Rev. F
/ /
Page 2 of 12
3.3.3 IF a.systen OR normal injection subsystem OR
[
alternate' injection subsystem is lined up for injection-with at least one pump running, l
I
- TREN proceed to SP 29.023.05, Rapid RPV Depressurization 3.4 MONITOR RPV pressure 3.4 KOTE AND IF,at any time the RPV water level trend reverses or RPV.
water level, pressure' changes-region, Ti1EN proceed at the step indicated THEN return to' step 3.4.
in the following. table.
Table 1 a
RPV PRESSURE REGION 333 333 to 110 110 HIGli INTERMEDIATE LOW I
i RPV LEVEL INC.
l3.5 3.6 3.7 I
I p
- 3.8 3.8 3.9' i
t i '
4 T
SP 29.023.04 Rev. F.
/ /
. Page 3 of 12
,,--y.-re,9
-yy,-
y 7
-,,,,,m-*-em
,.ye,
-wn,,
-w-
,-n y4.-.y,r,,,
y+
.yw.,-
-e,-,a wv--.-%-w-1
,+,y,,
y r
wy fy v
ww.-
r yry
3.5 RPV level inerracinq and RPV pressure greator than 333 psig (Iligh Region) 3.5.1 E!!TER SP 29.023.91 (Level Control) at Step 3.2.
r SP 29.023.04 Rev. F
/ /
Page 4 of 12
m l
' 3.6 RPV leval incressing and RPV nressure batusen 333 and 110 psig (intermediate region) a CNJIIO.N
~
- Do not depressurize the RPV below 110 psig unless notor driven punps sufficient to maintain RPV vater level are running and the systems are available for injection.
- l-i 3.6.1
))[ HPCI and RCIC are not available AND RPV pressure is increasing, i
THEN ENTER SP 29.023.05
{
(Rapid RPV Depressurization) l-3.6.2
.IF HPCI and RCIC are' IUIt available
- l AND RPV pressure is not increasing, THEN ENTER SP 29 023.01 (Level Control) step 3.2.
3.6.3
))[HPCI
_9A RCIC are injecting AND RPV water level increases to +12.5",
THEN ENTER SP 29.023.01 (Level Control) Step 3.2.
SP 29.023.04 Rev. F
/ /
Page'5 of 12
9 3.7 : RPV level increasine and RPV pressure less than 110 psig:(low region) 3'. 7.1 E RPV pressure is-increasing,1 TIIEN ENTER SP 29.023.05' (Rapid RPV Depressurization):
3.7.2:
g-RPV pressure-'is not increasing, T11EN E!;TER SP 29.023 01 (Level Control) step 3.2.
t I
SP 29.023.04 Rev. F
./ /
Page 6 offl2 t
e e
J 3.8 RPV level dscreasing and. RPV pressure greater than 110 psig (Intermediate /High region).
-3.841 IF HPCI and RCIC are 3.8.1 Ref. SP 23.202.01 not operating, (High Pressure Coolant Injection)
THEN restart HPCI AND RCIC RCIC - Ref. SP 23.119 01 (Reactor Core Isolation Cooling System) 3.8.2 IF CRD is not operating AND at least 2 normal injection subsyste=s are lined up for injection with. pumps
- running, THEN ENTER-SP 29.023.05 (Rapid RPV Depressurization).
3.8.3 IF,CRD is not operating 4
AND no normal injection subsystem is lined up for injection with at least one pump
- running, THEN start punps in the following alternate i;
injection subsystens which are lined up for injection.
.I i
(A) Reactor Building (A) Ref. SP 23.122.01 i
System through service water /
l recire loop 1;
ultimate cooling water crosstie l
valves IP41-MOV-1 033A, MOV-033B, MOV-033C, and MOV-033D.
~
SP 29.023.04 Rev. F
/ /
Page 7 of 12 b
'(B).ECCS connections (B) Ref. SP 23.195.01 from the Condensate
- (Condensate Transfer System
. Storage and' Transfer)
. (C)' ' SLC (test tank (C) Ref; SP 23.123.01 or boron tank)
~
3.8.4 WHEN RPV water level-3.8.4' NOTE dropg to TAF i%7
+6" as read on
=
fuel zone THEN perform, step 3.8.5 ins t rumentation P.R_
. LI-007.
step 3.8.6.
3.8.5 IF_ a system 2
normal injection
- subsystem
]!
set alternate injection subsystem is lined up-for injection with at least one pump running THEN proceed to SP 29.023.05 (Rapid RPV Depressurization) 3.8.6 Il[ no system 0, R normal injection subsystem OR alternate injection subsystem is lined up for injection with at least' one pump running, THEN perform Core Cooling
-l' without injection as follows.
i l;
,~,
SP 29.023.04 Rev. F
/ /
Page 8 of 12-
-e.n
~m e-y,s, w
e
.-g--
-n n-m
-,7 n
, - y
,e
-v e
y y
e e
a
-n., ~e--
-- +
g-
p-2
.(A) E st sny time -any
~
system
_OR normal' injection subsystem 0.E alternate injection
-subsystem is lined up for injection-with at least one pump running, THEN proceed to SP 29.023.05 (Rapid RPV Depressurization).
(B) k" DEN RPV water level drops to (Later) (2/3
~
core height) 0,,,R,,
IF RPV water level cannot be determined THEN open one SRV.
(C) UHEN RPV pressure:
drops below (later),
OPEN all ADS Valves.
(D) IF all ADS valves cannot be opened, THEN open other SRV's until a total of 7 valves are open.
SP 29.023.04 Rev. F
/ /
Page 9 of 12
~
O
3.9 RPV' level decreasing and RPV pressure less than 110 psig
.(low region).
3.9.1 IF no normal injection sf' stem is lined.up for injection with at least one pump running,-
THEN start pumps in the following alternate
. injection subsystems which are lined up for injection'.
(A) Reactor Building (A) Ref. SP 23.122.01 Service Water (Service Water)
System through service water /.
recire loop ultimate cooling water. crosstie valves IP41-MOV-033A, MOV-033B, MOV-033C, and MOV-033D.
(B) ECCS connections (B)
Ref. SP 23.105.01 from the Conden-(Condensate sate Transfer Transfer and System Storage)
(C) SLC (test tank (C) Ref. SP 23.123.01 or boron tank)
(Standby L! quid Control) 3.9.2 IF RPV pressure is increasing, THEN proceed to SP 29.023.05 (Rapid RPV Depressurization).
3.9.3 IF RPV pressure is not 3.9.3 NOTE increasing, TAF = +6" as read oa fuel zone AND instrumentation LI-007.
RPV water level drops i:o TAF THEN perforn Core Cooling without Level Restoration as follows:
SP 29.023.04 Rev. F
/ /
Page 10 of 12
- +
CAUTION NPSH requirements for pumps taking a suction from the Suppression Pool require a minimum. level of 14 feet.
CAUTION Cooldown ra?.es greater than 10@*F/hr may be required to accomplish step (A).
(A) Open all ADS valves.
(B) IJ[ not all of the-ADS valves can be opened, i
THEN open other SRV's until a total of 7 valves are open.
(C) Operate CS subsystems with suction from the suppression pool.
(D) UHEN at least one core spray-subsystem is i.
operatin; with suction from the suppression pool AND RPV pressure is less than 290
- psig, THEN terminate injection into the RPV from sources external to the primary containment.
SP 29.023.04 Rev. F
/ /-
Page 11 of.12 4
g.,..
n.
~
me=dw-+-
y
~
(E) Il[ RPV water' (E) NOTE
~levelLis TAF = +6" as' read
-restored to TAF.
on. fuel zone
' instrumentation.
THEN ENTER.
LI-007.
SP 29.023.01 (Level Control) ~
step 3.2.
4.0 REFERENCES
r 4.1 SP 29.023.05 Rapid RPV Depressuri=ation 4.2-SP 29.023.01' Level Control 4.3 SP 23.202.01 High Pressure Coolant Injection 4.4 SP 23.'119.01 Reactor Core Isolation Cooling (RCIC) System 4.5 SP 23.106.01 Control. Rod Drive 4.6 SP 29.023.09 RPV F1- -ling 4.7 SP 23.203.01 Cere Spray System 4.8 SP 23.123.01 Standby Liquid Control 4.9 SP 23.204.01 Low Pressure Coolant Injection 4.10 SP 23.103.01-Condensate System 4.11 SP 23.105.01 Condensate Storage and Transfer System 4.12 SP 23.109,01 Feedwater System 4.13 SP 23.122.01 Service Water SP 29.023.04 Rev. F
/ /
Page 12 of 12