ML20032E569
| ML20032E569 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 11/10/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20032E570 | List: |
| References | |
| NUDOCS 8111200698 | |
| Download: ML20032E569 (2) | |
See also: IR 05000304/1981024
Text
-.
.
_.
-
.
NOV 10198C
4
Docket No. 50-304
,
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
-Gentlemen:
1
This refers to the routine safety inspection conducted by Mr. I. T. Yin
of this office on October 29-30, 1981, of activities at Zion Station,
Unit 2 authorized by NRC Operating License No. DPR-48 and to the dis-
cussion of our findings with Mr. K. L. Graesser and others of your staff
at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
-
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
i
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven
(7) days from the date of this letter of your intention to file a request
for withholding; and-(b) submit within twenty-five (25) days from the date
of this letter a written application to this office to withhold such infor-
!
mation.
Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
I
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons which are the bases for the claim that the
information should be withheld from public disclosure. This section further
I
fd I !N,,
h
,
G0
s#
!
UL
0
stf
'
~~
Ac,# y
$r ',
,P
o
8111200698 8111
gDRADOCK05000
U
-
Q
s
.
-
-
-
- -
- -
- -
- - -
.
- - - -
- - -
- -
.
f -.---- ---.
- --
.
.
Commonwealth Edison Company
-2-
NOV i 0 GS1
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the snelosed inspection report will be
placed in the Public Document Rocm.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
M[
ifbL
g
C. E. No eli'hs, Director
Division of Engineering and
Technical Inspection
Enclosure:
IE Inspection
Report No. 50-304/81-24
cc w/ encl:
Louis 0. DelGeorge
Director of Nuclear
Licensing
K. Graesser, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
I
1
Rill,L,
RIII
RIII
RIII
RIIj
RI -
Yin /jpl
lT}1h
Willia /
'3 h
"k h
/77/
/fs
.
Danie'1 son
ms
Nftsler
-11 ayes
N r lfus
11/6/8
- ll4lg')
pj y/V7
7jjg
.]