ML20032D767
| ML20032D767 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 10/27/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| Shared Package | |
| ML20032D768 | List: |
| References | |
| NUDOCS 8111170462 | |
| Download: ML20032D767 (2) | |
See also: IR 05000416/1981042
Text
l i II"
-
-
.
OCT2 71981
\\?
'll/p/
Mississippi Power and Light Company
e -
,
f r, , -
g gal- fi [f} g~
L
ATIN: Mr. N. L. Stampley
Vice President of Production
,L
P. O. Box 1640
4
~
C
NOV1O 00b i}
Jackson,liS 39205
\\ [ ** EQ*M C
^
Gentlemen:
'
[/V
'(
Subject:
Report No. 50-416/81-42
' ' / /, g
This refers to the routine inspection conducted by Mr. G. L. Paulk of this
office on October 6-9, 1981, of activities authorized by HRC Construction Pemit
No. CPPR-118 for the Grand Gulf facility and to the discussion of our findings
held with ifr. C. K. McCoy, Plant flanager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of tMs inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously reported
Jnres0lved items. The status of these items is discussed in the enclosed
inspection report.
In accordance with 10 CFR 2.7% of the Commission's regulations, a copy of this
letter and the enclosed repyt
ili be pla&! in the NRC's Public Document Room.
If the report contains any iniu~ation that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), :
is nece n y that you:
(a) notify this office
by telephone within ten days from me date W this letter of your intention to
file a request for withholding; and N sutait within twenty-five days from the
date of this letter a written application to this office to withhold such infor-
ma tion.
If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so
that a new due date may be established.
Consistent with section 2.790(b)(1),
such applicatim must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld fron if.;blic disclosure.
This section further
requires the statement to address wit < specificity the considerations listed in
10 CFR 2.790'b)(4).
The information uught to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
8111170462 011027
gDRADOCK 05000416
Z Eol,
b ///
.
,
iiississippi Power and Light Company
2
gggj
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/s/
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report No. 61-42
cc w/enci:
D. C. Gibbs, Vice President
liiddle South Energy, Inc.
C. K. licCoy, Plant !!anager
bcc w/ encl:
NRC Resident Inspector
Docunent l',anagement Branch
State of !!ississippi
RII:RRPI
RII:RRPI
RII:RRPI
I :RRPI
Oct~
GW
//rW~
PTaylor
RClewi
GLPaulk
FCantrell
,
,-
p10/20/81
7
10/g/81
7M0/K/81
10
1
>
- . g.
7,}
>
iu
A