l i II"

-

-

.

OCT2 71981

\\?

'll/p/

Mississippi Power and Light Company

e -

,

f r, , -

g gal- fi [f} g~

L

ATIN: Mr. N. L. Stampley

Vice President of Production

,L

P. O. Box 1640

4

~

C

NOV1O 00b i}

Jackson,liS 39205

\\ [ ** EQ*M C

^

Gentlemen:

'

[/V

'(

Subject:

Report No. 50-416/81-42

' ' / /, g

This refers to the routine inspection conducted by Mr. G. L. Paulk of this

office on October 6-9, 1981, of activities authorized by HRC Construction Pemit

No. CPPR-118 for the Grand Gulf facility and to the discussion of our findings

held with ifr. C. K. McCoy, Plant flanager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of tMs inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously reported

Jnres0lved items. The status of these items is discussed in the enclosed

inspection report.

In accordance with 10 CFR 2.7% of the Commission's regulations, a copy of this

letter and the enclosed repyt

ili be pla&! in the NRC's Public Document Room.

If the report contains any iniu~ation that you believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), :

is nece n y that you:

(a) notify this office

by telephone within ten days from me date W this letter of your intention to

file a request for withholding; and N sutait within twenty-five days from the

date of this letter a written application to this office to withhold such infor-

ma tion.

If your receipt of this letter has been delayed such that less than

seven days are available for your review, please notify this office promptly so

that a new due date may be established.

Consistent with section 2.790(b)(1),

such applicatim must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld fron if.;blic disclosure.

This section further

requires the statement to address wit < specificity the considerations listed in

10 CFR 2.790'b)(4).

The information uught to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

8111170462 011027

gDRADOCK 05000416

PDR

Z Eol,

b ///

.

,

iiississippi Power and Light Company

2

gggj

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/s/

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report No. 61-42

cc w/enci:

D. C. Gibbs, Vice President

liiddle South Energy, Inc.

C. K. licCoy, Plant !!anager

bcc w/ encl:

NRC Resident Inspector

Docunent l',anagement Branch

State of !!ississippi

RII:RRPI

RII:RRPI

RII:RRPI

I :RRPI

Oct~

GW

//rW~

PTaylor

RClewi

GLPaulk

FCantrell

,

,-

p10/20/81

7

10/g/81

7M0/K/81

10

1

>

. g.

7,}

>

iu

A