ML20032D729

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Status of Final Rept on Pipe Hanger Stiff Clamps.Supply Sys Review Revealed Need for Addl Technical Evaluations & A/E Rept Indicated Need for Further Analysis.Final Rept Will Be Provided by 811215
ML20032D729
Person / Time
Site: Satsop
Issue date: 11/09/1981
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20032D725 List:
References
10CFR-050.55E, 10CFR-50.55E, GO3-81-2713, NUDOCS 8111170429
Download: ML20032D729 (1)


Text

i' TitG ti.T T E n St.TISFIEi. COR.:iT:.UNT r:o.

WT E "" O"3'"'C"" 0" nns t.cTTEn tooEsi tuaEs i: oil EsTABLisa A I:EW CC.- 3D 3

b O---

COMMITMENT CONTROL RG PECK WPPss coHREsPONDEr.cE tcO.

/

ROUTING DL QUAMME SITE FILES JP SLUKA WG ALBERT /faC OE TRAPP

-- H DR C00DY JE WERLE

~

~.

AM CUTRONA JJ DORAN DE DOBSON RB GLASSC0CK/280 November 9, 1981 G03-81 -2713 CE LOVE DD O'SULLIVAN/270 U. S. Nuclear Regulatory Commission, Region V

~

Office Of Inspection And Enforcement 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. B. H.,Faulkenberry.

g Chief, Re. actor Construction Projects Branch g

\\

e Gentlemen.

I

Subject:

PROJECT N05. 3 AND 5 NRC INSPECTION OF WNP-3 AND WNP-5 E

h (e) 2

~

DOCKET NUMBERS 50-508 AND 50-509 STATUS OF FINAL REPORT, POTEF n 10Cl%50.

lEQ PIPE HANGER STIFF CLAMPS

Reference:

1) letter, G03 %

R.

t >d o.i c to B. H. Faulkenb rr o ted

, 1981.

g On October 2, 1981, your office wa

r. t 'ied that the Supply System had reviewed the Architect /Engint'r - ' A E) proposed final report concerning pipe hanger stiff clamp T!_ Supply System review dis-9 closed areas that required the A/E an Istiff clamp supplier to per-form additio echnical evaluations.

Reference. repdbed that the final report, including the additional l

d evaluations,\\wouJ#be forwarded to your of fice by November 4,1981.

j Hr ver,uponhu),,

stem receipt and review of the A/E's supple-S m(eto report,

't h-been determined that further analysis and clari-D]

~

fic ti o is reqq ed.

/

"he fi l

ort concerning this subject will be provided by December fi 1%esecontactmedirectly.

198 hould you have any questions or desire further information, l

/

le I

Very truly yours, 3

5

/

3 l

R. S. Leddick j5 Program Director, W"P-3/5

[ _..

o cc:

J. Adams - NESCO

i D. Smithpeter - BPA

(~

Ebasco - New York UNP-3/5 Files - Richland glh O

I

J 6

.