ML20032D724

From kanterella
Jump to navigation Jump to search
Forwards Interim Deficiency Rept Re Pipe Hanger Stiff Clamps
ML20032D724
Person / Time
Site: Satsop
Issue date: 11/10/1981
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20032D725 List:
References
10CFR-050.55E, 10CFR-50.55E, GO3-81-2719, NUDOCS 8111170425
Download: ML20032D724 (1)


Text

-

Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428 g

Noy j

u&

YrlI '

November 10, 1981 G03-81-2719 Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington D. C.

20555 Attention: Mr. V. Stello Antlemen:

Subject PROJECT NOS. 3 AND 5 DOCKET NUMBERS 50-508 AND 50-509 INTERIM REPORT OF POTENTIAL 10CFR50.55(e)

PIPE HANGER STIFF CLAMPS Attached is a copy of the interim report provided to Region V concern-ing a potential 10CFR50.55(e) associated with pipe hanger stiff clamps.

Should you have any questions or desire further information, please contact me directly.

Very truly yours, R. S. Leddick Program Director, WNP-3/5 cc:

J. Adams - NESCO-WO/A D. Smithpeter - BPA -WO/A WNP-3/5 Files - Richland -WO/A Ebasco - New York -WO/A

$ b li Oko!fffjj, PDR