Provides 45-day Response to Per 811014 Telcon. GE Rept NEDO-24342, GE Evaluation in Response to NRC Request Re BWR Scram Sys Pipe Breaks, Adequately Provides Response to Request for Generic Evaluation
ML20032D636
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/10/1981
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Tedesco R
Office of Nuclear Reactor Regulation
References
NUDOCS 8111170344
Download: ML20032D636 (1)


Text

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 0

OI PHILADELPHI A. 'A.19101 12151841-4502 V IC E-PR ESID E N T t resseet t meenG **so sent as.c.e Mr. Robert L, Tedesco

/S O.)

Assistant Director for Licensing

/

.h' b

(C -

Division of Licensing

[2 fir N0vy O ISSfg 7 U. S. Nuclear Regulatory Commission Nashington, DC 20555 h

,s,$NlssQrcy b;[

u

Subject:

Limerick Generating Station, Units 1 6 2 Q/

Safety Concerns Associated with Pipe Breaks Q..

/g in the ER Scram System Docket No. 50-352 and 50-353

Dear Mr. Tedesco:

In accordance with a telephone conversation between G, D. Calkins (NRC Division of Licensing) and L, B. Pyrih of our staff on October 14, 1981, we are hereby providing the 45 day response to your April 30, 1981 letter to E. G. Bauer, Jr.

It is our position that the three requests for generic evaluation made in the April 30 letter were adequately fulfilled by the General Electric Company report NEDO-24342, entitled "GE Evaluation in Reponse to.NRC Request Regarding BNR Scram System Pipe Breaks", dated April 1, 1981. This report was transmitted to the NRC by letter from Glenn G.

Sherwood (GE) to D. G. Eisenhut (NRC) on April 30, 1981.

In accordance with the reference telecon, our 120 day response will be submitted by February 10, 1982. We also note that plant specific responses conforming to the guidance contained in NUREG-0803 were requested in a letter from D. G. Eisenhut (NRC) to all BNR Licensces on July 7, 1981. Therefore, anticipating this same requirement for Limerick, our 120 day response will address the requirements of NUREG-0803 " Generic Safety dvaluation Report Regarding Integrity of BNR Scram System Piping" published in August 1981.

Should you have any questions, please contact us.

1 Sincerely, IM[

\\

8111170344 811110 PDR ADOCK 05000352 3ijf A

PDR