ML20004D786

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-352/81-04 & 50-353/81-04 on 810302-27 & Notice of Violation
ML20004D786
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/30/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20004D787 List:
References
NUDOCS 8106100039
Download: ML20004D786 (2)


See also: IR 05000352/1981004

Text

'

A ha astog

TA

g

g

UNITED STATES

NUCLEAR REGULATORY COMMISSION

3

o

$

,E

REGION I

$

631 PARK AVENUE

g *****,&g

KING OF PRUSSIA. PENNSYLVANIA 19406

o,

a

Docket Nos. 50-352

g 3 gg

p

,

50-353

-

Philadelphia Electric Company

' . '

,

JUN 0 81981 * r

ATTN: Mr. John S. Kemper

"

Vice President

' 6

u.a, min anmen d

Engineering and Research

N"

\\h

2301 Market Street

g

Philadelphia, Fennsylvania

19101

/

Gentlemen:

Subject:

Combined Inspection Report 50-352/81-04; 50-353/81-04

This refers to the routine safety inspection conducted by Mr. J. P. Durr of

this office on Ma"ch 2-27, 1981 at Limerick Generating Station, Unit Nos. 1 and

2, at Limerick, Bennsylvania of activities authorized by NRC License Nos. CPPR-106

and CPPR-107 and to the discussions of our findings held by Mr. J. P. Durr with

Mr. D. DiPaolo of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by

the inspector, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your activities

were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

These items

of noncompliance have been categorized into the levels described in the

Federal Register Notice (45 FR 66754) dated October 7, 1980. You are required

to respond to this letter and in preparing your response, you should follow the

instructions in Appendix A.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, e copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any information

that you (or your contractor) believe to be proprietary, it is necessary that

you make a written application within 25 days to this office to withhold such

information frone public disclosure. Any such application must be accompanied by

,

an affidavit executed by the owner of the information, which identifies the

'

l

document or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by the

Commission as listed in subparagraph (b) (4) of Section 2.790. The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

I

t

I

(810610' OM

k

!

. _ -

-.

.

.

. , .

..

.-

.

.

APR 301981

Philadelphia Electric Company

2

i

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

,

Sincerely,

<

.

^

':::!

l

R. R.

ig, Ch f

Projects Branch #2, Division of

'

Resident and Project Inspection

Enclosure:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Combined Inspection

Report Number 50-352/81-04; 50-353/81-04

'

cc w/encls:

V. S. Boyer, Senior Vice President, Nuclear Power

!

!

1

_.

_,

. _ , _ .

_ . , _ . _ . _ _ , . .

,

. ~ ,

__

_ _ . _ . . . _ . . _ , . _ . . _ , _ , . . _ . . . . . _ .