ML20032D635

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1981
ML20032D635
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/04/1981
From: Culver M
FLORIDA POWER CORP.
To:
Shared Package
ML20032D634 List:
References
NUDOCS 8111170343
Download: ML20032D635 (4)


Text

.

OPERATING DATA REPORT DOCKET NO.

50-302 DATE 11/4/81 CO.NIPLETED BY M. tr t'ulver TELEPIIONE (904) 795-6486 OPERATING STATUS

1. Unit Name:

Crystal River Unit 3 Notes 10/1/81-10/31/81

2. Reporting Period:

2452

3. Licensed Thermal Power (.\\lWt1:

.890

4. Nameplate Rating (Gross.\\lwe):
5. Design Electrical Mating (Net 31We): M5
6. 31asimum Dependable Capacity (Gross 31We):

821

7. 31asimum Dependable Capacity (Net 31We):

782 S.. If Changes Occur in Capacity Ratings (Irems Nu. ier 3 Through 7)Since Last Report.Gise Reasons:

l N/A

9. Power Lesel To Which Restricted,if Any (Net MWe):

NONE

10. Reasons For Restrictions. If Any:

NONE This Stonth Yr..to.Da t e Cumulathe i1. Ilours In Reporting Period 745 7296 40656

12. Number Of liours Reactor Was Critical 0

5079.05 24963.56

13. Reactor Resene Shutdown llours 0

80.0 1209.22

14. Ilours Generator On.Line 0

5023.1 24388.48 3

4

15. Unit Resene Shutdown flours 0

0 0

16. Gross Thermal Energy Generated (\\lWil) 0 11782893.3 54461303
17. Gross Electrical Energy Generated I.\\lwil) 0 3984489.2 18488420 t
18. Net Electrical Energy Generated I.\\lWill 0

3788869 17534439

19. Unit Senice Factor 0.0%

68.85%

59.99%

l 20.. Unit Asailability Factor 0.0%

68.85%

59.997.

0.0%

66.417.

55.15%

21. Unit Capacity Factor (Using.\\lDC Net)
22. I' nit Capacity Factor IUsing DER Net) 0.0%

62.95%

52.28%

23. Uni Forced Outage Rate 0.0%

17.29%

26.85%

24. Shutdown. Scheduled Oser Nest 6 alonths t'l> pe. Date.and Duration on uni; CONTINUATION OF PRESENT REFUELING OUTAGE.
25. If Shut thewn \\t I:nd of iteport Period. I:stimated Date of Startup:

12/5/81

26. L nits in f est Status irrior io commercial operations-Forecast Achiesed 1/14l77 INIIl \\; rulIICAIIgy INill \\L LI ICittici ty 1/30/77 00\\itlERrs \\ L ort It a t ion 3/13/77 i

8111170343 011112 PDR ADOCK 05000302

'ol77 8 R

PDR

.WERAGE DAILY UNIT POWER LEVEL DOCKET No.

50-302

'JNI T FLCRP-3 DATE 11/A/R1 CO\\lPLETED BY M.W. Culver TELEPil0NE (904)795-6486 MONTil October. 1981 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL L%!We Net)

(Mwe.Neq 1

0 g7 0

0 2

0 g3 3

0 0

in 0

4 20 0

5 n

21 0

6 0

33 7

0 23 8

24 0

9 0

25 n

10 0

26 0

0 11 27 0

12 2s 0

13 0

29 0

14 30

_g 15 0

31 0

I f, O

INSTT(LT TION S Gn tha t-n:u a,t the neraes.En; a:ap.t n.., uwe.Nei n,r each Jay m the rep.irtin; m.inth. ('. impute to t he r.ca r e st,s hi je "le :1,ut !

(9!77 )

l b

O.

t l

UNIT SillllDOhNS AND POWER REDUCIlONS DOCKEINO.

50-302 UNil NAME M rnP-3 DAiE _ 11/4/31 COMI't.E'IED 11Y Lu enlunr R EPOR I MON iil _0c enhor 1981 l El.1 l'IION E 404NddA

[2

'h k N')

l icemee j-r, I'q Cause & Correctise N*

lhic r-9:

2 i:O l><e n t 77 E. ~:'

Atinen to j@

d 3 3; -

Repost r

$0 hC Paesent Recurrence I

e u

6.

81-51 811001 S

745 C

1 N/A EE BEEEEE Schdduled Refueling Outage.

s i

2 3

4 11 Forced Reason :

Method:

INinbit G Instructions S Smheduled A Lqmpment Fai!ure(Explain)

I. Manual for Preparation of Data 11 Maintenance of Test 2-Manual Scram.

Entry Sheeis for Licensee C Refueling 3 Automatic Serain.

Esent Report (1 ER) File (NURI G-D-Regulatory Restriction 4;Ot her ( Explain )

0161) l' Operator Training & l.ieense Examination F-Ad minist ratis e 5

G-Operational 1:e ror (Fxplain )

I shibit I - Same Source pt/77)

!! Ot her ( E xplain)

MONTHLY OPERATIONAL SUIS 1ARY STATDIENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 11/4/81 COMPLETED BY M.W. Culver TELEPHONE (ont)'o5-6/ 86-MONTH October. 1981

SUMMARY

STATDIE!U:

Unit down all month in a scheduled refueling outage.

(

(

I

(

l l

1 l

1