ML20032D635
| ML20032D635 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/04/1981 |
| From: | Culver M FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20032D634 | List: |
| References | |
| NUDOCS 8111170343 | |
| Download: ML20032D635 (4) | |
Text
.
OPERATING DATA REPORT DOCKET NO.
50-302 DATE 11/4/81 CO.NIPLETED BY M. tr t'ulver TELEPIIONE (904) 795-6486 OPERATING STATUS
- 1. Unit Name:
Crystal River Unit 3 Notes 10/1/81-10/31/81
- 2. Reporting Period:
2452
- 3. Licensed Thermal Power (.\\lWt1:
.890
- 4. Nameplate Rating (Gross.\\lwe):
- 5. Design Electrical Mating (Net 31We): M5
- 6. 31asimum Dependable Capacity (Gross 31We):
821
- 7. 31asimum Dependable Capacity (Net 31We):
782 S.. If Changes Occur in Capacity Ratings (Irems Nu. ier 3 Through 7)Since Last Report.Gise Reasons:
l N/A
- 9. Power Lesel To Which Restricted,if Any (Net MWe):
NONE
- 10. Reasons For Restrictions. If Any:
NONE This Stonth Yr..to.Da t e Cumulathe i1. Ilours In Reporting Period 745 7296 40656
- 12. Number Of liours Reactor Was Critical 0
5079.05 24963.56
- 13. Reactor Resene Shutdown llours 0
80.0 1209.22
- 14. Ilours Generator On.Line 0
5023.1 24388.48 3
4
- 15. Unit Resene Shutdown flours 0
0 0
- 16. Gross Thermal Energy Generated (\\lWil) 0 11782893.3 54461303
- 17. Gross Electrical Energy Generated I.\\lwil) 0 3984489.2 18488420 t
- 18. Net Electrical Energy Generated I.\\lWill 0
3788869 17534439
- 19. Unit Senice Factor 0.0%
68.85%
59.99%
l 20.. Unit Asailability Factor 0.0%
68.85%
59.997.
0.0%
66.417.
55.15%
- 21. Unit Capacity Factor (Using.\\lDC Net)
- 22. I' nit Capacity Factor IUsing DER Net) 0.0%
62.95%
52.28%
- 23. Uni Forced Outage Rate 0.0%
17.29%
26.85%
- 24. Shutdown. Scheduled Oser Nest 6 alonths t'l> pe. Date.and Duration on uni; CONTINUATION OF PRESENT REFUELING OUTAGE.
- 25. If Shut thewn \\t I:nd of iteport Period. I:stimated Date of Startup:
12/5/81
- 26. L nits in f est Status irrior io commercial operations-Forecast Achiesed 1/14l77 INIIl \\; rulIICAIIgy INill \\L LI ICittici ty 1/30/77 00\\itlERrs \\ L ort It a t ion 3/13/77 i
8111170343 011112 PDR ADOCK 05000302
'ol77 8 R
.WERAGE DAILY UNIT POWER LEVEL DOCKET No.
50-302
'JNI T FLCRP-3 DATE 11/A/R1 CO\\lPLETED BY M.W. Culver TELEPil0NE (904)795-6486 MONTil October. 1981 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL L%!We Net)
(Mwe.Neq 1
0 g7 0
0 2
0 g3 3
0 0
in 0
4 20 0
5 n
21 0
6 0
33 7
0 23 8
24 0
9 0
25 n
10 0
26 0
0 11 27 0
12 2s 0
13 0
29 0
14 30
_g 15 0
31 0
I f, O
INSTT(LT TION S Gn tha t-n:u a,t the neraes.En; a:ap.t n.., uwe.Nei n,r each Jay m the rep.irtin; m.inth. ('. impute to t he r.ca r e st,s hi je "le :1,ut !
(9!77 )
l b
O.
t l
UNIT SillllDOhNS AND POWER REDUCIlONS DOCKEINO.
50-302 UNil NAME M rnP-3 DAiE _ 11/4/31 COMI't.E'IED 11Y Lu enlunr R EPOR I MON iil _0c enhor 1981 l El.1 l'IION E 404NddA
[2
'h k N')
l icemee j-r, I'q Cause & Correctise N*
lhic r-9:
2 i:O l><e n t 77 E. ~:'
Atinen to j@
d 3 3; -
Repost r
$0 hC Paesent Recurrence I
e u
6.
81-51 811001 S
745 C
1 N/A EE BEEEEE Schdduled Refueling Outage.
s i
2 3
4 11 Forced Reason :
Method:
INinbit G Instructions S Smheduled A Lqmpment Fai!ure(Explain)
I. Manual for Preparation of Data 11 Maintenance of Test 2-Manual Scram.
Entry Sheeis for Licensee C Refueling 3 Automatic Serain.
Esent Report (1 ER) File (NURI G-D-Regulatory Restriction 4;Ot her ( Explain )
0161) l' Operator Training & l.ieense Examination F-Ad minist ratis e 5
G-Operational 1:e ror (Fxplain )
I shibit I - Same Source pt/77)
!! Ot her ( E xplain)
MONTHLY OPERATIONAL SUIS 1ARY STATDIENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 11/4/81 COMPLETED BY M.W. Culver TELEPHONE (ont)'o5-6/ 86-MONTH October. 1981
SUMMARY
STATDIE!U:
Unit down all month in a scheduled refueling outage.
(
(
I
(
l l
1 l
1