ML20032D294
| ML20032D294 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/23/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hancock J FLORIDA POWER CORP. |
| Shared Package | |
| ML20032D285 | List: |
| References | |
| NUDOCS 8111130603 | |
| Download: ML20032D294 (2) | |
See also: IR 05000302/1981018
Text
r
.
.
.
.
hh
'
'
SEP 231981
Florida Power Corporation
ATTN:
Mr. J. A. Hancock
Assistant Vice President
Nuclear Operations
P. O. Box 14042,' Mail Stop C-4
St. Petersburg, FL 33733.
Gentlemen:
!
Subject: Report No. 50-302/81-18
,
This refers to the routine safety inspection conducted by Mr. P. H. Skinner of
i
this office on August 31 - September 4,1981, of activities authorized by NRC
Operating License No. DPR-72 for the . Crystal River facility. Our' preliminary
findings were discussed with Mr. D. C. Poole, Nuclear Plant Manager, at the-
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. . Within these areas, the inspection. consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. .These items and references to pertinent
requirements are listed in *.he Notice of Violation enclosed herewith as- Appen-
-
dix A.
Elements to be included in your response are delineated in Appendix A.
,
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
One new unresolved item is identified in the enclosed inspection report. This
item will be examined during subsequent inspections.
,
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis-
- closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding;- and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such infor-
mation.
If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so
that a new due date may be established.
Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
~8111130603 811105
PDR ADOCK 05000302
G
j
,_
_ _ _ _ _ _ _ _ _ _ _ _ _
.
.
.
2 31981
Florida Power Corporation
2
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit. If we do not hear from
"
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A. Notice of Violation
2.
Inspection Report No. 50-302/81-18
cc w/ encl:
D. C. Poole, Nuclear Plant Manager
bec w/ encl:
Document Management Branch
State of Florida
RII,
LU
Mf
&j
RIIl
I
RII
RII
PII t
y
PSt. inner:ht
LJ ight
CNurphy
AFGi son
VBem<nlee
PJKe logg
9//f/81
9
81
9/p//81
9/pV81
9/LY81
94f81
.
. . . . . . _
.