Text
,
'
.-
,
e(l()d
Y
SEP 2 81981
Tennessee Valley Authority
ATTN: Mr. H. G. Parris
fianager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
Subject:
Report No(k259/81h50-260/81-26, and 50-296/81-26
This refers to the routine safety inspection conducted by Mr. R. F. Sullivan of
this office on July 27 - August 25, 1981, of activities authorized by NRC
Operating License Nos. DPR-33, DPR-52, and DPR-68 for the Browns Ferry facility.
Our preliminary findings were discussed with Mr. H. A. Abercrombie, Plant
Superintendent, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed -in the
enclosed inspection' report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During' the inspection, it was found that certain activities under your license
appear.to violate NRC requirements.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
,
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your -
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
g1130598s11106
ADOCK 05000259
G
'
.-
. .,
SEP 2 81981
o
,
Tennessee Valley Authority
2
specified periods noted above, the report will be placed in the Public Cocument
Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
R. C. Lewis, Director
Division of Resident and-
Reactor Project Inspection
.
Enclosures:
1.
Appendix A, Notice of Violation
-
2.
Inspection Report Nos. 50-259/81-26,
50-260/81-26, and 50-296/81-26
cc w/ enc 1:
H. J. Green, Director of Nuclear Power
H. L. Abercrombie, Plant Superintendent
R. E. Rogers, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
bcc w/ encl: