Forwards IE Insp Rept 50-309/81-17 on 810714-17 & 0810.No Noncompliance Noted
ML20032D042
Person / Time
Site: Maine Yankee
Issue date: 10/05/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Groce R
Maine Yankee
Shared Package
ML20032D043 List:
References
NUDOCS 8111130325
Download: ML20032D042 (2)


See also: IR 05000309/1981017

Text

__

~-

'

~

,

.

'

,

s

,.;

-

-

.

.

.

-

-

_

,

g

"J

.-

-

.

u

.

(

-

-

J

~

- 06T 0 5 196b, ,"

.

.

-

,

_.

_

'

'

, , '

.-

.

-

7_

y +-

.e

cu

4 _

.; e

'

%_

s

-

Docket No. 50-309:

%

] i, _

f

^4 x;

g

'

'i

E

_

,y _, }4cf

q

c-

,

3.

7..

_

'

.

. . ~ .

. .z

_g

. ,

- ;

Maine Yankee Atcmic Power Company.

~;

ee

,N !Q"

s

ATTN: Mr. Robert H. Groce

-

. 2

NOV1 2 1581 C

~

'

^

s

-

Senior Engineer - Licensing

1671 Worcester Road

-

' y u.s.eaun uaudou QIl , '

Framingham, Massachusetts 01701

'

'""

'

~~

Gentlemen:

"v //u

t

e

Subject:

Inspection 50-309/81-17

c,

.

.

This refers to the routine safety inspection conducted by Messrs. W. Lazarus

and P. Swetland of this office on July 14-17, 1981 and August 10-31, 1981 at ~

Maine Yankee Nuclear Power Station, Wiscasset. Maine of activities authorized

by NRC License No. DPP,-36 and to the discussions of our findings held by Mr.

P. Swetland with Mr. E. Wood of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

,

Within the scope of this inspection, no items of noncompliance were observed.

_

In accordance with 10 CFR 2.790 of the Comission's regulations, a' copy of '

this letter and the enclosed inspection report will be placed in the NRC's'

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

,

it is necessary that you (a) ;sotify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) sutnit within 25 days from the date of this letter a

written application to this office to withhold such information. Consistent '

f

with section 2.790(b)(1), any such application must be accompanied by an affi--

davit executed by the owner of the information which identifies the document or

part sought to be withheld, and which contains a full statement of the reasons '

on the basis which it is claimed that the information should be withheld from

,

public disclosure. This section further requires the statement to address

-

with specificity the considerations listed in 10 CFR 2.790(b)(4). The infor -

mation sought to be withheld shall be incorporated as far as possible into a

u

- q, q <

., .

,

.

.*. ( ~ ;

'

v;

.

,

l

-

-

.

/-

-

^.L

-

',

.

_

DO

DR

~.

l

0

3n)

'

")- (h

_ . ,

,

-s

-

1

DRP11A

D,RPf1A

_

@E'[

DRLI JA

.

'

!

, orrice ,

-

,

SURNAME >

SWET

ccf

L

..

BR

E.

'

.

s

,

.

- - - -

. . . + - -

,

DATE > __Jf23_l81

9My_81____9_

jg/ .--bb/J /

-

NRC Form 318 (RI) (5-76) NRCM 02040

. u s. cove nnusur ensurino orrier: n iis e.3 1 1. ,

-

.

,

--

.

.-

i

.

Maine Yankee Atanic Power

2

OCT 0 5 HB1

Company

.

separate part of the affidavit.

If we do not hear from you in this regard

within the specified periods noted above, the report will be placed in the

Public Document Room. The telspitne notification of your intent to request

withholding, or any request fer an extension of the 10 day period'which you

believe necessary, should be made to the Supervisor, Files, Mail and Records,

USNRC Region I, at (215) 337-5223.

No reply to this letter is reqJired; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

-Sincerely,

Orfrinal Signed EYtQ

Eldon J. Brunner, Chief,

Projects Branch #1, Division of

Resident and Project Inspection

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-309/81-17

_

cc w/ encl:

E. Wood, Plant Superintendent

E. W. Thurlow, President

J. H. Garrity, Director, Nuclear Engineering & Licensing

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

l

State of Maine

l'

bec w/ encl:

Region I Docket Room (with concurrences)

Chief,OperationalSupportSection(w/oencis)

l

l

l

,