Forwards IE Insp Rept 50-373/81-30 on 810629-0828 & Notices of Violation,App a & B.App B Withheld (Ref 10CFR2.790)
ML20032C217
Person / Time
Site: LaSalle 
Issue date: 10/02/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20032C218 List:
References
NUDOCS 8111090502
Download: ML20032C217 (2)


See also: IR 05000373/1981030

Text

--

-.

_

_

.

-.

T h bAA#

.

..

.

.s

'4

rut L ~:g.

i

OCT 3

1gm

.

to

N

Docket No. 50-373

%

D

Commonwealth Edison Company

p

gOP ^

g

ATIN:

Mr. Cordell Reed

J

O

Vice President

  1. '4

6 /

-""

/h

Post Office Box 767

%

A

Chicago, IL 60690

Gentlemen:

'h

8

.m

This refers to,the routine inspection conducted by Messrs. R.

alker,

.

S. E. Shepley, N. J. Chrissotimos, S. DuPont, and P. Byron of this office

on June 29 through August 28, 1981, of activities at the LaSalle County

Nuclear Station, Unit 1, authorized by NRC Construction Permit No. CPPR-99,

'

to the discussion of our findings with Mr. R. H. Holyoak at the conclusion

of the inspection, and to the management meetings held on July 27, 1981,

August 14, 1981, and August 20, 1981 between Mr. James G. Keppler and others

of this office and Mr. J. J. O'Connor and others of his staff.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Wi thir: these areas, the inspection consisted of a selective

examination of premhes and representative records, observations, and

interviews with peta.snel.

.

During this inspection, certain of your activities appeared to be in non-

,

compliance with NRC requirements, as described in the enclosed Appendices

,

A and B.

A written response, submitted under oath or affirmation, is

'

.

required. Areas examined during this inspection and discussed in Appendix

B concern subject matter which is exempt from disclosure according to

Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code

of Federal Regulations.

Consequently, Appendix B to this letter and

your response to the nonconpliance identified in Appendix B to this

letter, will not be placed !n the Pubile Document Room. Your statement

t

of corrective action rega;d R ; the n a c,mpliance identified in Appendix B

to this letter should be t nomitted as a separate enc 1c sure to your trans-

!

mittal letter.

In accordance with 10 CFR 2.790 of the Commissions's regulations, a copy

of this letter, Enclosures 1 and 3, and your response to E closure 1 to

this letter, wi?.1 be placed in the NRC's Public Document Room.

If Enclosures

1 and 3 to this letter contain any information that you or your contractors

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within seven (7) days from the

date of this letter of your intention to file a request for withholding; and

(b) submit within twenty-five (25) days from the date of this letter a

a

written application to this office to withhold such information. Section

f/[6'f

2.790(b)(1[ requires that any such application must be accompanied by an

JE N

i

>

4.s

fyI

-

N

ed

8111090502 811002

j

' '

"

As

pf

PDR ADOCK 05000373

Cep/

,p ] ' copics /

E ,Cs.

(go

pf

G

PDR

C

P

i

,_

.

TPi3 DCC! M U iS O T T3 DI

gA

@t

Attachment Contains

t

.dg,t

10 CFR 2.790(d) Inforn>ation

gggn

gggg g.TT'M EW

7

,

'

g

.

-

.

'

-

.

.

-

,

.

.

Commonwealth Edison Company

-2-

affidavit executed by the owner of the inforr.ation s'aich identifies the

document or part sought to be withheld, and which contains a full statement

of the reasons which are the basis for the claim that the information

should be withheld from public disclosure. This section further requires

the statement to address with specificity the con.siderations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-

porated as far as possible into a separate part of the affidavit.

If we

do not hear from you in this regard within the specified periods noted

above, a copy of this letter, the enclosures, and your response to this

letter will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

.3*d"

R. L. Spessard, Director

Division of Resident & Project

Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

Appendix B, Notice

of Violation 2.790(d)

3.

IE Inspection Report

No. 50/373/81-30

cc w/encls:

Louis 0. De1 George, Director

of Nuclear Licensing

L. J. Burke, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson

Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

cc w/ encl, w/o Part 2.790(d)

Information:

Mary Jo Murray, Office of

Assist nt, Attorney Generap RIII b [ RIII , h RIII k, RIII(t h RII

7t

f

,

pg

RIIIgG,

RIII

Chriss'oticos/jp

Byron (F Walker]y

M Reimann

Knop 6

Spessar

Shepley

9/30/81fc,l

gpq f

/c -j-gj

10/.2/p

Attachment Contains

10 CFR 2.790(d) Information