Forwards IE Insp Repts 50-245/81-11 & 50-336/81-10 on 811015 & Notice of Violation.Insp Rept Withheld (Ref 10CFR2.790)
ML20032B928
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 10/15/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20032B929 List:
References
NUDOCS 8111060523
Download: ML20032B928 (3)


See also: IR 05000245/1981011

Text

, - .

..

'

.

o*

q

ENCLOSURES TRANSMITTED HEREWITH

_,' ' '

-

CONTAIN 10 CFR 2.790'INFORMAT10N

+

s

.

-

.

-

~

,

.

4

Docket Nos. 50-245

.00T 15.1981

,

IYi

~

.a

50-336

t

A

- .

.-

>

Northeast Nuclear Energy

ny

..

_

.

'

ATTN: .Mr. W. G. Couasil

..

-

-

Senior Vice President - Nuclear.

.

NOV0'51981m -9

'

Engineering and Operations Group

.v.a. g 7

.

-

-

P. O. Box 270

g

g

.-

Hartford, Connecticut 06101 .

V

s

4

-

Gentlemen:

'

Subject: Combined Inspection 50-245/81-11 and 50-336/81-10

'

This refers to the routine safety. Inspection conducted by .% srs. J. Shediosky

and D. Lipinski of this office on July 12 through September 26, 1981, at the

Millstone Nuclear Power Station, Waterford, Connecticut, of activities authorized

by NRC License Nos. DPR-21 and DPR-65 and to the discussions of.Our findings.

held by Mr. Shedlosky with Mr. firoczka.and other members of your staff periodi-

cally during the inspection .

Areas examined during this ins'pection are described in the Office of Inspection

!

and Enforcement Inspection Report which is enclosed with this letter. Within-

these areas, the inspection consisted of selective examinations of procedures

and representative records, -interviews with-personnel, measurements made by the

inspector, and observations by the inspector.-

Based on the results of this inspection, it appears. that certain of your.activi-

ties wera not conducted in full compliance with NRC requirements, as set forth

>

in the Notice of Violation, enclosed herewith as Appendix A.

These items of

noncompliance have been categorized into the levels described in the Federal

Register flotice (45 FR 66754). dated October 7,1980. .You are required to re .

,

!

spond to this letter and in preparing your response, you should follow the

l

instructions in Appendix A.

-

-

i

In accordance with 10 CFR 2.790 of. the Comission's regulations, a copy of this.

letter and the enclosures will be placed in the NRC's Public Document Room.

If

,

this report contains any information that you-(or your contractors) believe to

'

!

be exempt from disclosure under 10 CFR.9.5(a)(4), it is necessary that you (a)

notify this office by telephone within ten (10) days from.the date of- this

letter of your intention to . file.a-request for withholding; and (b) submit

~

within 25 days from the date of this letter a written application to this office

'

to withhold such infonnation.. Consistent with section 2.790(b)(1), any such

h

!

application must be accompanied by an affidavit executed by the owner of the

he

OhK OSOOh[k5

h

PDR

.

&

4',

p._-

59

--

--.___-Q

l

o"ich,RI;DRPI /

.f. ,RI. ;DRPI .

.

T

,RI ;DRP I,,

i

,!,

.t.

l =d.Shedipsky/,c.1c, E1,sa.sser,,4[, EI.:DE. I.

,

Dev,l i,p.

. . .

, B ru n n e r , , , , , , j , , , , , , , , , . . . .

!

'

%. . . j.3.(.

. . .%. . g.. I .c d MMFidJED! HEREWITH

j

fGk0 UFES Tri

IT

,

=

lNF6R M HON- _ r-

_

-:

_

j....

j NRC FORM 318 (10-80 NRCM 0240

gpg{

--

.

.

ENCLOSURES TRANSMITTED HERc/!iTH

..

CONTAIN 10 CFR 2.790 INFORMATION

-

.

.

.

Northeast Nuclear Energy Company

2

OCT 151981

-

information which identifies the document or part sought to be widheld, and

which contains a full statement of the reasons on.the basis which it is claimed

that the information should be-withheld fmm public disclosure. This section

further requires the statement to address with specificity the considerations

listed in 10 CFR 2.790(b)(4). . The information sought.to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If we do

not hear from you in this regard within the specified-periods noted above, the

report will be placed in the Public Document Room. The telephone notification

of your intent to request Mthholding, or any request for an extension of the 10

day period which you beliea necessary, should be made to the Supervisor, Files,

Mail and Records, USilRC Region I, at (215) 337-5223.

Should you have any questions 'concerning this inspection, we will be pleased to

discuss them with you.

-

Sincerely,

.

,Qriginal Signed BY 8 '

.

Eldon J. Brunner, Chief, Projects

.

Branch #1, Division of Resident

and Project Inspection

Enclosures:

1.

Appendix A, flotice of Violation

2.

Combined Office of Inspection and Enforcement Inspection

Report tiumbers 50-245/81-11 and 50-336/81-10

.

cc:

.

J. F. Opeka, Vice President, fluclear Operations (w/cy of encls)

E. J. Mroczka, Station Superintendent (w/c,y of encis)

D. G. Diedrick, lunager of Quality Assurance (w/o Page 24 of Rpt)*

R. T. Laudenat, Manager, Generation Facilities Licensing (w/o Page 24 of Rpt)*

Public Document Room (PDR) (w/o Pa e 24 of Rpt)*

Local Public Document Room (LPDR) w/o Page 24 of Rpt)*

Nuclear Safety Information Center flSIC) (w/o Page 24 of Fpt)*

NRC Resident Inspector (w/cy of encis)

State of Connecticut (w/o Page 24 of Rpt)*

  • Contains 2.790 Infonnation

.

bec:

Region I Docket Room (with concurrences) (w/o Page 24 of Rpt)*

Chief, Operational Support Section (w/o encis)

  • Contains 2.790 Information

ENCLO3URES TRANSWTTED HERP//!TH

CONTAIN 10 CFR 2.790 InFon ,; nan

"'c">

. ....

..

.

..

..

"""'"4

.... .. ..... .

.

. . . .

..

.

. ..

DATEf

.

. ... ..

... .. .. .. .. .

.. ..

.... . .

.

..

. .

.

.

..

..

.. .

"""""*''"""2'

OFFICIAL RECORD COPY

_,

,_