Text
V
.
,
-
.
.
OCT 15 19M
Docket No. 50-278
____
[$. \\S
4
Philadelphia Electric Company
N(LL YP,,N.
ATTN: Mr. S. L. Daltroff
-
Vice President
U
\\
Electric Production
3-
L
NOVO 41981> T
i
2301 Market Street
-.
Philadelphia, Pennsylvania 19101
7
v. s.
Gentlemen:
J
Subject:
Inspection 50-278/81-21
m
This refers to the routine safety inspection conducted by Mr. W. Rekito of
this office on August 31, 1981 to September 8, 1981, at Peach Bottom Atomic
Power Station, Unit 3, Delta, Pennsylvania, of activities authorized by NRC
License No. DPR-56 and to the discussions of our findings held by Mr. Rekito
with Mr. W. T. Ullrich of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This item of noncom-
pliance has been categorized into the levels described in the Federal Register
Notice (45 FR 66754) dated October 7, 1980. You are required to respond to
this letter and in preparing your response, you should follow the instructions
in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractors)
believe to be uempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within ten (10) di
~ ,m the
date of this letter of your intention to file a request for wi,
,g; and
(b) submit within 25 days from the date of this letter a written opplication
to this office to withhold such information.
Consistent with section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the owner
of the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons on the basis which it is
RI:TPS
RI:TPS
RI:PSS
RI:RES 2B
RI:PB#2
R
Bettenhausen
Ebpeter
McCabe
Ke_imig
g,e3ito/mjd
Sr-
An
$4
@
QW
8 81
l'0/d/81
10/m /81
10/$/81
10/2/81
1
0FFICIAL RECORD COPY
gi%h
0
k
[
o
i' i
W
.
'
Philadelphia Electric Company
2
OCT 15 1981
claimed that the information should be withheld from public disclosure.
This
section further requires the statement to address with specificity the consider-
ations listed in 10 CFR 2.790(b)(4). The information sought to be withheld
shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted
above, the report will be placed in the Public Document Room. The telephone
notification of your intent to request withholding, or any request for an
extension of the 10 day period which you believe necessary, should be made to
the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
R.R.Keimig, Chief, Pro %jects
e.C. AC.&,3w , %
%
Branch No. 2, Division of Resident
and Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection Report Number
50-278/81-21
cc w/encis:
W. T. Ullrich, Station Superintendent
Troy B. Conner, Jr. , Esquire (Without Report)
Eugene J. Bradley, Esquire (Without Report)
Raymond L. Hovis, Fsquire (Without Report)
Michael J. Scibinico, II, Assistant Attorney General (Without Report)
Public Document Room (PDR)
Local Public Document room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bcc w/encls:
Region I Docket Room (with concurrences)
Troy B. Conner, Jr. , Esquire
Eugene J. Bradley, Esquire
Raymond L. Hovis, Esquire
Michael J. Scibinico, II, Assistant Attorney General
Chief, Operational Support Section (w/o encls)
0FFICIAL RECORD COPY
_