Text
c.
._
-
YELLOW
'
'
OCT 131981
fCU l
Mississippi Power and Light Company
[k
[hg
ATTN: Mr. N. L. Stampley
8/
f
Vice President of Production
i
LU
'
-
fMVO q 793k
P. O. Box 1640
"8
Jackson, MS 3920E
coS
11
% ,J o ? 'oer q
Gentlemen:
'O
&
Subject: Report nom 16/81-4_l) 50-417/81-18
' % ;[f
C
r
-
This refers to the routine safety inspection conducted by Dr. D. M. Montgomery
and Mr. G. R. Jenkins of this office on September 30, 1981, of activities
authorized by NRC Construction Permit Nos. CPPR-118 and CPPR-119 for the Grand
Gulf facility and to the discursion of our findings held with Mr. C. K. McCoy,
Plant Manager at the conclusion of the inspection.
Areas examined during this inspection are discussed in the enclosed inspection
report.
Within these areas, the inspection consisted of discussions with
licensee management representatives by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordante with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure .:nder 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information. If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
of 4ce promptly so that a new due date may be established. Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure.
This section further requires the statement to address with
. specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of +he affidavit.
If we do not hear from you in this regard within the
!
specified periods noted above, the report will be placed in the Public Document-
Room.
4
8111050701 811013
PDR ADOCK 05000416
""
e
ret
.
in
,
.
OCT 131981
.
-
o
Mississippi Power and Light Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosures:
Inspection Report Nos. 50-416/81-41
and 50-417/81-18
cc w/ encl:
D. C. Gibbs, Vice President
Middle South Energy, Inc.
C. K. McCoy, Plant Manager
-
bec w/ encl:
NRC Resident Inspector
Document Management Branch
State of Mississippi
f
RII
RII
RII
RII
RII
JPStohr:ejw
DMMontgomery
GJenkins
PTaylor
RClewis
10/ /81
10/ /81
10/ /81
10/ /81
10/ /81
.