ML20032B450
| ML20032B450 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 10/02/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20032B451 | List: |
| References | |
| NUDOCS 8111050558 | |
| Download: ML20032B450 (2) | |
See also: IR 05000324/1981022
Text
,,
-
,s
3-
OCT 2 - 1981
%
[pn"/ ' I} 9
o
r
.
Carolina Power and Light Company
ATTN: Mr. J. A. Jones, Senior Executive
%
NOVO 41981
]ij
-
.Vice Presidert and Chief
Operating Officer
d
u.s. nnen . .
411 Fayetteville Street
gi
"'"
~
Raleigh, NC 27602
h
'
,
Gentlemen:
@h
Subject: Report Nos g5/81-Md 50-324/81-22
This refers to the special safety inspection conducted by Mr. J. J. Lenahan of
this office on September 15-18, 1981, of activities authorized by NRC License
Nos. DPR-71 and DPR-62 for the Brunswick facility and to the discussion of our
findings held with Mr. C. R. Dietz, Plant Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
'
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
"
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your inten-
tion to file a request for withholding; and (b) submit within twenty-five days
from the date of this letter a written application to this office to withhold
such information. If your receipt of this letter has been delayed such that less
than seven days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
4
8111050558 811002
PDR ADOCK 05000324
G
[
. . - - . .
,,-
. - ,
.
} e i
e
-
.
Carolina Power and Light Company
2
OCT 2 - 1981
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
D
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report Nos. 50-325/81-22
and 50-324/81-22
cc w/ encl:
C. R. Dietz, Plant Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of North Carolina
RI
g
RII
RII
RII
RII
RII
RII
J Lenaba aw
TConlo
hy AFG
n
CJ Tian
R
c
RC L.
s'
29/ //81
CM/ /81
Op/# /81
93/ /81
{/
/
7
/81
GM//81
/8
f
I
L
ic
L
/o
/p
i